When I was at the site October 3 there were no trenches. It appeared all the underground work was done. What was left was to install the three V3 tesla charging cabinets which were not on site, as well as the 12 Tesla charging stalls. The conduits for all of this were visible poking out of the ground.
Others posted photos showing the large utility transformer is installed, and the pads and conduit stubs ready for the charger cabinets.
I posted a photo showing the new metal high-voltage utility pole is installed, with coiled cable ready to run overhead to the town substation right across the alley.
All these things lead me to leave we are waiting for Tesla to deliver charging cabinets and charging stalls. This delay is very unusual, no way to know how long the wait; it could be any day. Once that happens I would think it would take only a few days to make the connections, wiring everything up. Then there would be an inspection and a Tesla technician would visit the site to do the final checks and activate the station.