You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Or maybe Saguenay?All visible work done including paint, new lines etc. Stalls power still off, waiting for Hydro-Quebec perhaps and then final tests.
The workers are all gone with their equipment.
Now time to find out where there are heading next! Pointe-Claire ? Laval ? Charlemagne ? Saint-Sauveur ? Mont-Tremblant ?
View attachment 250386 View attachment 250387 View attachment 250388 View attachment 250389 View attachment 250390 View attachment 250391 View attachment 250392 View attachment 250393
I just wonder if some of the urban Superchargers could be worked on this winter. Even in Canada the weather inside parking garages isn't too bad for working. Just musing a bit. Realistically, I am not really expecting anything more this year either.How about here in Ontario where we have had zero SCs open in 2017? Levis and Brossard are the only two SCs under construction in Eastern Canada so far this year - and there isn't much time left in the year.
That's true but most of these locations were more suburban than urban. My guess is that they would go in outdoor strip malls rather than parking garages. I am talking about places like Markham, Mississauga (X2), Pickering, Richmond Hill, Cambridge, etc. There are far more urban sites planned for 2018, at least in Ontario.I just wonder if some of the urban Superchargers could be worked on this winter. Even in Canada the weather inside parking garages isn't too bad for working. Just musing a bit. Realistically, I am not really expecting anything more this year either.
I assume some will open up in the GTA and BC since it doesn't get all that cold during winter.How about here in Ontario where we have had zero SCs open in 2017? Levis and Brossard are the only two SCs under construction in Eastern Canada so far this year - and there isn't much time left in the year.
Matthy, that's great! Do you have any more details? And by Mascouche, do you mean Repentigny? The supercharger roll-out map on tesla.com looks like Repentigny, and to be honest, it would be more practical to be in Repentigny than Mascouche I think.
Do you have an exact address for the Mascouche one?
Yes! In Mascouche will be at SMARTCENTRES MASCOUCHE and in Laval will be at CARREFOUR LAVAL. The work is achedule to start next week at both locations. Can’t share the plans for confidentiality purpases.
Yes! In Mascouche will be at SMARTCENTRES MASCOUCHE and in Laval will be at CARREFOUR LAVAL. The work is achedule to start next week at both locations. Can’t share the plans for confidentiality purpases.
Premature for that. This is one unconfirmed report. We'll have to see permits or evidence of construction first, IMO.Someone should have these added to supercharge.info - and perhaps start a new thread.
@Matthy did mention that he "Just got the plans" so it sounds like he has seen permits or some sort of evidence.Premature for that. This is one unconfirmed report. We'll have to see permits or evidence of construction first, IMO.
Premature for that. This is one unconfirmed report. We'll have to see permits or evidence of construction first, IMO.