Scheduled to open this quarter, the Doylestown Supercharger will be built at the Wawa under construction at 425 S Main St, near the Rte. 202 bypass.
Oddly, though the Supercharger is supposed to open this quarter, it also says the Wawa will be open this winter. I'm not sure who to trust at this point, but I assume it will go online about the same time as Flemington. Will add on Supercharge Info
Oddly, though the Supercharger is supposed to open this quarter, it also says the Wawa will be open this winter. I'm not sure who to trust at this point, but I assume it will go online about the same time as Flemington. Will add on Supercharge Info
Last edited: