Substantial progress.

1. The trench out to the Highway 7 for the input power distribution conduit is now covered with gravel and topped with dirt, and that area is open for parking. Will need some paving to complete.

2. Highway 7 input power location is now fenced off itself and isolated from the main supercharger area.

3. Stall concrete pads now in place.

4. Large (40 cm in diameter, 2.5 meters tall, half in ground) cylindrical mounts for what could be lighting, or solar canopy. Many, not just a few, and there is plenty of existing mall lighting in place around the charging area, so I do wonder if lighting is the reason. Hoping solar canopy, but it's a wild guess.


20171128_231805.jpg



5. Port-o-potty has been moved. Makes it much easier to get a nice combination picture of the "action" without needing to zoom in on the throne.

20171128_231831.jpg
 
  • Helpful
  • Like
Reactions: hnwa and MarcoRP
Dropped by today at lunch - progress: some cables have been installed. The location is tough, no grass or soil just concrete and asphalt. Lots of concrete cutting - they were still cutting concrete while I was on site.

Spoke with some of the crew, great bunch but tight lipped as to opening timing. Looks like there will be no Solar canopy, just lights. Can expect the stalls to up soon, some maybe installed for the weekend. Hydro hookup Tuesday, however its going to be tough to say the least to energize without the Tesla switch boxes etc. They are installing barriers to protect the Tesla hardware as per other locations.