Supercharger - Davidson, SK

This site may earn commission on affiliate links.
Nothing new, except maybe a new lightpole that’s just been installed. Pic by @InternetDude on Twitter
2A82056A-BCD9-4E38-8F33-DE70DA782F5D.jpeg
 
  • Informative
Reactions: outdoors
All Saskatchewan locations may up and running at the same time:D
Very unlikely to the minute, as activating is via a physical visit, at least with V2, so given distances it’d be over a couple days or three as the tech drives through SC to SC doing their work.

Unless there’s been a change in this process for V3, and they get activated remotely?
 
I'd be surprised if they can't just turn things on during the check-out visit and then it's a remote command to enable charging.
Possible, but not the experience out here.
The Superchargers here were left on when the tech left from the initialization visit.
Those that have to pay for Supercharging have reported free charging for a period of time, which possibly seemed to coincide with the chargers showing up on the MCU and in the App being when they start getting charged.
Now if these are a bunch of V3's they could change the way they do it, but that seems unlikely.
 
The tech tests each site in person and if everything looks good (90% of the time), they are then functioning superchargers. It then takes anywhere from a day to a month for the website and Nav to get updated. So yes, it will probably take one guy a couple days to go through and activate all the SK sites and they are probably waiting for all of them to be completed so they don't have to send him out more than once. It's also possible that they want the same guy to activate the entire TCH or at least the western half of it on one trip so it could take some time before they feel enough of them are ready to justify the trip.