Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Fernie, BC

This site may earn commission on affiliate links.


Tesla files permit for new Supercharger in Fernie [British Columbia]​

According to site plans submitted with the permit application, the site will feature just six V3 Supercharger stalls, capable of providing charging speeds of up to 250kW. As part of the requirements to receive funding from Natural Resources Canada (NRC) for the project, the site will also feature two FLO DC fast chargers.
 


Tesla files permit for new Supercharger in Fernie [British Columbia]​

According to site plans submitted with the permit application, the site will feature just six V3 Supercharger stalls, capable of providing charging speeds of up to 250kW. As part of the requirements to receive funding from Natural Resources Canada (NRC) for the project, the site will also feature two FLO DC fast chargers.
It’s unfortunate they keep making installations that are almost useless for anyone who wants to tow or put something on the rear of the vehicle. Surely they could come up with a better configuration.
 
  • Like
Reactions: bruce4000
The Invermere crew, when asked if there are more they will be working on, said that they will be working on a second Supercharger in Revelstoke next.
(Posted on Tesla Owners Alberta facebook group by @Quote Me , the recent poster of the Invermere photos).
A second Revy Supercharger is going in? I hadn't heard about that but very much needed! There was a wait both times I was recently through there during week days. Too many people charging to 100% at every stop.
 
A second Revy Supercharger is going in? I hadn't heard about that but very much needed! There was a wait both times I was recently through there during week days. Too many people charging to 100% at every stop.
Yes, I'm hoping they get that supercharger done in Revelstoke before the snow flies. It was such a choke point this summer. I heard it directly from a contractor on site in Invermere who told me that is where he is going next.
 
  • Like
Reactions: johnny_snow
Fernie Supercharger conduit on site! Ground should break soon, plus 20 stalls are fenced off. Hopefully it will be online within a month

97B16E24-0328-41C9-A724-DD0273EC58BD.jpeg
6307A6C5-A424-4440-85B5-36A40C567A99.jpeg
 

Attachments

  • 036C37E9-5ECC-4896-9127-A573CD43B66C.jpeg
    036C37E9-5ECC-4896-9127-A573CD43B66C.jpeg
    772.1 KB · Views: 168
  • F4D3F7CA-29DB-49EA-A8DF-F07C6844911B.jpeg
    F4D3F7CA-29DB-49EA-A8DF-F07C6844911B.jpeg
    1.3 MB · Views: 154
  • B29FA98E-E88D-44B6-AAB4-C5AB3AB6E76D.jpeg
    B29FA98E-E88D-44B6-AAB4-C5AB3AB6E76D.jpeg
    570.7 KB · Views: 173
Supercharger is coming along nicely, however it does look a little wet, and conduit is floating in the pond. Supercharger cabinets are on site, but not yet unwrapped. Hopefully they get this done before the holes freeze over!
 

Attachments

  • 1A105815-D2E9-4E19-AC4F-868A2857AA83.jpeg
    1A105815-D2E9-4E19-AC4F-868A2857AA83.jpeg
    652.8 KB · Views: 164
  • 18C41FD2-557D-4A93-803E-79BF23014320.jpeg
    18C41FD2-557D-4A93-803E-79BF23014320.jpeg
    362.3 KB · Views: 159
  • FC167593-4A9F-49EA-9233-9E189B6EE899.jpeg
    FC167593-4A9F-49EA-9233-9E189B6EE899.jpeg
    489.9 KB · Views: 164
  • 111C0DCC-FA6D-4154-9549-7CB24B3EDBB6.jpeg
    111C0DCC-FA6D-4154-9549-7CB24B3EDBB6.jpeg
    550.7 KB · Views: 165
  • 2A94F9E3-AAE4-4BA0-9F3A-B0333024EAB1.jpeg
    2A94F9E3-AAE4-4BA0-9F3A-B0333024EAB1.jpeg
    453.8 KB · Views: 155
  • FD1258FF-AD0A-47AF-806B-A8666A2BA901.jpeg
    FD1258FF-AD0A-47AF-806B-A8666A2BA901.jpeg
    654.1 KB · Views: 162