I was hoping the Tesla folks doing the repair work on the NE Minneapolis location would move on to activation of Bloomington but that doesn't seem to be the case. Bummed...At this rate, we'll be lucky if it's on by the time the snow flies.
Confirmed, there is a meter in the opposite spot as it was originally. It is a physically different meter than the one that was in the first one. Also note that it is in the “480/277” spot, so I am optimistic that it is the one for the superchargers.I had some time, so I drove up there today. Interestingly, while there's still only one meter, is the opposite one from the most recent picture on this thread. Not sure why they would do that.
St. Louis Park comes to mind... but don't quote me on that.Went by today. Both meters are energized. ChargePoints are on. But, the Tesla pedestals are still not lit yet.
I can’t believe it has been over 2 months now with construction complete and the transformer installed. That has to be some kind of record for the longest time between build complete and powered up. Anyone know of a charger that sat unpowered for a longer time period?
I leave Wednesday morning, do they will probably go live that day.Went by today. Both meters are energized. ChargePoints are on. But, the Tesla pedestals are still not lit yet.
I can’t believe it has been over 2 months now with construction complete and the transformer installed. That has to be some kind of record for the longest time between build complete and powered up. Anyone know of a charger that sat unpowered for a longer time period?
I'm going to drive over today on the off chance it is being commissioned. I'll aim to be there between 2 and 3. If anyone has a situation report, please let me know.I leave Wednesday morning, do they will probably go live that day.
Still no power. ChargePoint L2s are free for two hours, so I am grabbing some electrons and travel food for tomorrow's drive.I'm going to drive over today on the off chance it is being commissioned. I'll aim to be there between 2 and 3. If anyone has a situation report, please let me know.
Nope. Still no power.Monticello turned on today. Maybe this one did late too.
Hopefully they don't wait for 420 days just to make Elon giggle.Hopefully, with Monticello and North Branch both “ON” now (in the last 2 days), Maple Grove will finally get commissioned ASAP.
MG is now at 69 days since construction complete and transformer installed. (69? Funny, this must mean it will go live Thursday!)
Other comparable times (approximate):
SLP: 78 days (Note that this occurred during the initial ramp up of the pandemic, plus some site damage)
Bloomington: 25 days
North Branch: 12 days
Monticello: 12 days