Credit to Tesla Model 3 Quebec FB group. Looks like we have a tesla supercharger coming 2605 Rue d'Annemasse, Boisbriand, QC J7H 0A5
Boisbriand, QC Along National Highways: QC-15, QC-640 QC-15 From: Laval, QC - 14.2 km To: End (QC-117 Sainte-Agathe-des-Monts, QC) - 70.7 km Diversion: 0 km From: Montreal, QC - 28.9 km QC-640 From: QC-344 Oka, QC - 20.2 km To: Mascouche, QC - 26.2 km Diversion: 0 km To: Terrebonne, QC - 33.5 km To: Mont-Tremblant, QC (QC-15,QC-117) - 96.2 km To: Ottawa, ON (Urban) (QC-15, QC-50, QC-5) - 175.5 km To: Casselman, ON (QC-15,QC-50,QC-344,l,ON-34,ON-417) - 129 km
Not surprising location, in the Faubourg by the 15 / 640, easily accessible from both highway. Good food / toilet locations nearby. Will be helpful coming back from the North. Laval is near, but could be a good option between Saint-Jérôme / Mascouche. Look like this place exactly : Google Maps. 8 stalls unless they go L shape ? Let's just hope it doesn't become another Charlemagne.
Not sure if anyone noticed but a lot of the locations on the coming soon map correspond to future ChargePoint locations for IGA. almost all of them, see link: https://www.newswire.ca/news-releases/new-electric-vehicle-chargers-coming-to-quebec-and-new-brunswick-820047875.html
You've done it again. Better you and not me. I wouldn't want this job of posting the distances. You seem to enjoy it. Good for you. I don't see the practicality of this location. I hope this isn't a Gatineau replacement.
I think it's a Montreal region Supercharger on QC-15,which is the route to the Laurentides. I shouldn't worry about it replacing a Gatineau, QC.
Why do you think that? To me that seems to close to this one. They should put it close to the Casino so those going up North to Cantley can benefit (and then it wouldn't be really far for the Aylmer folks either).
I visit this morning and there is no change. It is in the IGA food store parking lot. If it is the same as the one in Terrebonne (still in construction for more than 500 days) don't expect it soon.
IGA has a target date for most of the chargepoint ChaDeMo (62.5KW to 125 KW) stations to be finished before Fall 2021. Id assume construction for the tesla supercharger will start after the ChargePoint locations. Hopefully, the Q2 and Q3 labels on tesla find us will be somewhat more accurate.