    Pasadena is about to get its second very large charging plaza, courtesy of the City and Tesla working together again. This is in a currently underutilized City owned lot by the power plant on the Southwest corner of Glenarm St. and Arroyo Parkway. For those not familiar with the area, this is the corner where the 110 North Freeway ends in Pasadena at Glenarm St:

    [​IMG]
    The current lot entry point that will have to be used is off Glenarm St. You have to be driving East on Glenarm to turn into the lot. When you exit the lot you will also be going East on Glenarm. Given the freeway to the East and the raised median on Glenarm for the train, I don't think this layout is going to change.

    [​IMG]

    There are several businesses on the nearby corner of Marengo and Glenarm, but with the freeway terminating right there this is a pretty dangerous street to be crossing. If you venture up Arroyo Parkway a few blocks there is everything you could want. Just West down Glenarm there is a liquor store with attached takeout food service, and then North up Fair Oaks is a BBQ place. All within 5 minute walking distance.

    Full 5 page agenda report can be found here:
    https://www.cityofpasadena.net/commissions/wp-content/uploads/sites/31/2020-09-22-Municipal-Services-Committee-Agenda.pdf?v=1600430926918

    And also below in the thumbnails:

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]

    Those familiar with my documenting of the construction of the other Pasadena Supercharger will know that this page will soon be filled with daily photos :)

    RT
     

    Attached Files:

    • Like x 6
    • Informative x 3
    • Love x 3
  2. KG M3

    KG M3 Member

    Joined:
    Jul 24, 2018
    Messages:
    154
    Location:
    Pasadena, CA
    Great find! Looking forward to those pictures.
     
    • Like x 1
  3. Limited

    Limited Member

    Joined:
    Sep 4, 2016
    Messages:
    161
    Location:
    Los Angeles
    Solid find @RubberToe! Glad to see that there will not be any parking fees at this site. Also, I don't see anything indicating that these will be urban stations. Says 20 superchargers - I'm hoping this will be a V3 site given its proximity to the 110 freeway but I imagine it is anyone's guess until permits are revealed. Also, there is mention of "concrete island removal" but I imagine this is in relation to an existing island inside the parking lot as opposed to the island on Glenarm Street.
     
  4. RubberToe

    RubberToe Supporting the greater good

    Joined:
    Jun 28, 2012
    Messages:
    2,893
    Location:
    El Lay
    My contact in PWP said there will be much more information available in the meeting on Tuesday. Not sure if they live stream the meetings, but from the below it looks like at a minimum they make the video and audio available at some point:

    Municipal Services Committee - City of Pasadena Commissions

    When I went to the meeting where they discussed the Marengo Charging Plaza they had PowerPoint slides showing the site layout. I suspect that the same will be true here too. Keeping my fingers crossed for the first deployment of the large Tesla Obelisk on the site...

    Note this meeting is the same day as Tesla's battery day presentation. I might have to break out the "good stuff" to celebrate the occasion. :D

    RT
     
    • Like x 2
    • Informative x 1
  5. RubberToe

    RubberToe Supporting the greater good

    Joined:
    Jun 28, 2012
    Messages:
    2,893
    Location:
    El Lay
    Something just like this right on the corner of the parking lot. 10,000 cars a day driving past. Are you listening to me Elon Musk???

    obelisk 3.jpg
     
    • Like x 3
  6. smartypnz

    smartypnz Supporting Member

    Joined:
    Jan 23, 2013
    Messages:
    1,811
    Location:
    Monterey Peninsula
    Cute.... but rule of thumb - if you're selling all you can make - we don't need no stinkin' advertising.
     
    • Like x 1
    • Love x 1
  7. gaswalla

    gaswalla Model S,3,X.. CT with Austin delivery

    Joined:
    Sep 23, 2012
    Messages:
    3,110
    Location:
    San Diego
    The original supercharger tower was better... went along with the S/3/X motif
     
  8. gaswalla

    gaswalla Model S,3,X.. CT with Austin delivery

    Joined:
    Sep 23, 2012
    Messages:
    3,110
    Location:
    San Diego
    [​IMG]
     
    • Like x 1
  9. RubberToe

    RubberToe Supporting the greater good

    Joined:
    Jun 28, 2012
    Messages:
    2,893
    Location:
    El Lay
    Initial scouting report shows that there are currently a total of 112 parking spaces in that entire lot that are accessible. The SW corner is fenced off as there is access to cross the light rail tracks to enter the power plant. Not clear whether that is even done anymore, but the same fenced off area also accesses areas of the plant on the East side of the tracks. I'm assuming that fence remains in place. One of the pictures below shows that the lot currently is for PWP construction parking only.

    It will be interesting to see what portion of the lot is used for the EV chargers. With so much space available, and no other required use, I would hope that the currently small parking spaces are made bigger than even normal parking spaces. Unless there is some reason to pack cars like sardines with the ensuing door dings and whatever else that close quarters bring, make the spaces bigger. Everyone is buying Cybertruck sized vehicles these days anyway, so there is that to consider.

    The site has very good drainage. For some reason the lights were on in the middle of the day. The picture of the NE corner where the obelisk will go shows a parking space with two manhole covers that have "electric" stamped on them. Could be this is where the main power comes in.

    IMG_20200918_133642.jpg IMG_20200918_133802.jpg IMG_20200918_133820.jpg IMG_20200918_133921.jpg IMG_20200918_133451.jpg IMG_20200918_133455.jpg

    P.S. About once a year that 76 gas station caddy corner from the Supercharger has someone exiting the North 110 freeway a bit too fast resulting in the corner sign being lost, and often gas pumps too. The Supercharger location on the freeway entrance side precludes this kind of silliness.
     
    • Like x 3
    • Informative x 2
  10. smilepak

    smilepak Active Member

    Joined:
    May 11, 2015
    Messages:
    1,672
    Location:
    Eastvale, CA
    Awesome!
     
    • Like x 1
  11. TerranApart

    TerranApart Member

    Joined:
    Apr 19, 2018
    Messages:
    116
    Location:
    USA
    Confirmed from the Pasadena presentation that Tesla chargers will be v3!

    pasadena.png
     
    • Informative x 5
    • Love x 3
    • Like x 2
  12. RubberToe

    RubberToe Supporting the greater good

    Joined:
    Jun 28, 2012
    Messages:
    2,893
    Location:
    El Lay
    Photo grabs from the council meeting followed by notes:

    arroyo lot 1.jpg

    Here are the site layout renderings:

    arroyo lot 3-2.jpg arroyo lot 2-1.jpg arroyo lot 3-1.jpg arroyo lot 2-2.jpg

    Per the SCIP funding received, project must be completed by June 2, 2021.
    There will be 6 spaces that will be larger than the others to allow for Cybertruck charging, not clear on the Powerpoint which those are.
    Much discussion of whether Westbound traffic on Glenarm will be able to either U-Turn at Raymond or whether the median on Glenarm can be modified to allow lot entry. The council asked then planners to work with DOT on that and report back.
    The City DCFCs will be 50kW initially, but the electrical infrastructure will support 175kW chargers later. A statement was made that the 175kW chargers were not yet readily available.
    One of the council members (Andy Wilson) stated that he will be getting a Tesla!
    At the Marengo charging plaza, Tesla's chargers attract much more users than the city DCFCs.
    Marengo cumulative power sales revenue to the city is about $1m per year, this lot should be about the same.
    There is no minimum power usage requirement that Tesla needs to commit to. The presenter literally laughed out loud when asked about this because of the high level of usage at the Marengo plaza. The questioner was just making sure that the city wasn't giving away public parking space access with no guaranteed return.
    The committee voted 4-0 to move the agreement to the entire city council.

    RT
     
    • Informative x 4
    • Like x 3
  13. MarcoRP

    MarcoRP @MontrealTesla

    Joined:
    Sep 6, 2017
    Messages:
    4,639
    Location:
    Montréal
    #13 MarcoRP, Sep 23, 2020
    Last edited: Sep 23, 2020
    • Like x 1
    • Funny x 1
  14. PStewart

    PStewart Member

    Joined:
    Aug 29, 2018
    Messages:
    34
    Location:
    Columbia, South Carolina
    • Helpful x 1
  15. BM3B

    BM3B “beaver”

    Joined:
    Mar 8, 2019
    Messages:
    613
    Location:
    Los Angeles, CA
    Great find @RubberToe thank you! Wow, I am super excited for a V3 SCer in Pasadena with Cybertruck parking! I wonder how much wider and deeper the stalls with be for CT, they may leave enough space to charge with a trailer attached.
    Any guesses on go-live date? Thanksgiving just like our 1st last year on Marengo?

    And will this be one of the first (if not the first) CT-capable charger? I imagine Texas will be first, I can do some digging.
     
  16. Wipeout

    Wipeout New Member

    Joined:
    Oct 16, 2019
    Messages:
    4
    Location:
    Pasadena
    Great find here. Can’t wait for it to open.
     
  17. RubberToe

    RubberToe Supporting the greater good

    Joined:
    Jun 28, 2012
    Messages:
    2,893
    Location:
    El Lay
    No later than June 2nd of 2021 to meet the required completion date for the SCIP grant. Given how slow things move I would think that's a pretty good opening day estimate. Hoping for much sooner obviously.

    RT
     
  18. Mrbrock

    Mrbrock Member

    Joined:
    Mar 26, 2020
    Messages:
    120
    Location:
    Napa, CA
    Couple things, am I just missing the 20th supercharger stall? There are 6 cybertruck plus 4 regular adjacent then below that is a line of 9. Where is the last stall? Maybe down below the EV Depot line as there are only 11 L2 visible in that section but 20 are mentioned. Also, are we sure these are V3 and not urban? If so can we change thread title to reflect the V3 notation on the image? I doubt they’d designate Urban stalls for Cybertruck.
     
  19. MarcoRP

    MarcoRP @MontrealTesla

    Joined:
    Sep 6, 2017
    Messages:
    4,639
    Location:
    Montréal
    I’m surprised you’re the first person to notice that, but the answer lies in one of Rubbertoe’s photos: a shared stall between; DCFC and Supercharger CAE5548D-5A15-482D-A277-20DB8C550556.png
     
    • Informative x 1
  20. Red Tess

    Red Tess Member

    Joined:
    Mar 26, 2017
    Messages:
    13
    Location:
    North Central, WA
    It does look awesome. But, please moderators, let's be factual. The headline "reserved for Cybertruck" and the text and plan showing "designed for Cybertruck" are very different.
     
    • Like x 2

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC