New 10 stall Supercharger to be built in Beverly, MA at the North Beverly Plaza (Dodge St. exit off Yankee Division Hwy. [~20mi. NNE of Boston Common]). Unfortunately, Beverly's online permitting service totally sucks to use, so I'm just attaching a screencap of the electrical permit for the install which was issued on 2018-08-09. I'm not sure whether, in addition to the "electrical" one, Beverly requires a separate "building" permit. I wasn't able to find one, so it's possible that this site doesn't yet have all the needed approvals to start construction even though they've had the electrical permit approved for a while. Or it could just be that the crappy search functionality of Beverly's site made it impervious to my search-fu.
Map link to location: 55 Dodge St.; Beverly, MA; 01915
-------
The source for claiming that 10 stalls will be put in as well as for the particular location in the parking lot of the plaza where I dropped the pin in the linked google map is the Beverly Planning Board meeting discussing/approving the project. I've also attached a PDF of the relevant portion of the minutes from the meeting on 2017-12-19 (can't get a direct link to work).
@BlueShift
Map link to location: 55 Dodge St.; Beverly, MA; 01915
-------
The source for claiming that 10 stalls will be put in as well as for the particular location in the parking lot of the plaza where I dropped the pin in the linked google map is the Beverly Planning Board meeting discussing/approving the project. I've also attached a PDF of the relevant portion of the minutes from the meeting on 2017-12-19 (can't get a direct link to work).
@BlueShift
Attachments
Last edited: