NickFie
Member
There’s plenty of power near the mall. Honking big substation near the theater complex. GE Space Systems was based near the mall decades ago. Suspect some of their work demanded a lot of juice. Now Martin Marietta I think.Do remember that a large set of supercharges is quite a load on a local substation. And the expanded mall I am sure is already stressing the feeders to that area. PECO may need to plan how to feed this thing. (20 stalls = 10 superchargers at 130KW each (once at DC) so expect 140KW at AC, thats a 1.4MW feed, which is a healthy load on a substation. All depends on how much capacity is left on the feeders to that area.