Great update - as always, thanks! A little hard to tell, but it looks like they still need to run the primaries up the pole to make the connection there. And, I assume the overhead lines are not live yet if they are still stringing cable to poles towards the new Starbucks (I could be wrong on that - they could light up the run to the supercharger pole, and then add the lines to Starbucks later.
The contractor will typically repave and/or sealcoat the supercharging spaces and then re-stripe - doesn't look like that has been done yet. Striping these will be slightly different than in the past presumably as these are V4-capable bases so will be closer to space-center than im the past (let the complaints begin! 😒).
Light posts not being up has not delayed site opening in the past at a few locations - I think that task is one of the few that is sub'd out if I'm not mistaken.