All the pedestals are in, none of the cabinets
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
FYI - those have been there for a while...I drove by this morning. It seems that the cabinets have arrived on scene. View attachment 796781
there are some delays related to Eversource....
I went by today. No changes, but I did notes that all spots have 'Tesla Parking Only' signs. Initially this was not clear.Monday 6/60 update. Tesla Energy on-site doing pre commissioning. Goal is to have it online by 7/4. Hoping to have Eversource run the cables from the manhole to transformer and from ther to superchargers by 7/1.
View attachment 818861
What component goes in this space? Eversource has a big-ass transformer on site, there are various white Tesla cabinets already in place (but no powermeter, just a socket).I've been checking this site pretty much daily when I've been around. Almost no change. I did notice that on June 10th (day after my previous "no changes" update there had been a subtle change where Eversource had returned to do some prep work to pull cable from the transformer into the vault. Sadly, the same can't be said for the primary conduit coming into the vault from the manhole in front of sweetgreen. There have been no changes from 6/10 through last night when I last checked.
I'm half expecting that when the time comes to do the cable work it will happen overnight due to the traffic in and around this area during the day.
View attachment 817297View attachment 817298
To be honest, I'm not exactly sure. I'm pretty sure this is just a splice or junction box for the feeds coming from the street to the transformer, and then from the transformer to the supercharger cabinets. I'm not sure if there is an additional box is dropped into what's already there, or if they just secure a cover on top of it once wiring is completed. I haven't heard any specifics about Burlington in this regard. A quick conversation with a contractor working the site a few weeks ago suggested Burlington should be done sometime in July.I went by today. No changes, but I did notes that all spots have 'Tesla Parking Only' signs. Initially this was not clear.
What component goes in this space? Eversource has a big-ass transformer on site, there are various white Tesla cabinets already in place (but no powermeter, just a socket).
Interesting - the last published plan I found called for 8 tesla charging only dedicated stalls and 4 other signs (although the exact sign wording was not in the plan as it frequently is). The plan also shows the splice box and transformer locations reversed to where they ended up as-built - not sure if that was an eversource error, a contractor error, or a final design change that wasn't published. It's possible the eversource conduit that was done last November came in at the wrong place and they've just adapted the build onsite.I went by today. No changes, but I did notes that all spots have 'Tesla Parking Only' signs. Initially this was not clear.