Tesla is actively working on getting a second Supercharger in Joplin at the Kum & Go at 5002 S Main Street, and it's scheduled to open in the first quarter. I don't know whether or not this site will remain open for much longer -- thread on the way
Moderator note: The first 40 or so posts in this thread are a merge of posts from two different threads.
Darn, I was really hoping this would be a second location closer to the I-44/I-49N intersection. This is pretty close to the old one, and I don't think they need the second side for capacity reasons so it's probably just a move.
That said, the old location isn't getting less creepy, so I'll take it.
Last edited by a moderator: