Tesla will be building a supercharger at the RT-128 Northbound service plaza in Lexington, MA as indicated in the pin added to the Tesla supercharger coming soon map earlier this year. Site planning is underway, with the possibility of construction this spring. Not yet sure where within the service plaza this will be located.
 

Tdreamer

Plaid Supercharger
Supporting Member
Sep 10, 2017
1,378
2,712
Bedford, Massachusetts
I've been unable to find anything yet, but I'll keep looking. My assumption is that someone would need to pull a permit with the town at least, even though discussions/approval is probably with Mass-DOT. Same for the Newton location....

I met and had a great conversation with the guys that make all this stuff happen. I didn't press for any info that wasn't available to share. They don't get nearly enough credit for their negotiation skills and persistence in getting these sites done.
 

EdA

Model S P-2540
Mar 24, 2011
2,317
265
Cape Cod
Thanks for digging, these are all great locations.
I wish the area surrounding Philadelphia had the density we will have here in MA.
 

mociaf9

Active Member
Oct 18, 2018
2,927
6,069
CA
My assumption is that someone would need to pull a permit with the town at least, even though discussions/approval is probably with Mass-DOT. Same for the Newton location....
If the sites are within the service plazas themselves, then maybe not. Those areas are generally considered as entirely within the Right-of-Way for the road and therefore often the local jurisdiction isn't involved at all. How the roads authority handles plan checks for code compliance and permitting will vary from one to another. They might be handled by a state level office, outsourced to the appropriate county office that issues permits for construction in unincorporated areas, etc.
 
  • Informative
Reactions: EdA and Tdreamer

Tdreamer

Plaid Supercharger
Supporting Member
Sep 10, 2017
1,378
2,712
Bedford, Massachusetts
There are various building permits associated with the McDonalds in this service plaza in the Lexington permit database, which is why I was assuming Tesla might need to pull a permit with the town. But you could be right if it's not within a structure.
 
  • Informative
Reactions: mociaf9

Tdreamer

Plaid Supercharger
Supporting Member
Sep 10, 2017
1,378
2,712
Bedford, Massachusetts
Are you Superman? You’re everywhere.
Nope - went for a drive to CT Saturday and made the rounds checking for any sign of life at these locations... Was hoping for at least one site progressing to construction given Littleton just wrapped up but no. Perhaps the crew went up to Williston, VT which just started construction. Who knows....
 
  • Like
Reactions: kayak1
Dec 4, 2019
66
96
Westminster, MA
I notice that at the south end of the plaza there is an isolated loop of roadway around a small demolished facility of some kind. Its not currently being used. This is the only place I can see that seems a likely candidate site for an SC.
 

North75

Member
Mar 28, 2017
613
774
MA
I'm assuming they will go in one of the two rows next to the grass medians. I'm also assuming they will get ICE'd regularly. (or they won't actually get built here) We'll see.
Newton is basically the same layout, but without any extra space like Lexington.
 

Farmer

Member
May 21, 2016
74
109
Boston, MA suburb
I just drove by the Lexington rest area and glanced in. There is a skid steer loader and a mini excavator in that area now. More importantly, there were a bunch of those pre-formed concrete bases Tesla uses now for Supercharger stands sitting in piles off to the side of that mini lot. I was by it before I could take a picture. I'm headed back down 128 tonight. Maybe I'll cross over for photos.
 

Tdreamer

Plaid Supercharger
Supporting Member
Sep 10, 2017
1,378
2,712
Bedford, Massachusetts
I just drove by the Lexington rest area and glanced in. There is a skid steer loader and a mini excavator in that area now. More importantly, there were a bunch of those pre-formed concrete bases Tesla uses now for Supercharger stands sitting in piles off to the side of that mini lot. I was by it before I could take a picture. I'm headed back down 128 tonight. Maybe I'll cross over for photos.
Perhaps the explanation why Woburn is on hold - they've moved on to Lexington for a bit! Great find!
 

dhkaufman

Member
May 1, 2020
26
49
Lexington, MA
Great heads up @Farmer, I stopped by (on my way back from Lynnfield). The parking bay (13 spaces) closest to Rt 128 has been fenced off, signs for Heidrea construction. There's a cut in the pavement leading up to the median, which has been partially stripped of sod. The isolated loop @Cryptoengineer identified is being used as a staging area, there are 8 pedestal bases (?) some conduit and a couple of Kubotas (with Heidrea markings) over there, but no actual diggings.

PXL_20210613_155733558.jpg

PXL_20210613_155752869.jpg

PXL_20210613_155919777.jpg

PXL_20210613_155937061.jpg
 

Products we're discussing on TMC...

About Us

Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.

Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


SUPPORT TMC
Top