tontod
Member
Upthread a link to the permit (to build 40 Supercharger stalls at 45500 Fremont Blvd) was posted, so you can check for yourself, see Accela Citizen Access .
Here is the project description as stated in the permit: “Supercharger Substation and Supercharging Parking, Phase II. Provide anchorage for 40 superchargers and 40 dispensing stations. Provide electrical power to the equipment.”
Thanks - took a look, no change from #163, inspections still need to be conducted. Hopefully soon.