my picture doesn't show it but the are 8 panels with pairs back to back. So 8 panels total.So each panel can charge two cars? otherwise only 4 cars, too less.
They look asymmetric: the middle 6 are symmetric, but the one on the right doesn't seem to have a mate, and there's one on the left that's partially obscured by some construction stuff that is the other one. It looks like maybe 5 could charge on one side, and 3 on the other?my picture doesn't show it but the are 8 panels with pairs back to back. So 8 panels total.
Like this: ====
And you could pull in either side.
They are asymmetric, but that's how you get 4 cars on each side. Remember that the charging port is always on the back left of the vehicle. Look at the picture in this post on the previous page:They look asymmetric: the middle 6 are symmetric, but the one on the right doesn't seem to have a mate, and there's one on the left that's partially obscured by some construction stuff that is the other one. It looks like maybe 5 could charge on one side, and 3 on the other?
There are lots of 200+ v 30+ amps chargers, check on plugshare.Driving from LA to the Seattle area this weekend and this location would be so perfect if it were done in time but not holding my breath. Think I'll have to swing up to Lynnwood at one point to fill up or find some L2 solution somewhere.
Don’t pass outMaybe I should start holding my breath...
Fencing is gone. Lines are painted. This thing is going to be open any day now.
Easy now. We have seen superchargers go months waiting on the transformer. Definitely agree with geoc on this one.Fencing is gone. Lines are painted. This thing is going to be open any day now.