You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Any idea when this GB SC will be operational based on length of time between permit and open on other sites? ...or is there too much variability to take an educated guess?
The opening date for Meijer Superstore was announced today - May 16. It seems like the SC should be ready about ready at the same time - about 86 days after the permit date.Does anyone have an update on the elusive SC in Green Bay, WI? I keep getting the "it's coming but plans change so you can't hold us to it" reply from Tesla. I've been getting this now for over one year. Any information would be great. Sheboygan was a nice first step but I need one in GB itself for my purposes. Thanks.
“We've always known that the 29/41/43 corridor would be a great place for anyone traveling through the state or preparing to go to Door County - to get charged,” said Village Administrator Paul Evert.
<snip>
If everything goes smoothly the Tesla Supercharger station could be available for use in early summer.
The median time from "Permit" status at supercharge.info to operational is 86 days, but as you say it is highly variable.
Permit Construction
Count 146 280
Average 118 41
Min 4 0
Max 568 297
Median 98 33
Deviation 90 33
This spot has a 14-50 separate from the RV spaces that you can charge at on the way to the UP as well.Until the GB supercharger is ready, does anybody have any suggestions for getting through Michigan UP? PlugShare shows chargers in Houghton and Marquette, but I'm not sure how reliable these are....
I'm travelling from Minneapolis to Mackinaw Island.
Thanks!
Later today I'll call the Miejer and ask the store manager or someone with similar charge as I've been curious about this for some time too.
This spot has a 14-50 separate from the RV spaces that you can charge at on the way to the UP as well.
500 Bay Rd
Peshtigo, WI 54157
United States
Until the GB supercharger is ready, does anybody have any suggestions for getting through Michigan UP? PlugShare shows chargers in Houghton and Marquette, but I'm not sure how reliable these are....
I'm travelling from Minneapolis to Mackinaw Island.
Thanks!
Taking a trip to Peninsula State Park over the 4th of July. Anyone on the ground in GreenBay have an update on this SC? Thanks in advance!
Stopped at the Supercharger site in Green Bay 6/25. Address is 2015 Shawano Ave, Green Bay WI, 54303. Construction has started! Looks to be a 8 stall site