Tesla was on the agenda for the May 2, 2019 Planning Board meeting in Elizabeth NJ:

RESOLUTIONS:
P-01-19, 651 Kapkowski Road, Tesla, Inc;

P-05-19, 651 Kapkowski Road, SAI Group, Inc.A proposal to install 10 double sided (20) charging poles, available for all vehicles, with 10 supercharger cabinets, and ten auto-transformers, three led light posts, 1-480v switchgear, 1 metering cabinet, and 1 utility transformer in the parking area of The Mills at Jersey Gardens Mall, (lot 1380F, block 1), in an RC zone. (preliminary & final site plan, with waivers of site plan requirements)

I assume the "available for all vehicles" is a misunderstanding - the rest of the description and having Tesla behind the proposal makes it clear these are superchargers. The item was also among the resolutions for the next Planning Board meeting but the minutes of the meetings are not available online. The Jersey Gardens Mall is a Simon property - they host a few other superchargers as well.

651 Kapkowski Road, Elizabeth NJ 07201
 
We typically stay in the hotels across from that Mall when we fly into New Jersey (It was convenient to the Turnpike so we could visit several relatives). If they ever put superchargers in North Dakota too, maybe we can drive there instead.
 
Saw these pics in a facebook post in the Tesla Motors club of NY/NJ. Construction is well under way. 16 stalls!!

@Chuq
@BlueShift
 

Attachments

  • A914611A-4497-4DE9-A721-A71E21E227C1.jpeg
    A914611A-4497-4DE9-A721-A71E21E227C1.jpeg
    150.2 KB · Views: 274
  • 3DE31296-B12E-452D-96FD-C7D049D3A63D.jpeg
    3DE31296-B12E-452D-96FD-C7D049D3A63D.jpeg
    666.9 KB · Views: 163
  • 38AD0D67-6467-4DB4-8788-B1B889C452D3.jpeg
    38AD0D67-6467-4DB4-8788-B1B889C452D3.jpeg
    468.5 KB · Views: 134
Is this 16 or is it 20 stalls? V2 or V3?

I count 16 stalls (could be more but can't be sure from those photos), and those are definitely V3 cabinets!

Even though the original planning permit says 20 stalls, it also described V2 cabinet/stall arrangement which has clearly changed going by the pics, so maybe because of power constraints they went with 16 x V3 instead of 20 x V2.
 
I count 16 stalls (could be more but can't be sure from those photos), and those are definitely V3 cabinets!

Even though the original planning permit says 20 stalls, it also described V2 cabinet/stall arrangement which has clearly changed going by the pics, so maybe because of power constraints they went with 16 x V3 instead of 20 x V2.

Good to know. I didn't think there would be any other V3's here for a while except Maple Shade.
 
I was just there and saw PSE&G there and two construction workers. In addition to these 16 stalls, there are 10 Electrify America CCS chargers (and one Chademo). No cones are blocking them, but I wasn't about to try plugging my car in to test if they were working. I made a Google Photos album of the pictures I took since the uploading here isn't working.

https://photos.app.goo.gl/6EMCcbbQHEUmR91P6
 
  • Like
Reactions: mociaf9 and MarcoRP
Any updates?

I'm traveling this corridor weekly this summer. Have seen it on the map, status temporarily closed....

Seems VERY convenient location, as it looks easy on/off and large compared to others arpund.