It's one of the older ones out there. There were 81 SCs in the whole world when EC went online.It is totally the worst. The last time I was there in May, 1 out of service, 1 stall occupied, and my car wouldn't charge on the other 6. I had to do a hard reset to charge, and still wouldn't charge over 50kw. No problems with Mauston, Oakdale, or Madison (at East Towne Mall). The other time I used it I had slower charge speeds 3 years ago as well.
I think it screams, "It snows so experienced contractor had Tesla-branded bags handy."Maybe it's me, but the fact that they put the fancy Tesla-branded bags on the pedestals just screams, "This will not be working any time soon."
I see the the switch box cabinets are finally on site. That was a long time coming. Unfortunately the photo doesn’t show the location of the meter housing. It would typically be installed on one of those switch box cabinets. See Tomah thread for reference.Sure looks like all the required equipment is installed, but probably still waiting on meter installation / utility?
I walked around the white cabinets after I took the pictures and don't recall seeing the meter housing on the cabinets.I see the the switch box cabinets are finally on site. That was a long time coming. Unfortunately the photo doesn’t show the location of the meter housing. It would typically be installed on one of those switch box cabinets. See Tomah thread for reference.
As of noon last Saturday (11/6) there were covers over the pedestals.Anyone been by Menomonie lately, any news?
Is it actually live and charging? We’ve had this happen before where someone saw a car plugged in, but it still wasn’t powered.
No, it takes a few days or longer after a supercharger location is live.Does it show up on the navigation map?