No such thing as 120kW chargers now. They’re 135kW, with the max going to one of the paired cars car being 120kW.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
CenterPoint energy in Houston take forever to set the transformers...hopefully they will break the mold.View attachment 297673 dropped by today. It is a Sunday, but still the workers were putting up the chargers. Chatted with them. They said they'll be done in 2 WEEKS!
View attachment 297673 dropped by today. It is a Sunday, but still the workers were putting up the chargers. Chatted with them. They said they'll be done in 2 WEEKS!
Already asked that question and was met with a quick response say the contract they sign with Tesla doesn't allow them to share other projects.If you stop by and talk to them again, ask if they will be moving to another Tesla job when they finish and if so, where?
And they’re not even supposed to be talking about this one.Already asked that question and was met with a quick response say the contract they sign with Tesla doesn't allow them to share other projects.
Already asked that question and was met with a quick response say the contract they sign with Tesla doesn't allow them to share other projects.
Wire arrived today which they can pull from pedestals to supercharger cabinets to Switchgear, then it's a waiting game until CenterPoint installs utility pole and transformer. GC isn't allowed to run ug conduits within 20 ft of the utility pole location, so that will follow along with secondary feeders. I wouldn't expect it to be live before memorial day weekend.They're moving right along!
This orientation does allow the vehicle to be parked closer to the pedestals, which helpsUnusual orientation of the charging pedestals.
6 of 8 charging pedestals set
All concrete poured (parking & x-former pad)
Switchgear set on equipment pad
Not sure I follow your concerns, but CenterPoint is requiring GC to incase the primary feeder conduits (down pole into transformer) in something like 3' x 3' of concrete. That's hella overkill, but being that close to the storm water line warrants it...I guess.Anyone else a little freaked out about all that electricity right next to the storm drain given Houston’s policy of using streets for flood control?