You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
While I know it doesn't help, the pictures that are already posted pretty much look exactly how it's currently setting except there's no fencing anymore
I dropped by yesterday to have a look. There is a little bit of surface work required on the car park asphalt to finish some bays and install the 'bumpers' as well as cover the power trench. Cabinets still have the covers on. Since they left those parking bumps and the install hardware behind, that might suggest they are waiting for someone else to do the surface work.
Yeah. I wanted to confirm there was no transformer yet, so since I was driving by I took this picture of the pre cast pad (on Dec. 20th photo by @dtswan sitting on the asphalt) placed where we’ll see the transformer eventually (in distance on @Sparks photo posted this morning).
Photo not loading, I’ll try again tomorrow.
I’ll be by again mid month unless things are powered up before then.
I am not sure if close is the right term as we are still missing the Utility transformer and that could happen soon or take many months it is all over the place on timing.
I am not sure if close is the right term as we are still missing the Utility transformer and that could happen soon or take many months it is all over the place on timing.