Supercharger - Plano, Texas

This site may earn commission on affiliate links.

Attachments

  • 20180204_180042.jpg
    20180204_180042.jpg
    210.1 KB · Views: 158
  • 20180204_175854.jpg
    20180204_175854.jpg
    203.6 KB · Views: 134
  • 20180204_180037.jpg
    20180204_180037.jpg
    305.2 KB · Views: 139
A beautiful day to inspect the Plano Supercharger. The new larger transformer is in place.

FE468E98-6B9C-482D-86BE-A33F2EC7D074.jpeg


The conduit from the ground floor to the top deck is done. Inspection plates are open and no wires have been run yet.

A214C9E1-619F-4891-BE25-9480C8C54C82.jpeg


There is no meter yet.

2AD42C97-0212-47C5-AF84-ACBB3766900D.jpeg


Square D box will probably house a breaker & distribution panel.

748E2B61-E0E1-4835-8A5C-1A23F019B1D1.jpeg


Work is progressing on wire routing hardware and Tesla cabinets. There is no new hardware to report for the individual parking stations.

4327090C-8496-475D-BD41-AE463E16AE0D.jpeg


Have a great day!
 
No!!! not Urban!!!

Really doesn't matter to me, my car usually maxes out around 105 and drops to 80-90 pretty quick anyway. I only care in this instance because I'll be up there on the 24th for a local performing arts down the road.
 
looks like it's almost done!

Don’t get too eager. I bet another 3-4 weeks to go. Half the pedestals are missing, some cabling is missing/incomplete, no signs of a structure or fence around the cabinets, they need curbs to protect the pedestals, striping, and (of course) they need a meter. Patience! They’re only working 5 days a week (I checked).
 