Although "they are waiting to deploy v3" is an interesting theory, it seems to clash with the fact that supercharger equipment is already in boxes on-site, and has been for the greater part of a year.
More likely that there's a hold-up with the host location or possibly a capacity issue with the electrical infrastructure (similar to what I suspect may be the cause of the hold-up at the Fontana location).