I just stop by the area and it appears the construction has already begun. The charge will be next-door to the boot barn.
WE COULD BUILD OUR OWN SUPERCHARGER WITH THOSE PLANS! Quick, download it into the droid....I hadn't seen that paperwork before on other sites. Did they just leave it laying around?
WE COULD BUILD OUR OWN SUPERCHARGER WITH THOSE PLANS! Quick, download it into the droid....
I don't have a spare R2 unit available but
We get
* lat and long
* address
* property owner (name, address, phone)
* contract engineer (name, address, email, phone, fax)
* Tesla supercharging division info (address in Palo Alto not Fremont, phone number)
I thought it was interesting.
I have already sent that pic to my 3D printer.WE COULD BUILD OUR OWN SUPERCHARGER WITH THOSE PLANS! Quick, download it into the droid....
A Fair question. I don't think it's unreasonable to look at the Charleston construction schedule as an example. It could very well be the same crew that does it too. Of course, no guarantees though right?Sorry for the double post, but to any of you who are local, what do you think the odds are that this will be ready by June 21, 2017? I need it just a little too much.
The Myrtle Beach location was complete in 24 days. I think a lot of the time is waiting for the utilities to allow the power to be turned on.Sorry for the double post, but to any of you who are local, what do you think the odds are that this will be ready by June 21, 2017? I need it just a little too much.
Sorry for the double post, but to any of you who are local, what do you think the odds are that this will be ready by June 21, 2017? I need it just a little too much.