You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I was there this morning when a couple of large PG&E trucks came rolling in. They had the new SC area blocked off with cones. Appears to be plenty of activity there today.
I used one of the new Gilroy supercharger stalls today. Two others were also charging.
The bays to the right are the 90 KW and the others are the 120. I was charging somewhere around 375 mph if I remember correctly.
Since there are four cabinets, how do they feed 10 Supercharger bays?
Typically there is one cabinet charging 2 bays.
To me, four cabinets X 2 = eight bays....
Am I missing something?
I notice there is additional electrical equipment (and bollards) on the far right side of the picture #8...
...perhaps there is additional equipment there?
There are two additional cabinets in a different part of the lot, not far away, which feed the four rightmost stalls. These were the original two stalls, plus the first expansion of two more stalls.
View attachment 39783View attachment 39784