Supercharger - Chicopee, MA

This site may earn commission on affiliate links.

Tdreamer

Plaid Supercharger
Supporting Member
Sep 10, 2017
3,164
7,822
Bedford, Massachusetts
Permit C-21-0810 has been found for the coming soon Chicopee, MA Tesla Supercharger at the Big Y supermarket at 650 Memorial Drive, Chicopee, MA.

While the permit shows this as with 12 stalls, it also states only two supercharger cabinets which would be consistent with an 8 stall V3 site, possibly with four collocated L2 charging spots (chargepoint?) as Tesla has been doing at a number of recent Target locations in the region.

This site is listed on the Tesla coming soon map as Q4'21 meaning construction could begin soon. Looking forward to reports on signs of construction from anyone local to the area.

@MarcoRP @tes-s @corywright
 

Attachments

  • Chicopee Tesla Supercharger Building Permit.pdf
    103.1 KB · Views: 77
Nice location for MassPike travellers. It looks like it will be at the Big Y Supermarket which is the major local grocery store chain. Massachusetts has recently renumbered the exits on the MassPike based on the mileage from the NY/MA state line (finally consistent with the rest of the Interstate Highway System). The Chicopee exit is now Exit 49 but all the locals will still call it Exit 5. Nevertheless is it more convenient for MassPike drivers than the West Springfield supercharger near Exit 45 (46?) which used to be Exit 4.

Big Y also has the supercharger at the Lee exit near the NY state line - now Exit 10 (or 11?) but used to be Exit 2
 
This site is currently under construction. Here is an updated photo!
 

Attachments

  • 4EE813D0-20A4-4567-804C-136B2823E063.jpeg
    4EE813D0-20A4-4567-804C-136B2823E063.jpeg
    235.5 KB · Views: 305
If you have a chance - check to see if there is a meter in place near the switchgear or transformer. They may be doing final electrical work already meaning the gating factor for having Tesla come to commission the site would be the meter and final inspections.

The crew may very well be trying to complete the site today so they don't have to return next week... They did this in Williston, VT (worked a super long Friday so they wouldn't need to send the crew back the next week except for one person for inspections).
 
  • Like
Reactions: kayak1
Stopped by today. Construction equipment still there. Sorry didn’t read the most recent post about looking for a meter until getting home. 12 stalls up. Maybe space for one more although 13 doesn’t seem likely.
 

Attachments

  • 0856324B-6B7A-41DE-9CAD-97D781818D4D.jpeg
    0856324B-6B7A-41DE-9CAD-97D781818D4D.jpeg
    856.1 KB · Views: 118
  • 4E5A51CA-F05F-4278-8DAD-37FCD2C5A47D.jpeg
    4E5A51CA-F05F-4278-8DAD-37FCD2C5A47D.jpeg
    892.1 KB · Views: 110
  • 9E8D9207-4AF6-45DB-8E7B-3B101B7B4FFE.jpeg
    9E8D9207-4AF6-45DB-8E7B-3B101B7B4FFE.jpeg
    774.8 KB · Views: 112
There were 3 people working onsite with two Tesla trucks and one Model S
encouraging... not showing in-car yet. While the sites can show in-car within a very short time post-activation (like w/in 30 minutes), we've also recently seen some sites taking days before they show up, even though they are online (Lexington, MA). So any local checks to see if these are now live would be great!
 
  • Like
Reactions: kayak1