You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Drove by tonight. No power to the meter yet. Progression will be power to the meter on the side of the transformer (display shows something) and then final checks and activation. Could be a few days to a week or more after the meter shows power to the time it works.
Meter in transformer looks on with a bunch of “0000” on it.
This place is going to be a disaster in terms of ICE parking at the chargers. It’s always full.
No power to the chargers, but the transformer had “00000000” on the display vs a bunch of flashing letters before. Not sure if that means anything but it’s a change.
No power to the chargers, but the transformer had “00000000” on the display vs a bunch of flashing letters before. Not sure if that means anything but it’s a change.
Meter in transformer looks on with a bunch of “0000” on it.
This place is going to be a disaster in terms of ICE parking at the chargers. It’s always full.