I see where the new SC map shows that the Brownsville supercharger will available during the 1st quarter of 2021. Now that there are more Starship launches from Boca Chica, most likely be more Tesla’s belonging to out-of-town SpaceX fans.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
If anyone's interested, the city of Brownsville just sent me this Vimeo they made, in which there's a few photos of the plans and the exact location.
Some Waco chargers are 250kW. I've seen 184kW flowingI assume 250, and if so. it will be the first in Texas.
Only two that I saw. Looks like they haven’t all been delivered as they are laying pipe for more than 2. I would give a number but I’d be wrong.Only two boxes, or are there more that weren't in the picture?
You can catch a peek at the site plans in the video Marco uploaded in this post. It shows 8 supercharger stalls, which means only 2 V3 supercharger cabinets. And that's what's in the picture. The rest of the back-end hardware cabinets either weren't in the shot or haven't been delivered yet.Only two boxes, or are there more that weren't in the picture?
This may be more info than anyone wants...
looks like a spring break trip to South Padre is now doable