You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I am not seeing any building permits at that location, but on the other hand, the building permit system seems kind of messed up because I don't see ANY permits for that location (and clearly there would be the occasional permit for the Sheetz itself).
The map display just places the pin at the center of the town (same as you get if you just type in Colfax, NC into Google Maps). It doesn't represent a specific address.
E-plan. tesla is installing an electric vehicle charging station within existing parking lot of the gas station
Status - Issued
Permit - # 202020026
Subtype - New construction
Building type - Other
Permit Fee - $12,636.00 paid to Greensboro, NC
Looks like the above permit I found was just an e-Plan. Here's what looks like the building permit, now issued
Permit #: 202102821
Status: issued
Tesla motors vehicle charging station installation at sheetz store. installation of 750kva transformer to 1200a service (2 - 600a) disconnects. will need electrical inspections for: underground conduit inspection grounding inspection release of service inspection and final. building inspection will be for the concrete slabs for the equipment