Supercharger - Toronto, ON - Don Mills Road

This site may earn commission on affiliate links.
I think it's actually four cabinets. Look at the way the red arrows are pointing on the covers of each of the cabinets... the two on the left have arrows pointing to the left, and the two on the right have arrows pointing to the right. We'll see if they do three or four stalls per cabinet, but my money is on sixteen stalls.
Description says: 16 stalls | 250kW. Don't doubt your vibe, Big Earl! L|;p)
 
Stopped by the other day, and just wanted to add the photo I took of the area. Can confirm it's on the 2nd level of the parkade very near the Flo charging stations.

Don Mills Supercharger 1.jpg
 
Dropped by this afternoon to see what progress is being made. No sign of activity today. The 16 bases for the stalls are in place.The wiring conduits to supply the 4 cabinets to be placed in the unused open core of the parkade and the conduits to supply the 8 stalls on the 2nd level and 8 on the 3rd are also in place. Lots of time to make the Q4 2022 timetable but it can't come too soon!
 

Attachments

  • 20220822_141646.jpg
    20220822_141646.jpg
    317.9 KB · Views: 152
  • 20220822_141816.jpg
    20220822_141816.jpg
    312.3 KB · Views: 134
  • 20220822_141838.jpg
    20220822_141838.jpg
    413.2 KB · Views: 151
Didn't have time to go by today after charging at the fully occupied Fairview Mall SC.

What causes such a long delay between completed installation of SC hardware and having Toronto Hydro (or Hydro One) powering it up? Does the ESA require their final inspection before allowing Telsa to even place the order for mains hook up, whyich then takes 5-10 weeks? The install team did jocularly say "lucky if its live by the end of the year".