Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Iowa City, IA

This site may earn commission on affiliate links.
The meter is installed but doesn't have power yet. If I recall correctly, the energy company turns on the meter and then Tesla's activation team can power up the chargers. If so, timeline is dependent on the power company.

PXL_20220519_233324028.jpg

PXL_20220519_232956903.jpg
 
  • Like
Reactions: mociaf9
This station is still not ready. Interestingly the cords do command the opening of the charge port. This would point to Tesla needing to complete this station on the backend side (computers).
I stopped by the Walcott SC when it was still inactive but had just gotten the finishing touches and that was the behavior. They opened them like 2 days later.

Is there someone we can call in the event the stalls are iced?
 
I tried to plug my car in tonight. Still not active as of Monday 6/6.
I was just there this afternoon as well, ditto, nothing.

Also while I was there, one of my door handles failed on my S and I almost had to have it towed... The door handle was stuck constantly "opening" the door which meant I couldn't keep it in drive and it was the passenger rear door so I couldn't sit in the driver seat and keep it closed lol
Finally got it to stop after a few good whacks on the handle... 😂