You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
With 8 stalls used, only charging at a max of 72 kWh. I’ve been coming back to charge since Friday and I’ve never had any success of charging more than 72 kWh. It also take less than 5 mins and it usually drops to 50kw.
With 8 stalls used, only charging at a max of 72 kWh. I’ve been coming back to charge since Friday and I’ve never had any success of charging more than 72 kWh. It also take less than 5 mins and it usually drops to 50kw.
With 8 stalls used, only charging at a max of 72 kWh. I’ve been coming back to charge since Friday and I’ve never had any success of charging more than 72 kWh. It also take less than 5 mins and it usually drops to 50kw.
For any in the West end of the valley they are supposed to build a Target in Calabasas and put a Supercharging station there. I don't know where they would have the space for a Target but it is on the drawing board. I hope that happens soon!
Sherman Oaks has been on the map since 2017! They are running a bit behind. The empty lot at the Westfield Fashion Square (behind the Ross) is the perfect location.
I stopped by the Granada Hills Supercharging station today and I was surprised how busy it was. How do regular people find out about these things being built?? Took an aerial photo with the drone while I was waiting.