Supercharger - Oneonta, NY

Discussion in 'Mid-Atlantic' started by mociaf9, Nov 13, 2018.

  1. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    1,273
    Location:
    CA
    GPD doesn't do the actual construction. The jobs are bid out and area GCs and subcontractors are hired for the construction phase. GPD does the site design and engineering as well as project management up through the permitting phase. Pretty much everything up to the point where dirt starts to move.
     
  2. Metalmanstan

    Metalmanstan Member

    Joined:
    Apr 28, 2019
    Messages:
    7
    Location:
    Oneonta
    Went back today and I have a 99.9% chance that it's a super charger. Vertical cut lines for around 60ft in the concrete and now conduit is in the ground. Give it a week or two and maybe we'll see if Telsa equipment arrives!
     
    • Informative x 2
  3. Metalmanstan

    Metalmanstan Member

    Joined:
    Apr 28, 2019
    Messages:
    7
    Location:
    Oneonta
    Whoops. Forgot to upload the photo IMG_20190713_202601_1.jpg
     
    • Informative x 2
    • Like x 1
  4. Potatoee

    Potatoee Member

    Joined:
    Jul 21, 2018
    Messages:
    23
    Location:
    Reading
    Would be good to get "start of construction" confirmed so we could update the status at supercharger.info. Oneonta's availability will be key for people doing long range trip planning. @Metalmanstan : I agree with your conclusion that this is the actual SC start of construction. Outside of Boston there are several SCs under construction. It appears that once the "digging starts," it's perhaps 3 months until completion (just a spitball estimate).
     
  5. minderbinder

    minderbinder Member

    Joined:
    Oct 19, 2015
    Messages:
    109
    Location:
    Concord, MA
    8F0D8E51-4DA1-4B60-B5C7-AEF353B1E5FD.jpeg CA1FEDEB-0325-495A-8B59-44D937CEC4A6.jpeg E0C0FD4B-8566-4861-A9C9-A47EAB0FDAEA.jpeg

    This is totally the start of supercharger construction. I stopped by today - there’s a pavement cut perpendicular to the parking spaces, and a big load of conduit. Let the supercharge.info folks know!
     
    • Like x 3
    • Informative x 2
  6. gtr987

    gtr987 Member

    Joined:
    May 29, 2016
    Messages:
    26
    Location:
    Exeter, RI USA
    holy cow thanks for the excellent recon minderbinder!! been so looking forward to this install.
     
  7. billh13850

    billh13850 Member

    Joined:
    Jan 1, 2019
    Messages:
    219
    Location:
    Vestal NY
    Good to see progress, watching this one closely. Ithaca, NY just went online as well!
     
  8. gtr987

    gtr987 Member

    Joined:
    May 29, 2016
    Messages:
    26
    Location:
    Exeter, RI USA
    Conduit in place for all 8 pedestals.

    Installers are the same folks whom have installed several more superchargers including Binghamton, Ithaca, Victory, Waterloo, etc...

    Super nice folks and more than happy to inform us.

    Didnt venture a guess on operational date due to the many variables, but to my non-expert eyes they're making good progress. Turns out this trenching location is on top of a natgas right-of-way so has not been trivial.

    One of the installers mentioned another non-Tesla set of EV charging stations will be installed along the same side of the parking further back.

    No pads yet for xformer and power electronics.

    IMG_0454.jpeg
     
    • Informative x 3
    • Like x 3
  9. gtr987

    gtr987 Member

    Joined:
    May 29, 2016
    Messages:
    26
    Location:
    Exeter, RI USA
    Concrete poured for pedestals. Conduit in place and pads poured for xformer and power electronics.

    image1.jpeg


    image2.jpeg
     
    • Informative x 4
    • Like x 3
  10. geowhjr

    geowhjr Member

    Joined:
    May 30, 2019
    Messages:
    19
    Location:
    Waterford, NY
    will be out this fall, how's it going out there?
     
  11. gh1953-X18

    gh1953-X18 New Member

    Joined:
    Sep 9, 2019
    Messages:
    1
    Location:
    Guthriesville
    Some progress at Oneonta. Looking better but work still to be done.

    95E34B13-760B-4C6A-A3CB-BEDA377D846F.jpeg
     
    • Like x 6
  12. minderbinder

    minderbinder Member

    Joined:
    Oct 19, 2015
    Messages:
    109
    Location:
    Concord, MA
    Interesting - thanks for the update! Looks like all the utility gear is there (transformer (I think), meter, and switchgear), but none of the Tesla parts. There's been speculation about a pedestal shortage in other threads - perhaps that's what's holding things up here. In any case it should be up in short order once those things show up.
     

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC