Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Minnetonka, MN

This site may earn commission on affiliate links.
Nice. Should reduce some diversions. (Owatonna, MN would help with that spacing along I-35 too.)

Within range of two US Numbered Highways and on the Auxiliary Interstate connecting I-94 and I-35

Yes it would? Ironically there is Destination Chargers at Holiday Inn near Clinton Falls (Cabela's and Outlet Mall area). There is plenty of room in the Cabela's parking lot which very high visibility for Tesla. Also Downtown Owatonna has a Destination Charger installed by the Local Utility.
 
construction has completed at St Louis park.
Supercharger - St. Louis Park, MN

Hopefully that means construction will start here soon.
We've linked 2 permits to this location--1) a permit for the general construction of the EVCS which hasn't been approved yet; 2) a permit for the supercharger wiring which was approved in February. So, it's not at all clear that they will be able to proceed to construction any time soon.
 
Digging has started. Even though there is no Tesla equipment here yet, do we want to move this to under construction @Chuq @BlueShift
 

Attachments

  • 6FB23E70-7FA0-43EA-827F-5134C022AAD9.jpeg
    6FB23E70-7FA0-43EA-827F-5134C022AAD9.jpeg
    1 MB · Views: 136
  • E2B49417-E535-4946-98C1-8BB1EC2D1DB3.jpeg
    E2B49417-E535-4946-98C1-8BB1EC2D1DB3.jpeg
    1.3 MB · Views: 134
Moderator note: This post (plus two following posts) were merged from another thread that was started on the same topic. This merging took place about a year after the posts were originally made.

@BlueShift Think we need to add a new blue peg...
Ticket No: 201840467
NORMAL
Relocated by: 202102938
Original Call Date: 07/02/20 07:52 am
Work to Begin Date: 07/07/20 08:00 am
Type: CALL
Expiration Date: 07/21/20 08:00 am

TICKET ACTIONS
Hover over buttons for information on usage.


EXCAVATOR INFORMATION

Company Name: PREMIER BUILDERS GC
Type: CONTRACTOR
Address: 2731 JASON RD
ASHLAND,KY 41102
Caller: TOM EARLY
Phone: 307-256-8920
Contact: TOM EARLY
Phone: 307-256-8920
Company Phone: 606-585-0808
Fax Phone:
Email Address: [email protected]

Excavation Information

Type of Work: INSTALL ELECTRIC SECONDARY UNDERGROUND
Work Being Done For: TESLA
Explosives: N
Tunnel/Bore: Y
R.O.W.: Y
Duration: 2 WEEKS

Location Information

State: MN
County: HENNEPIN
Place: MINNETONKA
Address:
Street: RIDGEDALE DR
Intersecting Street: ESSEX RD
Area Marked: N
Job Number: minnetonka
Location of Work: FROM ESSEX RD GO EAST APPROX 600 FT ON RIDGEDALE DR, FROM THERE MARK 150 FT OFF THE SOUTH SIDE OF RIDGEDALE DR GOING EAST FOR 800 FT
Remarks:
Map Twp: 117N
Rng: 22W
Sect-Qtr: 3
Map Coord:
NW Lat: 44.9707324
Lon: -93.4518511
SE Lat: 44.9675174
Lon: -93.4438841
 
Last edited by a moderator:
Well this didn’t take long. Stopped by on the way home today. 4 of the 8 stalls are up. Talked briefly to what seemed to be the foreman of the installing crew. Very nice guy. They are from Kentucky. They were the same guys that installed the ND Superchargers. Said they will be completed by Friday before moving to the other Minneapolis location. Obviously the rest will depend on Tesla and 964AC8BF-8822-4857-A40E-36A71E931B2E.jpeg 8A5E1103-8EE3-46A9-9B31-B60A58F05068.jpegXcel Energy to energize.