Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Clearwater, MN

This site may earn commission on affiliate links.

ItsNotAboutTheMoney

Well-Known Member
Jul 12, 2012
15,091
15,829
Maine
In the Minnesota Future Location discussion thread, @Evbwcaer posted evidence of a possible Supercharger at Clearwater Travel Plaza.
https://teslamotorsclub.com/tmc/posts/1802145/

The post includes a link to a permit that mentions Tesla:
Permit

Given the limited possibilities, and the proximity to I-94 it looks like a good chance that it is indeed a Supercharger site.

Then perhaps Alexandria, MN and then Fargo, ND.
 
The permit is very likely to be a supercharger since Tesla has said they were going to be putting one in near St Cloud this fall. Since the permit was issued October 12th and they have requested an inspection, it's pretty clear it is under construction even though nobody from TMC has stopped by yet to take a look and report to the forum.
Only two weeks between the permit being issued and the inspection request?
Sounds more like work to support a destination charger.

I agree that Clearwater is a great location for a SC and the timing makes sense. But the short time between permit and inspection doesn't make sense to me?
 
One of the Minnesota Tesla Club Facebook group members called up the Clearwater Travel Plaza and confirmed there will be eight supercharger stalls. One of the club members plans to swing by to take a look.

Remember that Tesla sometimes gets pretty far along on some of the Supercharger installations before anybody notices. For example, Childress, TX never popped up as a blue dot or a cone. It suddenly appeared as an operational location.
 
From our guy on the ground.
 

Attachments

  • 14856052_10201803021832766_6527454344237093639_o.jpg
    14856052_10201803021832766_6527454344237093639_o.jpg
    517.4 KB · Views: 341
  • 14890517_10201803018032671_1793608070493404381_o.jpg
    14890517_10201803018032671_1793608070493404381_o.jpg
    460.4 KB · Views: 307
  • 14856072_10201803021592760_6582057034690478858_o.jpg
    14856072_10201803021592760_6582057034690478858_o.jpg
    502 KB · Views: 292
No longer in doubt :)

Which means ...

Clearwater, MN

Interstates: I-94
US Highways (<= 5 miles): US-10, US-52

I-94:
From: Start (I-90, Lockwood, MT) - 779 miles
To: Oakdale, MN (I-94, I-694) - 68.1 miles
Diversion: 0.1 miles
From: Billings, MT (I-90, I-94) - 792 miles
To: Albert Lea, MN (I-94, I-35) - 146 miles
To: Winnipeg, MB (I-94, I-29, MB-75, MB-42) - 402 miles
 
Does anyone know how long it typically takes to install a Supercharger? On December 9th, I will be traveling from Fargo to Minneapolis for Tesla service. What are my odds of having this done by then? As of today, it has been in "construction" status for 22 days on Supercharge.org.
 
Does anyone know how long it typically takes to install a Supercharger? On December 9th, I will be traveling from Fargo to Minneapolis for Tesla service. What are my odds of having this done by then? As of today, it has been in "construction" status for 22 days on Supercharge.org.
I wouldn't count on it being done. We have several in NE that started about same time. My best guess would be optimistically Christmas. I am not an expert, but watching a few of these now thru construction phase makes me believe that they have some work yet, not to mention working what now appears to be more winter-like weather. I hope for your sake its sooner, but I'd plan alternative options for charging, as probably your accustomed to doing already. good luck!