Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Pasadena, CA - East Glenarm Street (LIVE 21 Oct 2021, 20 V3, 7 DCFC, 20 L2)

This site may earn commission on affiliate links.
Well, I saw it with my own two eyes. Construction has started. I don't know who the Moderator is, but could someone alert them to change the thread title?

Just in time too as a local gas station just put up the dreaded number 5...

PXL_20210622_225700722.MP.jpgPXL_20210622_225901356.MP.jpgPXL_20210622_231204532.MP.jpgPXL_20210622_225817951.MP.jpgPXL_20210622_225741082.MP.jpgPXL_20210622_225729293.MP.jpg
 
Holy Moly Rocky! Well, it looks like the crew has decided to make up for the long nap they took from September until yesterday. They might even make the SCIP required completion date of June 2nd if they work with the Caltech Astrophysics department and can run time backwards for a few weeks.

A large new hole was dug and some equally large pre-cast concrete structures were placed in the hole. If it looks like progress, smells like progress, and tastes like progress, I'm going to have to admit that it could very well be actual progress. I would note that on the Marengo Supercharger build when they put these large electrical vaults in the hole, they monkeyed around for several weeks with the dirt restraint system and tweaking the vault locations and interconnects. So lets all hold off on the Snoopy happy dance for a bit...

Third picture shows that they chewed up the East end of that concrete parking island end to get at the drainage, so that area will get repurposed as part of the new build. The original posts also indicate that upgraded lighting will be installed, so maybe most/all of the prior poles/fixtures will be replaced.

PXL_20210625_125141848.MP.jpgPXL_20210625_125200761.MP.jpgPXL_20210625_125236241.MP.jpgPXL_20210625_125306424.MP.jpg