Supercharger Progress

Discussion in 'Wiki' started by Wiki, Sep 2, 2013.

Thread Status:
The first post in this thread is a WikiPost, and can be edited by anyone with the appropriate permissions.
  1. Wiki

    Wiki Member

    Joined:
    Mar 21, 2016
    Messages:
    26
    #1 Wiki, Sep 2, 2013
    Last edited by emupilot: Dec 6, 2016 at 2:43 PM
    This is a wiki page about prospective Supercharger locations and their progress. Once open they can be moved to the archive table.

    State Location Hwy (Exit) Chargers Status Expected Open Date Notes Thread Link
    AL Birmingham I-20 8 Sources say coming soon as of 9/1/2016; Permit BLD2016-02367 submitted for review 9/14; Tesla says approaching construction phase 9/26; construction well underway 10/28; awaiting transformer & hookup 11/5; operational 11/16 11/16/2016
    Uptown, 2221 Richard Arrington Jr Blvd N Thread
    AR Little Rock I-20 8 Tesla says in final stage of constrution as of 12/4/2016
    Unknown Thread
    CA Fish Camp CA-41 8 Found with construction complete 11/21/2016, awaiting transformer & hookup
    Tenaya Lodge, 1122 California Highway 41 Thread
    CA Fremont #2 I-880 20 Under construction 10/22/2015
    47400 Kato Road Thread
    CA Groveland CA-120 7 Tuolumne County board of supervisors voted 3-0 to pursue a lease agreement with Tesla 3/1/2016; building permit application B2016-00814 submitted 7/20; Planning review approved 7/25 with Building review still pending; equipment staged on site 9/22; under construction 9/24
    11880 Ponderosa Lane Thread
    CA Placerville US-50 6 Tesla in negotiations for a site as of 10/13/2015; lease contract signed as of 11/3; plans abandoned as of 7/8/2016

    CA Santa Ana I-5 12 Permit application submitted 2/16/2016; construction began 8/5; awaiting transformer & hookup 10/4; transformer installed 11/19; operational 12/5 12/5/2016
    Mainplace Mall, 2800 North Main Thread
    CA Santa Barbara US-101 12 Tesla says in permitting process for superchargers as of 8/4/2015
    Store / Service Center, 400 Hitchcock Way
    CA Gustine I-5 12 Permit BP2016-0990 applied for 5/12/2016; permit approved 8/5; permit issued 9/9, found under construction 10/4; awaiting transformer & hookup 10/17; transformer installed 11/2; meter installed 11/10; operational 11/15 11/15/2016
    Andersen's Split Pea Soup, 12411 CA Highway 33, Gustine Thread
    CA South Lake Tahoe US-50 6? Tesla in negotiations to nail down a site for over a year as of 10/13/2015
    Heavenly?
    CO Brush I-76 8 Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016, Tesla says proceeding with site 11/9
    Tomahawk Brush Travel Stop, 1156 CO-71? Thread
    CO Loveland I-25 8 Found in early stage of construction 10/30/2016
    Embassy Suites, 4705 Clydesdale Parkway Thread
    CO Thornton I-25 8 Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016
    unknown Thread
    FL Naples US-41 8
    Plans submitted for review 5/6/2016; variance recommended for approval by Planning Advisory Board 6/8; variance request withdrawn by Tesla 8/4, building permit #161757 under review; under construction 11/12
    NW corner of parking garage, 499 Bayfront Place
    Thread
    KY Kuttawa I-24/I-69
    8
    site reportedly selected as of 10/7/2016
    unknown hotel?
    Thread
    MD Aberdeen I-95 8 Agreement reached with Maryland DOT as of 8/4/2016
    Maryland House Travel Plaza on I-95 Thread
    MD Cumberland I-68 8 In discussions with Canal Place Development & Preservation Authority as of 10/21/2016
    Footer Dye Works Building, Canal Place Thread
    ME Portland

    Tesla opted against a downtown parking garage site as of 3/2/2015 - new site needed


    MN Alexandria I-94

    Tesla says coming in 2017 as of 10/10/2016

    Thread
    MN Clearwater I-94
    8
    Tesla says coming before end of 2016 as of 10/10/2016; Permit ELE1610-03417 issued 10/12
    Clearwater Travel Plaza, 950 Highway 24
    Thread
    MO Joplin I-44 8 In site negotiations as of 4/25/2016; discovered mostly complete with transformer installed 11/16; operational 11/30 11/30/2016
    Hotel Joplin, 3132 Hammons Blvd Thread
    MO Springfield I-44 8 Out for contractor bid 4/26, in permitting process 5/23; permit ELE2016-00991 issued 10/5, under construction; operational 11/16 11/16/2016
    3070 North Kentwood Thread
    MT Lima I-15
    Mentioned in city council meeting 12/14/2015; utility markings found 8/14/2016; construction in progress 9/14; awaiting transformer & hookup 11/30
    Jan's Cafe, 108 Bailey Street Thread
    NC Statesville I-77/I-40 8 Proposed design discussed with Technical Review Committee 10/19/2016
    1520 Cinema Drive
    Thread
    ND Fargo I-94 8 Tesla reportedly looking for site as of 6/30/2016

    Thread
    NE Gothenburg I-80 8 Tesla looking for site as of 7/6/2016; equipment staged at site 11/3; transformer installed with construction continuing 11/19; to be tested 11/30; operational 12/2 12/2/2016
    Nebraska Barn & Grill, 318 Platte River Road Thread
    NE Grand Island I-80 8 Reportedly under construction 11/2/2016; in early stage of construction 11/27
    Bosselman Travel Center, 3335 West Wood River Road Thread
    NE Kearney I-80 8 Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016
    unknown Thread
    NE Lincoln I-80 8 Tesla looking for site as of 7/6/2016; application AA16055 filed with Planning Commission 8/1; construction started 11/3; awaiting transformer & hookup 12/4
    Hy-Vee, 5020 North 27th Street
    Thread
    NE North Platte I-80 6 Tesla looking for site as of 5/20/2016
    unknown hotel? Thread
    NE Ogallala I-80 6 Tesla looking for site as of 5/20/2016; construction well underway 11/2; construction complete, transformer installed 12/1; operational 12/2 12/2/2016
    Holiday Inn Express, 501 Stagecoach Trail Thread
    NH Lincoln I-93
    6
    Discussed at Lincoln Planning Board meeting 9/14/2016, to be followed up at 9/28 meeting; reported under construction 11/15; operational 11/24 11/24/2016
    RiverWalk Resort, 22 South Mountain Drive
    Thread
    NM Las Cruces I-25/I-10

    In site negotiations as of 10/28/2016
    Hilton Garden Inn, 2550 South Don Roser Drive
    Thread
    NM Santa Fe I-25
    10
    In permitting as of 10/28/2016
    Fashion Outlets of Santa Fe, Cerritos Road at I-25
    Thread
    NV Las Vegas 2 I-15
    10
    Under construction 11/24/2016
    Town Square, 6509 S Las Vegas Blvd
    Thread
    NY Tarrytown I-87 12 Permit process started 5/18/2016; under construction 10/6; transformer installed while construction continues 10/29; meter installed 11/29; operational 12/2 12/2/2016
    Sheraton, 600 White Plains Road Thread
    OR Klamath Falls US-97 8
    Permits 483-16-003505-ELEC-01 and 483-16-003505-STR submitted for review 11/15/2016
    1401 Washburn Way
    Thread
    PA Moosics I-81 8
    Under construction 12/1/2016
    Shoppes at Montage, 1035 Shoppes Blvd
    Thread
    SC Columbia I-77
    8
    On "Coming Soon" map updated 12/18/2014; Tesla says to break ground mid-August 2016; operational 11/15 11/15/2016
    Hilton Garden Inn, 8910 Farrow Road
    Thread
    SC Myrtle Beach US-17
    5
    Permit application on 9/15/2016 agenda of Community Appearance Board; permit approved by Board with minor modifications 9/15
    Coastal Grand Mall, 2000 Coastal Grand Circle
    Thread
    TN Jackson I-40
    8
    Reported to be coming after Memphis as of 8/4/2016; contruction reportedly mostly done 11/6; transformer & meter installed 11/13, awaiting testing; operational 11/30 11/30/2016
    Casey Jones Village, 50-56 Casey Jones Lane
    Thread
    TN Memphis I-40
    8
    Encroachment variance applied for 7/25/2016; utility markings at site 9/12; equipment staged at site 10/4; under construction 10/6; awaiting transformer & hookup 10/28; transformer installed 11/8; operational 11/30 11/30/2016
    1203 Ridgeway Road
    Thread
    TX Arlington I-30
    10
    Agreement with Tesla approved by city council 6/7/2016; pavement markings at site 9/17
    Convention Center, 1200 Ballpark Way
    Thread
    TX Fort Stockton I-10
    8
    Sources say coming soon as of 11/22/2016; permit found 12/1
    Fairfield Inn & Suites, 2571 I-10 Service Read
    Thread
    TX Junction I-10
    8
    Construction complete 11/3/2016; transformer installed 11/22
    Chevron, 2415 North Main Street
    Thread
    TX Midland I-20

    Owner of truckstop says supercharger agreement in place as of 3/21/2016 map released 12/18/2014
    Flying J, 3302 Garden City Highway
    Thread
    TX Ozona I-10
    8
    Rumors say this will be a site as of 11/17/2016; confirmed under construction 11/22
    Best Western, 1307 Avenue A
    Thread
    TX Texarkana I-30
    8
    Permit application reportedly under review 9/21/2016; under construction 12/5
    Olive Garden, 3101 Mall Drive
    Thread
    TX Van Horn

    Sources say coming soon as of 11/20/2016; City confirms that permit has been applied for 12/2

    Thread
    TX Wichita Falls US-287

    Tesla has discussed sites with Planning Department as of 10/25/2016

    Thread
    VA Charlottesville

    Tesla says coming within the next year as of 3/16/2015
    Shops at Stonefield?
    WA Aberdeen US-101

    Superchargers to be part of upcoming Gateway Center development as of 9/6/2016; construction well underway 10/18; transformer installed while construction continues 11/5
    107 South F Street Thread
    WI Green Bay

    Tesla says site will be built by end of 2016
    unknown Thread
    WI Stevens Point

    Tesla says site will be built by end of 2016
    unknown Thread
    WI Wausau
    4
    Tesla says site will be selected soon as of 8/2/2016; Stettin Town Board set to approve 2-year temporary site 8/22; temporary site operational 11/24 11/24/2016
    S 22nd Avenue and Corporate Drive Thread
    WV Morgantown I-68

    Reportedly coming as of 10/26/2016; lease agreement signed 12/6
    Sheetz, 21 Asturias Lane Thread
    WY Wheatland I-25 8 Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016
    unknown Thread
    AB Calgary

    Tesla says service center w/supercharger will open Fall 2016


    AB Fort McLeod

    Found under construction 8/30/2016; transformer installed, construction continues 9/24; construction complete 10/1, awaiting power on/testing; testing ~11/23; operational 11/24 11/24/2016
    569 23 Street

    BC Merritt

    On Tesla's 2015 list? Under construction 9/30/2016
    Best Western Plus near Husky Travel Centre

    BC Vancouver

    On Tesla's 2015 list?


    ON Belleville

    Red dot on supercharger map used to be here, but plans apparently scrapped (as of 9/22/2014)


    ON Casselman

    after Toronto, Kingston, Cornwall, and Drummondville; seems that Tesla scraped that plan (no more dot either for 2015 and 2016)


    ON Oakville

    Under construction 10/4/2016
    225 Wyecroft Road
    Thread
    QC Lévis 20 8? In Tesla's book for 2015 (probably by the summer); Tesla says will be ready for construction ~8/8/2016
    TBD


    Following is an archive of the progress of sites which are now operational:
    AL Mobile I-10/I-65 8 On Coming Soon map released 12/18/2014; permit application submitted 1/26/2015; 1 permit condition still requiring resolution 2/24; under construction 3/20; transformer in place 4/6, power on 4/8; operational 4/16 4/16/2015 3201 Airport Blvd Thread
    AZ Page US-89 8 Tesla says under construction as of 9/2/2016; operational 9/10 9/10/2016
    Courtyard, 600 Clubhouse Drive Thread
    CA Bakersfield I-5 10 Permit applications for electrical and enclosure submitted 3/2/2016; found under construction 8/14; operational 9/29 9/29/2016
    Shell, 29541 Stockdale Highway Thread
    CA Buena Park I-5/CA-91 8 Under construction 5/16/2016; transformer installed 10/15; operational 10/19 10/19/2016
    Service Center, 6692 Auto Center Drive Thread
    CA Burbank I-5 6 Under construction 8/19/2015; operational 12/15 12/15/2015 Service Center, 811 South San Fernando Blvd. Thread
    CA Buttonwillow I-5 10 Sources say coming as of 10/12/2015; Kern County permit #K201508122 applied for 10/21; permits issued 12/15; under construction 12/28; awating transformer and hookup 1/22/2016; transformer installed 1/24; connected to grid 1/27; operational 1/29 1/29/2016 Starbucks / Subway, 20673 Tracy Avenue Thread
    CA Crescent City US-101 8 Lease agreement on city council agenda for 4/6/2015; application 118-070-25 / projects UP15-10 & AR15-11 approved by planning commission 12/10; construction began 7/25/2016; construction complete with transformer in place 9/5; operational 9/8 9/8/2016
    Front & K Streets Thread
    CA Dublin I-580/I-680 10 In permitting with the City of Dublin 5/29/2015; under construction 7/18; supercharger can't open until mid-Sept because of 30-day notice required to neighbors of scheduled power outage to connect transformer to the grid; transformer installed 10/5; operational 10/16 10/16/2015 Service Center, 6701 Amador Plaza Road Thread
    CA Eureka US-101 8 Permit application submitted ~10/30; coastal development permit under review as of 11/9; building permit B15-0852 submitted for review 11/23; permit B15-0852 approved 1/25/2016; construction underway 6/30/2016; transformer installed 7/24; power to be connected 8/9; operational 8/16 8/16/2016
    Bayshore Mall, 3300 Broadway Thread
    CA Folsom #2 US-50 10 Under construction 6/24/2016; awaiting transformer & hookup 7/12; operational 8/11 8/11/2016
    Parking Garage, 370 Palladio Parkway Thread
    CA Fountain Valley I-405 8 Discovered under construction 7/7/2015; transformer installed 8/10; operational 8/25; temporarily closed 8/26; operational 8/28 8/28/2015 17940 Newhope Street Thread
    CA Fresno CA-99 10 Tesla is "Coming Soon" to the Marketplace at El Paseo - footprint indicates that it is likely the supercharger; construction started ~11/20/2015; awaiting transformer / hookup 1/5/2016; transformer installed 1/9; operational 1/29 1/29/2016 The Marketplace at El Paseo (~6611 North Riverside Ave) Thread
    CA Inyokern US-395 4 Kern County permit K2014-06075 approved 12/19/2014; permit issued 12/30; under construction 1/7/2015; operational 3/20/2015 3/20/2015 1353 Brown Road Thread
    CA Mammoth Lakes US-395 8 Approved by town council 9/16/2015; under construction 12/10; operational 1/20/2016 1/20/2016 Park-and-Ride Lot, 106 Old Mammoth Road Thread
    CA Mojave CA-14 6 Permit recommended for conditional approval by Kern County Planning Department 12/18/2014; pavement markings seen 2/4/2015; to be tested 3/27; operational 3/27 3/27/2015 near Anthony's Grill, 16940 California 14 Thread
    CA Mountain View US-101 12 Construction mostly complete 5/25/2015; transformer installed 5/26; failed inspection 5/29; passed inspection 6/3; operational 6/9 6/9/2015 Computer History Museum, 1401 North Shoreline Blvd Thread
    CA Napa
    8 Napa County permit P14-00339 in process as of 12/21/2014; part of larger development to be completed by end of 2015; Lake Charles / West Wendover contractor won bid for construction as of 1/18/2015; construction in general area began late June; supercharger under construction 9/17; awaiting paving and transformer 11/30; operational 7/9 7/9/2016
    Devlin Road & Airport Blvd Thread
    CA San Diego I-5/I-805 12 Tesla reported that "permits have been pulled" 10/23/2014; construction site found 12/15/2014 in early stages; construction complete with transformer installed 5/11; energized 5/22 but access is blocked; accessible for charging 6/8 6/8/2015 10105 Pacific Heights Blvd. Thread
    CA San Mateo US-101 8 Sources say a supercharger is coming here as of 2/18/2015; equipment on site 5/18; testing 6/25; operational 7/9 7/9/2015 1200 Park Place Thread
    CA Seaside CA-1 6 Store / service center / superchargers under construction as of 6/11/2015; testing 8/11; operational 8/13 8/13/2015 Store / Service Center, 1901 Del Monte Blvd Thread
    CA Temecula I-15 10
    Sources say coming soon as of 11/2/2015; under construction 3/21/2016; awaiting transformer and hookup 4/12; operational 5/10 5/10/2016
    40780 Ring Road
    Thread
    CA Truckee II CA-267 8 Found under construction 10/7; Commercial Remodel permit #TI 2015-00000785; operational 10/23/2015 10/23/2015 Fifty Fifty Brewery, 11197 Brockway Blvd Thread
    CA Ukiah US-101 8 Approved by city council 8/7/2015; Construction started ~12/8; operational 1/13/2016 1/13/2016
    Thread
    CO Colorado Springs I-25 8 Sources say coming soon as of 10/12/2015; suspected supercharger plans sumitted for review 10/14; under construction 12/7; energized and testing 12/23; operational 12/29 12/29/2015 215 North Cascade Ave Thread
    CO Trinidad I-25 6 On "Coming Soon" map updated 12/18/2014; permit application being processed 2/17/2015; permit process to be restarted as of 5/15; construction reportedly underway 7/13; operational 7/29 7/28/2015 9700 Santa Fe Trail Thread
    FL Marathon US-1 4 Tesla reports this site is in permitting 7/26/2014; lease agreement signed 11/22; under construction 3/22/2015; operational 5/2 5/2/2015 Florida Keys / Marathon Airport Thread
    FL Plantation I-75 8 site negotiations to take place in October 2014; permit B14-04072 filed 12/19; 11 environmental conditions enumerated 12/27; plans resubmitted 2/3/2015; 14 conditions remain to be resolved 3/19; 11 conditions remain 3/20; 7 conditions remain 3/24; 2 conditions remain 3/26; passed engineering review 4/7; construction began 8/12; waiting for transformer 10/2; transformer installed 11/30; power connected and inspections in progress 12/17; operational 12/19 12/19/2015 near Chili's, 813 South University Drive Thread
    FL Riviera Beach
    8 Found under construction 2/9/2015; operational 3/20 3/20/2015 at Service Center, 4651 Dyer Blvd Thread
    FL Tallahassee I-10 5 Sources say coming soon as of 7/8/2015; construction recently underway as of 8/29; awaiting transformer & meter 9/12; meter installed 9/19 9/23/2015 1400 Village Square Blvd Thread
    GA Augusta I-20
    Sources say coming soon as of 2/27/2016; Tesla says approaching construction phase as of 3/25; building permit issued 5/3; transformer installed 6/5; operational 6/11 6/11/2016
    Sheraton, 1069 Stevens Creek Road
    Thread
    GA Kingsland I-95 6 Lease agreement approved 9/14/2015; under construction 10/31; to be tested 11/17; operational 11/17 11/17/2015 Kingsland Welcome Center, 1190 East Boone Avenue Thread
    IA Coralville I-80 8
    Upcoming supercharger mentioned in Board of Adjustment meeting 3/21/2016; Tesla says approaching construction 7/8; construction began 7/16; awaiting transformer & hookup 8/2; transformer installed 8/13, awaiting testing; operational 9/29 9/29/2016
    Hy-Vee, 2008 8th Avenue
    Thread
    IA Council Bluffs I-29/I-80 8 Under construction 3/3/2015, near completion; operational 3/10/2015 3/10/2015 3815 Metro Drive Thread
    IA Davenport I-80 8
    permit issued 7/25/2016; found under construction 8/30; transformer installed but no meter 9/13; connecting to the grid 10/11; operational 10/20 10/20/2016
    Hy-Vee, 4070 East 53rd Street
    Thread
    IA West Des Moines I-80 8
    In contract negotiations as of 5/6/2016; construction begun 7/22; awaiting transformer & hookup 8/8, transformer installed 9/30; site energized and awaiting testing 10/6; operational 10/20 10/20/2016
    Hy-Vee, 1725 Jordan Creek Parkway
    Thread
    ID Boise I-84 8 Permit issued 5/22/2015; construction started 6/25; construction apparently complete with transformer in place 7/26; operational 8/5 8/5/2015 Oxfod Suites Hotel, 1426 South Entertainment Ave Thread
    ID Coeur d'Alene I-90 6 Original site (Springhill Suites) had to be scrapped for zoning reasons; looking for new site as of 9/16/2014; permit approved for new site 1/7/2015; pavement markings / survey markers found at site 2/2; construction underway 2/13; waiting for transformer 2/20; transformer in place 2/25; electrical hookup and inspection completed 2/27; operational 3/4 3/4/2015 TM coming soon page 3502 North Fruitland Lane Thread
    ID Idaho Falls I-15
    City council approved cost-sharing plan 12/17/2015; permitting expected complete by end of April 2016; pavement markings 4/25, operational 6/9 6/9/2016
    MacKenzie River Pizza, 1490 Milligan Road
    Thread
    ID Pocatello I-15/I-86
    Sources say coming soon as of 2/1/2016; under construction 4/22; awaiting transformer and hookup 5/6; operational 5/24 5/24/2016
    Clarion Inn, 1399 Bench Road
    Thread
    ID Twin Falls I-84 8 Tesla says "We are actively working on a site in the Twin Falls area" as of 8/12/2015; construction began 10/5; repaving and restriping 10/26-27, then hookup and testing; operational 10/28 10/28/2015 Twin Falls Tourist Center, 2015 Nielsen Point Place Thread
    IL Champaign I-74/I-57 8 Found in late stage of construction 2/28/2016; transformer and power feed in place 3/12; operational 3/23
    3/23/2016
    Meijer, 2401 North Prospect Thread
    IL Effingham I-70 6 Source says coming soon as of November 2014; reported that site selected and permitting process starting 11/18; marking utility locations on site 2/25; construction in early stages 3/4; construction nearly complete 3/23
    Jack Flash, 1200 North Keller Drive Thread
    IL Mount Vernon I-57/I-64 8
    in planning stage 7/16/2016; under construction 9/28; operational 10/27 10/27/2016
    Holiday Inn, 222 Potomac Blvd
    Thread
    IL North Aurora I-88 8
    operational 10/5/2016 10/5/2016
    151 Hansen Blvd
    Thread
    IL Peru I-80 8 City council passed parking lot variance 2/8/2016; under construction 5/28; transformer installed 6/13; operational 6/22 6/22/2016
    HyVee, 1651 Midtown Road Thread
    IN Terre Haute I-70 8 Under construction 3/3/2016; operational 3/30 3/30/2016
    Meijer, 5600 E New Margaret Drive Thread
    KY Bowling Green I-65
    4
    Tesla says site selected as of 10/28/2015; permit application in process 5/17/2016, under construction 6/1; transformer installed 6/12; operational 6/24 6/24/2016
    Meijer, 1676 Westpark Drive
    Thread
    KY Louisville I-264/I-64 8 On "Coming Soon" map updated 12/18/2014; Tesla says site selected and construction to begin soon as of 10/28/2015; permit EL965556 issued 11/13; construction started ~11/20; energized and testing but with construction unfinished 12/22; operational 12/30 12/30/2015 2120 Gardiner Lane Thread
    LA Alexandria I-49
    8
    Supercharger reported coming to new Holiday Inn as of 4/18/2015; under construction 5/9; awaiting transformer & hookup 5/24; operational 6/7 6/7/2016
    Holiday Inn, 701 4th Street
    Thread
    LA Monroe I-20
    8
    site selected as of 4/30/2015; construction mostly complete 7/23; pole-mounted transformers installed 8/14, scheduled for testing/power on; operational 9/15 9/15/2016
    Marriott Hotel, 4915 Pecanland Drive
    Thread
    LA Shreveport I-49/I-20
    8
    Reported coming soon as of 4/18/2015; agreement with site in place 4/20; under construction 4/21; transformer installed and nearing completion 4/29; operational 5/12 5/12/2016
    Mall St. Vincent
    Thread
    LA Slidell I-10 8 On "Coming Soon" map updated 12/18/2014; Tesla says will not be built in summer 2015 as of 4/26/2015; waiting for other construction at site 7/8; permitting reportedly completed, construction started as of 1/17/2016; transformer installed but construction continuing 1/27; energized and awaiting testing 2/2; operational 2/6 2/6/2016 Fremaux Town Center, 1808 Shortcut Highway Thread
    MA Dedham I-95 8 Tesla service center w/superchargers approved by Dedham Board of Selectmen 1/8/2015; under construction 6/22; being connected to grid 7/29 8/8/2015 840 Providence Highway Thread
    MA Lee I-90 8
    on minutes of 2/22/2016 Planning Board meeting, continued until public hearing at 3/14 meeting; approved by Conservation Commission 4/6; construction began 6/27; awaiting transformer & hookup 8/5; operational 8/19 8/19/2016
    Big Y, 10 Pleasant Street

    MD Laurel I-95 8 Permit application submitted as of 12/18/2015; permit issued and utility markings at site 4/29; equipment staged on site and construction beginning 5/3; transformer installed 7/11, awaiting grid connection & meter installation; connected to grid and meter installed 7/22, awaiting testing; operational 9/23 9/23/2016
    Towne Center at Laurel, 14700 Baltimore Avenue Thread
    ME Augusta I-95 8 source says coming soon as of 12/30/2014; #19587 on October 2015 permit report as issued; construction well underway as of 11/17; operational 12/3 12/3/2015 Marketplace at Augusta, 13 Stephen King Drive near Red Robin Thread
    ME Brewer US-1A
    8
    Agreement with Ruby Tuesday as of 7/3/2016; area fenced off 7/10, construction began 7/12; awaiting transformer & hookup 8/2; transformer installed 8/24; operational 9/1 9/1/2016
    Ruby Tuesday, 5 Walton Drive
    Thread
    MI Ann Arbor I-94 8 Possible building permit applied for 4/7/2015; permit ready to issue 4/29; under construction 6/2; construction complete and waiting for transformer 6/29; transformer installed 8/4; meter installed 8/16; operational 8/20 8/20/2015 Meijer, 3145 Ann Arbor Saline Road Thread
    MI Bay City

    In permitting process as of late March 2016; plans approved by Planning Commission 7/5; pavement markings 8/9; awaiting transformer & hookup 8/28; transformer installed 9/1; operational 9/16; irregularly non-operational or operating on lower power 10/7; fully operational 11/8TD] 9/16/2016
    Meijer, 2980 Wilder Road

    MI Cadillac
    8 Permit issued 7/13/2015; construction fence up 9/8; construction appears complete with transformer installed but no meter 10/4; reported operational 10/29; temporarily offline 12/9; operational 12/23 12/23/2016
    Meijer, 3605 East 34th Road Thread
    MI Grand Rapids

    Permit issued 3/23/2015; construction started 5/21; will be ready for testing the week of 6/22-26; operational 6/24 6/24/2015 Meijer, 5531 28th Street SE Thread
    MI Port Huron I-94/I-69
    8
    Permit issued 5/16/2016; Under construction 5/18; transformer & meter installed 7/22; operational 8/18 8/18/2016
    Double Tree, 800 Harker Street
    Thread
    MN Baxter
    8 Source reports coming soon as of 7/29/2015; found under construction 9/26; operational 10/21 10/21/2015 Arrowwood Lodge, 6967 Lake Forest Road Thread
    MN Duluth I-35 4 Tesla reports under construction as of 6/26/2015 and due to open in early July; permit BELEC1506-007; operational 7/17 7/17/2015 210-212 West 1st Street, 4th level Thread
    MN Hinckley I-35
    Under construction 9/24/2015; operational 10/21 10/21/2015 Tobie's, 404 Fire Monument Road Thread
    MN Oakdale I-94

    Site discussed with Economic Development Commission 2/3/2016; Tesla says nearing construction phase as of 5/30; under construction 6/24; awaiting transformer & hookup 7/22; transformer installed 8/8; operational 8/16 8/16/2016
    Hy-Vee, 7180 10th Street North

    MO Columbia I-70 6 Source reports permit approved 11/7/2014; site reportedly blocked 12/9; in permitting as of 7/13/2015, permit processing (#15-2398) should be done by 7/17; permit issued 7/31; under construction 8/13; operational 9/10 9/10/2015 Holiday Inn East, 910 Port Way Thread
    MO Miner I-55/I-57 8 Under construction as of 5/13/2016, operational 6/1 6/1/2016
    Ruby Tuesday, 2612 East Malone Avenue Thread
    MO Rolla I-44 8 Site identified in news article 10/28/2015; permit EL2016-00210 ready 1/4/2016; construction began 7/18; transformer installed but construction continues 8/8; initial construction out of specifications and ripped out 9/2; operational 9/27 9/27/2016
    Bandana's Bar-B-Q, 1705 Martin Spring Drive Thread
    MO St. Charles I-70 5 on Coming Soon map released 12/18/2014; permit number CU-2014-32 approved by city council 1/6/2015; utility markings noticed 2/11; equipment staged at site 2/20; construction began 2/23; transformer installed 4/1; to be tested 4/3; operational 4/14 4/14/2015 Bogey Hills Shopping Plaza / 2021 Zumbehl Road Thread
    MS Meridian I-20/I-59 8 Permitting in process or complete as of 4/30/2016; construction began 8/13; construction mostly complete with transformer in place 9/20; operational 10/7 10/7/2016
    Bonita Lakes Mall Thread
    MS Pearl I-20
    8
    sources say construction to begin by spring 2016; operational 3/31 3/31/2016
    200 Bass Pro Drive
    Thread
    MT West Yellowstone US-20/US-191 8
    Tesla technician to go to site 5/24/2016; operational 5/25 5/25/2016
    201 South Canyon Street Thread
    NC Asheville I-26/I-40 8 Permit applications 15-10934, 15-10937, 15-10938 found 8/22/2015 being processed by city; permit approved 10/13; permit issued 10/16, reissued 10/23; under construction 10/30; transformer installed 11/23; awaiting power on/testing 12/9; operational 12/16 12/16/2015 800 Brevard Road Thread
    NC Warsaw I-40 6 Under construction as of 2/23/2016; operational 3/11 3/11/2016 Quality Inn, 2676 NC 24 Thread
    NH Seabrook I-95 8 Up for planning board approval 5/19/2015 and approved with conditions; construction began 8/22; waiting for transformer 9/25; transformer installed 10/5; operational 10/9 10/9/2015 near Panera, 700 Lafayette Road Thread
    NH West Lebanon I-89 8 Permit approved 2/19/2015; construction began 5/11; construction mostly complete and waiting for transformer 6/20; transformer installed 6/25; operational 7/17 7/17/2015 Price Chopper, 285 North Plainfield Thread
    NJ Egg Harbor Township IGSP/ACE 8 Found under construction 5/26/2016, transformer installed 6/16; operational 6/22 6/22/2016
    3121 Fire Road Thread
    NJ Joyce Kilmer Service Area I-95 4 Turnpike authority approved agreement 9/23/2014; equipment on site 3/13/2015; construction began 4/29, apparently complete and waiting for transformer 5/26 5/26/2015 NB I-95 in East Brunswick Thread
    NJ Molly Pitcher Service Area I-95 4 Turnpike authority approved agreement 9/23/2014; construction started 5/15/2015; construction complete and awaiting transformer 6/20; operational 7/8/2015 7/8/2015 SB I-95 in Cranbury Thread
    NJ Tinton Falls GSP 8 Found with construction complete and transformer installed 7/28/2015, awaiting inspection/power on/testing; operational 9/19 9/19/2015 Jersey Shore Premium Outlets Thread
    NM Albuquerque I-40 6 Site selected but permit application not yet filed 3/5/2015; construction began 5/1, to be complete by ~5/22; testing 6/1?; mysterious fence needed as of 8/3; fence line chalked on 8/18; fence construction started 8/24, operational 9/4 9/4/2015 Holiday Inn Express, 2500 Menaul Blvd NE Thread
    NM Las Vegas I-25
    Site selected, in planning stage working with local utility 3/20/2015; contract award expected by 5/8; equipment staged on site 6/27; construction well underway 8/4; construction complete, awaiting meter and power on 8/30; meter and transformer installed 9/4, awaiting power on and testing; operational 9/11 9/11/2015 Comfort Inn, 2500 North Grand Avenue Thread
    NM Santa Rosa I-40 6 Under construction 3/4/2015, construction expected to be complete ~3/20; operational 3/13 3/13/2015 Holiday Inn Express, 2516 Route 66 Thread
    NM Tucumcari I-40
    Media report of upcoming supercharger 2/3/2015; in early stages of construction 3/27; operational 4/19 4/19/2015 Holiday Inn Express, 2624 South Adams Street Thread
    NV Beatty US-95 8 Tesla working with site owners as of 9/14/2015 - hope to be operational by end of 2015; no construction as of 10/17; under construction 10/31; transformer installed 1/25/2016; operational 2/8 2/8/2016 Eddie World, US-95 North Thread
    NV Gardnerville US-395 6 Permit issued 8/24/2015; under construction 9/24; operational 10/22/2015 10/22/2015 Topaz Lodge, 1979 S Highway 395 Thread
    NV Hawthorne US-95 8
    Under construction 4/23/2016; awaiting hookup & testing 5/2; operational 5/3 5/3/2016
    Port o Subs, Freedom Road near Bonanza Road Thread
    NV Reno US-395 8
    Under construction 5/4/2016; operational 5/5 5/5/2016
    Atlantis Hotel / Casino, 3800 S Virginia St Thread
    NV Tonopah US-95
    Tesla in negotiations with City of Tonopah as of 10/14/2015; town board approved contract, sent to Tesla for signature 12/23; design finalized as of 2/29/2016, under construction 5/21; operational 6/2 6/2/2016
    Pocket Park, 201 North Main St Thread
    NY Binghamton I-81/I-88
    Site selected and in design phase as of 7/8/2015; near construction phase as of 8/31; one permit remaining as of 10/2, in early stage of construction 10/15; transformer installed 10/30; testing 10/30; operational 10/31 10/31/2015 The Spot Restaurant, 1062 Front Street Thread
    NY Clarence I-90 8 Tesla of Canada says lease negotiations almost complete as of 7/1/2014; special exemption use permit on agenda of 11/5 Town board meeting; passed by Town Board; pavement markings 4/9/2015; construction began 4/13; awaiting transformer 5/5; transformer installed 6/4; operational 6/11 6/11/2015 4455 Transit Road Thread
    NY Kingston I-87 8 Found under construction 9/27/2016; operational 10/17 10/17/2016
    660 Washington Avenue Thread
    NY Newburgh I-84/I-87 6 Construction began 4/9/2015, fixing construction issues and awaiting transformer and power hookup 5/9; ripped up and needing extensive work because of contractor error 5/28; work expected to be complete 6/5; operational 6/9 6/9/2015 Cosimo's Restaurant, 1217 Route 300 Thread
    NY Plattsburgh I-87
    Design complete as of 4/9/2016; under construction 4/22; construction complete 5/20, awaiting transformer & hookup by 5/27, operational 6/9 6/9/2016
    Champlain Centre
    Thread
    NY Queensbury I-87
    Sources say coming soon as of 2/27/2016; under construction 7/10; operational 7/15 7/15/2016
    near Friendly's, Aviation Mall
    Thread
    NY Southampton NY-27 6
    Under construction 3/31//2016; awaiting transformer & hookup 5/26; operational 6/2 6/2/2016
    850 Southampton Bypass
    Thread
    NY Syracuse I-90 6 Permitting process will start by end of November 2014; Charlotte crew says they will be doing this site and Utica; Under construction 2/5/2015; to be tested 4/16; operational 4/16 4/16/2015 Holiday Inn, 441 Electronics Parkway, Liverpool NY Thread
    NY Watertown I-81
    Sources say coming soon as of 2/25/2016; operational 6/24 6/24/2016
    21182 Salmon Run Mall
    Thread
    OH Cincinnati
    6 Tesla representative said supercharger would be coming here in presentation to Grove City city council 10/6/2014; under construction on 4/21/2015; awaiting transformer & hookup 5/10; operational 6/5 6/5/2015 Service Center, 9111 Blue Ash Road Thread
    OK Ardmore I-35
    Sources says this is coming "in the first two months of 2015"; Ardmore city official confirms it is in permitting 12/23/2014; permit issued 2/2/2015; pavement markings found 2/7; under construction 2/24; testing 3/11; operational 3/13 3/13/2015 Interurban Classic Grill, 322 Holiday Drive Thread
    OK Catoosa I-44 8 Lease approved 10/28/2015; under construction 5/16/2016; awaiting transformer & hookup 6/22; transformer installed 7/12; operational 7/20 7/20/2016
    Cherokee Hard Rock Hotel & Casino, 777 West Cherokee Street Thread
    OK Oklahoma City I-40 8 Perry OK contractor reported that they will build Oklahoma City supercharger next, permit pending as of 3/13/2015; permit BLDC-2015-01023 issued 3/24/2015; construction began 6/2; awaiting transformer and hookup 7/14; transformer installed 7/26, waiting for meter and hookup; operational 7/31 7/31/2015 Outlet Shoppes, 322 Outlet Shoppes Drive Thread
    OK Perry I-35 6 Supercharger permit approved by city council 12/15/2014; construction began 3/6/2015; transformer installed 4/8; operational 4/15 4/15/2015 west of Mobil station, 2812 Fir Street Thread
    OK Weatherford I-40
    Under construction 2/24/2015; construction mostly complete 3/6; testing 3/11; operational 3/11 3/11/2015 Lucille's Roadhouse, 1301 North Airport Road Thread
    OR Baker City I-84 8 In permitting as of 5/15/2015; under construction 5/31; transformer in place 6/7 but construction still continuing; construction nearly complete 6/21; operational 6/25 6/25/2015 Best Western, 1 Sunridge Lane Thread
    OR Bandon US-101 8
    Tesla planning site as of 6/27/2016; permits 194-16-001441-STR and 194-16-001442-ELEC submitted for review 7/26; permits issued 9/13, 9/15; construction underway 9/20; awaiting transformer & hookup 10/29; operational 11/4 11/4/2016
    44 Michigan Avenue NE
    Thread
    OR Bend US-97 8 construction well underway 5/19/2016, awaiting transformer 6/7; transformer delivered 6/13; operational 6/17 6/17/2016
    Fred Meyer, 61535 S Hwy 97 Thread
    OR Lincoln City US-101 8
    Permit 519-16-001698-ELEC ready to issue 6/27/2016; construction began 7/13, passed final inspections 8/3; operational 8/18 8/18/2016
    1500 SE East Devils Lake Road
    Thread
    OR Pendleton I-84
    Sources say this is coming as of 3/25/2015; under construction 4/24; construction nearly complete 5/10; waiting for transformer 5/18; operational 5/28 5/28/2015 Wildhorse Resort & Casino, 46510 Wildhorse Blvd. Thread
    OR Sandy US-26 8 Construction well underway 10/1; waiting for transformer / hookup 10/21; operational 11/4 11/4/2015 Fred Meyer, 16625 SE 362nd Avenue Thread
    OR Seaside US-101 8
    Permit issued 5/31/2016; construction mostly complete 6/27; operational 7/1 7/1/2016
    Seaside Factory Outlet Mall, 1111 North Roosevelt Drive
    Thread
    PA Bloomsburg I-80
    8
    Construction appears complete 9/22/2016; not operational 9/26; operational 10/14 10/14/2016
    Ruby Tuesday, 11 Ricky Street
    Thread
    PA Erie I-90 8 Tesla says that a location has been chosen 12/6/2014; on Coming Soon map released 12/18/2014; Tesla says actively working on a site as of 10/26/2015; building permits in process as of 1/21/2016; construction started 4/18; transformer installed 5/18; operational 6/3 6/3/2016
    Hilton Garden Inn, 2225 Downs Drive Thread
    PA Harrisburg I-83 8
    Tesla says actively working on a site as of 10/26/2015; found under construction 4/10/2016; transformer installed 4/21; construction mostly complete 4/29; testing 5/4; operational 5/9 5/9/2016
    near Weis Market, 3915 Union Deposit Road Thread
    PA South Whitehall (Allen Town)
    8 in contractor bidding process 3/1/2014; permit changes 4/4/2014; Planning Board recommended for approval 7/16; preliminarily approved 8/4; Board of Commissioners approval 8/11; site apparently scrapped by Tesla because of utility connection issues 12/4; in zoning appeals process at new site 8/14/2015; zoning hearing delayed because finalized lease agreement needed 8/26; Tesla cleared to proceed because no zoning relief required 9/23; construction started 12/4; transformers installed as of 1/3/2016 but construction work remains; connecting to grid 1/19; operational 1/21 1/21/2016 4650 Broadway, Allentown Thread
    PA Tannersville
    8 Tesla spokesperson claims ground breaking soon as of 9/25/2015; Simon Premium Outlets confirmed superchargers are coming 10/10, said they hope to have them open in November; construction appears complete 12/5; operational 12/14 12/14/2015 The Crossings Premium Outlets Thread
    SC Greenville I-85/I-385 8 in permitting as of 4/10/2014; contractor bids due 5/2/2014; permit approved 5/6/2014; construction began 5/12/2014; lawsuit halted construction - hearing in October; alternate site selected as of 11/21 and is in permitting process; lawsuit trial scheduled for August 24 2015; construction to begin soon at alternate site as of 7/13/2015; remaining equipment at old site removed 7/20; in permitting process as of 9/2; permit 15-2189 issued 9/4; construction equipment staged on site 9/23; under construction 9/26; construction complete with transformer installed 10/20, awaiting hookup & testing; connected to the grid 11/3; operational 11/9 11/9/2015 106 Carolina Point Parkway Thread
    TN Knoxville I-75/I-40
    Under construction as of 5/1/2015; transformer in place 5/16; awaiting testing 5/22; operational 5/27 5/27/2015 11038 Parkside Drive Thread
    TN Nashville I-65
    looking for site as of 9/3/2014; on Coming Soon map released 12/18/2014; construction apparently complete 6/26/2015; operational 7/8/2015 7/8/2015 1641 Westgate Circle Thread
    TX Amarillo I-40 8 site may have been misunderstanding between HPWC and superchargers - no permit activity as of 8/23/2015; permit found 9/23; construction began 9/29; waiting for transformer and hookup 10/20; transformer installed 10/30; meter installed 11/3, waiting for inspection / power on; operational 11/5 11/5/2015 Holiday Inn, 8271 West Amarillo Boulevard Thread
    TX Childress US-287
    8
    Under construction 10/17/2016; operational 10/19 10/19/2016
    1300 Avenue F NW
    Thread
    TX Cisco I-20 8
    On 1/18/2016 Tesla said coming in the first half of 2016; lease agreement signed as of 3/21; construction starting 5/19; transformer installed 7/17, awaiting testing; operational 8/19 8/19/2016
    Flying J, 16851 Interstate Highway 20
    Thread
    TX Denton I-35 6 All permitting reviews except planning completed by 11/13/2014; planning review completed 11/20; next step is pre-application conference; out for contractor bid as of 5/6/2015; permit processing due to be complete 6/26; will be out for contractor bids 6/29; permit approved 7/31; construction began 10/2; awaiting testing 10/30; operational 11/3 11/3/2015 2710 West University Drive Thread
    TX Houston I-45
    Found under construction 6/22/2015; operational 7/9 7/9/2015 Service Center, 14810 North Freeway Thread
    TX Kingsville US-77
    8
    construction complete, awaiting transformer & hookup 10/20/2016; operational 11/15 11/15/2016
    Holiday Inn Express, 2400 South Highway 77
    Thread
    TX Lindale I-20
    Site selected as of 11/20/2015; construction to begin March or April 2016; under construction 4/2; transformer installed, awaiting power on and testing 4/21; operational 6/8 6/8/2016
    Collin Street Bakery, 17044 I-20 Thread
    TX Shamrock I-40 6 On Coming Soon map released 12/18/2014; lease signed November 2014; reported under construction 2/9/2015; construction complete 2/18; operational 2/20 2/20/2015 U-Drop Inn Thread
    TX Sulfur Springs I-30 8 City council passed lease agreement 1/5/2016; construction under way 5/6; awaiting transformer & hookup 6/17; operational 6/29 6/29/2016
    300 block of Tomlinson Thread
    TX Sweetwater I-20 8
    On 2015 map released 12/18/2014; on 1/18/2016 Tesla said coming in the first half of 2016; site selected and approaching construction phase as of 2/27; permitting in progress as of 4/3; permitting process apparently complete 4/12; construction started 6/11; construction complete 8/1, awaiting transformer & hookup; operational 8/19 8/19/2016
    Holiday Inn Express, 300 SE Georgia Avenue
    Thread
    TX Three Rivers I-37

    Mentioned in article dated 8/10/2016; awaiting transformer & hookup 8/21; transformer & meter installed 9/15, awaiting testing & power on; operational 9/30 9/30/2016
    Love's Travel Center, 2645 S. Hwy 37, I-37 Exit 72
    Thread
    TX Victoria US-59/US-87
    Site on September building report dated 9/21/2015; construction well underway 12/12; operational 12/30 12/30/2015 3107 South Laurent St Thread
    UT Price US-191 8 Reportedly out for contractor bid 3/6/2015; contractor award delayed as of 4/20; conditional use permit approved ~6/26; construction to begin soon as of 9/16; operational 10/16 10/16/2015 Holiday Inn Express, 925 Westwood Boulevard Thread
    UT Salt Lake City I-80/I-15 10 Construction started 2/18/2015; operational 3/6 3/6/2015 Tesla Service Center, 2312 South State Street Thread
    UT Tremonton I-15/I-84
    Bid awarded to contractor 2/10/2015; operational 4/1/2015 4/1/2015 Hampton Inn, 2145 West Main Street Thread
    UT Tooele I-80 6 County official said supercharger was coming as of November 2014; approved by county planning & zoning 12/16; under construction 2/4/2015; mostly complete 2/18; operational 2/24 2/24/2015 1568 East Saddleback Blvd. Thread
    VA Lexington I-81/I-64
    Tesla says coming within the next year as of 3/16/2015; plans submitted for permitting ~11/9; permit issued 11/23; under construction 11/29; operational 12/16 12/16/2015 Holiday Inn Express, 880 North Lee Highway Thread
    VA Norfolk I-64 6 In permitting as of 4/23/2015; Nashville installation crew to go here ~7/1; construction began 7/8; construction complete 7/29 but awaiting 450 foot connection to the grid; connecting to the grid 8/4; planned power outage needed to complete grid connection as of 8/11; operational 8/13; temporarily closed 8/14; will likely remain closed "for at least a few more weeks" as of 8/27; transformer turned on but chargers still off 9/28; operational 10/17 10/17/2015 5900 East Virginia Beach Boulevard Thread
    VA Strasburg I-81 6 Approved by planning commission 4/29/2015; construction started ~7/7; transformer installed 8/19; to be tested 9/1; operational 9/2 9/2/2015 Denny's, 119 Hite Lane Thread
    VA Wytheville I-81/I-77
    Tesla says coming within the next year as of 3/16/2015; Tesla says will be permitted soon and started in 2015 as of 9/25; plans submitted for permitting ~11/9; permit issued 11/24; reportedly under construction 12/14; energized and ready for testing 12/23; operational 12/30 12/30/2015 Holiday Inn Express, 165 Malin Drive Thread
    VT Berlin I-89
    8
    Approved by Development Review Board 6/21/2016; Under construction 8/30/2016 10/3/2016
    159 Paine Turnpike NorthThread
    VT Brattleboro I-91 8 Tesla reportedly looking for site 7/7/2014; construction well underway 11/29; awaiting transformer and hookup 12/23; transformer to be installed ~1/12/2015; operational 1/16 1/16/2015 Price Chopper Plaza, 499 Canal Street Thread
    VT South Burlington I-89 8 Reportedly coming as of 12/12/2014; in permitting 6/2/2015; approved by Development Review Board 7/14; waiting for one more permit approval, construction began 9/29; transformer in place 10/22; operational 11/4 11/4/2015 222 Dorset Street Thread
    WA Kennewick I-82 8 Found under construction 8/4/2015; mostly complete and awaiting testing and power on 8/25; operational 9/4 9/4/2015 Fred Meyer, 2811 West 10th Avenue Thread
    WI Sheboygan I-43 8 Conditional use permit application submitted, under review 4/28/2015; construction began 8/17; construction appears complete with transformer installed 10/4; operational 10/7 10/7/2015 Festival Foods Market, 595 South Taylor Drive Thread
    WY Gillette I-90 4 agreement with Hampton Inn completed 5/28/2015; construction reported begun 8/29; operational 9/24/2015 9/24/2015 Hampton Inn, 211 Decker Court Thread
    WY Jackson

    Permit application submitted 4/8/2016; construction started 9/13; awaiting power on and testing 10/7; operational 10/18 10/18/2016
    Jackson Whole Grocer & Cafe, 1155 South US Highway 89 Thread
    WY Sheridan I-90 4 site selected as of 4/20/2015; construction began 6/15; transformer installation 6/26; ready for inspection 7/1; testing expected week of 7/6-7/10; operational 7/15 7/15/2015 Best Western, 612 North Main Street Thread
    AB Canmore
    4 summer 2014? Instead of Lake Louise Site selected as of 7/11/2014; permit submitted to city 9/16; construction began 11/6; expected complete 12/15; operational 3/11/2015 3/11/2015 Canmore Rocky Mountain Inn, 1719 Bow Valley Trail
    AB Red Deer

    summer 2014? Site selected as of 7/11; city planning department told Tesla no permit is required (reported 10/3). Operational 1/22/2015 1/22/2015 Sheraton Red Deer Hotel, 3310 50 Avenue
    BC Golden
    4 Instead of Lake Louise Site selected as of 7/11; permitting in progress 9/22; permit has been issued 11/12; construction underway 12/5; operational 2/4/2015 2/4/2014 Golden Travelodge, 1200 12th Street North
    BC Kelowna

    On Tesla's 2015 list? Location confirmed by hotel 10/15, under construction 10/28; construction complete and waiting for transformer 11/13; transformer installed 12/16; transformer energized, awaiting testing 12/24; operational 12/20 12/30/2015 Best Western, 2402 Highway 97 Thread
    BC Revelstoke
    4 summer 2014? Site selected as of 7/11; approved by city council 9/16; construction started ~11/21; operational 12/30 12/30/2014 Best Western Plus, 1925 Laforme Blvd
    ON Barrie
    8 summer 2014? Awaiting approval of amendment to site plan 11/14; Tesla says construction started 12/15; construction mostly complete 1/3, awaiting utility transformer; now operational
    20 South Village Way - Target parking lot ? Post
    ON Comber

    Tesla says lease negotiations nearly finished 7/1/2014; in permitting process 11/14 and awaiting approval by Ministry of Transportation; Tesla says to break ground soon as of 12/15; under construction 1/17/2015; operational 3/24 3/24/2015 7016-7036 Industrial Drive
    ON Grimsby

    Tesla says approaching contruction phase as of 2/21/2016; construction starting 4/18; operational 5/13 5/13/2016
    Casablanca Winery Inn, 4 Windward Drive

    ON Huntsville

    construction began 7/15/2016; transformer installed 7/29, awaiting power on & testing; operational 9/30 9/30/2016
    70 King William Street
    Thread
    ON Parry Sound 6

    Tesla says will be built summer 2016; Tesla says about to break ground as of 6/27/2016; under construction 7/21; operational 9/2 9/2/2016
    292 Louisa Street
    Thread
    ON Port Hope

    Tesla says near construction stage as of 10/22/2015; found under construction 12/14; operational 12/20 12/20/2015 Harvey's, Northunberland County Road 28 at 401
    QC Drummondville 20 exit #177 8 Lease finalized, permitting starting as of 6/19/2014; construction began 11/15 (blog post with lots of details in French here); work seems stalled as of 12/13/2014; work resumed as of 01/12 French details here (pics included)... endless waiting... stay tuned... awaiting transformer installation 3/12/2015; opening is near 03/27/2015 details here (in French); operational as of april 8th 4/8/2015 755 BOUL. RENÉ-LÉVESQUE TM coming soon page
    QC Magog 10 8? Minor zoning approval needed as of 4/6/2016, construction begun 5/4; construction complete 6/6; connected to grid 6/13; operational 6/22 6/22/2016
    Avril Magog, 2381 rue Principale Ouest Thread
    QC Rivière-du-Loup 20/132 6-8? in Tesla's book for 2015; apparently the lease is finalized... Stay tuned; now stated as Permit status on supercharge.info, the site chosen is at the Hôtel Universel (which has already a Sun Country Highway charger) 4/21, pavement markings 6/9/2016, construction began 8/10; operational 9/20 9/20/2016
    Hôtel Universel, 311 boul de l'Hôtel de Ville, Rivière-du-Loup, Qc Thread
    QC Saint-Laurent 10 12 Found under construction 5/3/2016; awaiting transformer & hookup 5/26; transformer installed 6/2; testing 7/11; operational 7/12 7/12/2016
    Place Vertu
    There is a list of confirmed and completed Supercharger at Tesla Supercharger locations[/td]
     
  2. markb1

    markb1 Active Member

    Joined:
    Feb 17, 2012
    Messages:
    2,318
    Location:
    San Diego, CA
    Not sure we can really say San Juan Capistrano is permitted. There's an architectural control project in the city's database, but no building permit (that I can find), and I think there needs to be before construction starts.
     
  3. brianman

    brianman Burrito Founder

    Joined:
    Nov 10, 2011
    Messages:
    15,487
    So Woodburn, Fremont, and San Marcos should be removed now. Right?
     
  4. purplewalt

    purplewalt Active Member

    Joined:
    Jun 9, 2013
    Messages:
    1,413
    Location:
    Dallas, Texas
    I just edited and added several stations to the other thread.
    Hope I didn't mess the protocol up.
    One in FL shows to be open, but was not on the list.
    I was led to believe Freemont is open.
     
  5. Vger

    Vger Active Member

    Joined:
    Apr 10, 2009
    Messages:
    1,683
    Location:
    Salt Spring Island, BC, Canada
    Fremont is definitely open. I have seen it operating.
     
  6. wycolo

    wycolo Active Member

    Joined:
    May 16, 2012
    Messages:
    2,425
    Location:
    WY
    Silverthorne CO = 8 chargers

    Glenwood Springs CO = 6 chargers
     
  7. GSP

    GSP Member

    Joined:
    Dec 28, 2007
    Messages:
    1,997
    Is the "other thread" a wiki of operating Superchargers? If so, I suggest adding a link to it. Also link this thread from the "other" one.

    GSP
     
  8. ZBB

    ZBB Emperor

    Joined:
    Feb 27, 2013
    Messages:
    1,419
    Location:
    Scottsdale
    The Yuma, AZ location has been announced. But no news of any work on it yet.

    This post links to the published article: Yuma AZ Supercharger

    Here's the link to the article from 8/3/13 in the Yuma Sun. States that Yuma's Design and Historic Review Commission has approved the location: , yuma, new, stations - Business - YumaSun
     
  9. dsm363

    dsm363 Roadster + Sig Model S

    Joined:
    May 17, 2009
    Messages:
    18,235
    Location:
    Las Vegas, NV
    It might be simpler to have one Supercharger Wiki thread. Once an exact address is confirmed, they can be added as 'under construction'. Rumors of sites can go in various regional forums.
     
  10. purplewalt

    purplewalt Active Member

    Joined:
    Jun 9, 2013
    Messages:
    1,413
    Location:
    Dallas, Texas
    The "other thread" is a wiki of ALL OPERATING and THOSE WITH SIGNIFICANT CONSTRUCTION (verified via photos and addresses).
    Mod: If you would please link the two threads, that would be great.
     
  11. Cheerose

    Cheerose Member

    Joined:
    Mar 4, 2013
    Messages:
    161
    Location:
    Fort Lauderdale, FL
    Waco opening: 09/10/13
     
  12. emupilot

    emupilot Member

    Joined:
    May 23, 2013
    Messages:
    930
    Location:
    Northern California
    #12 emupilot, Sep 6, 2013
    Last edited: Sep 6, 2013
  13. purplewalt

    purplewalt Active Member

    Joined:
    Jun 9, 2013
    Messages:
    1,413
    Location:
    Dallas, Texas
    I have added Madison, removed Freemont, Woodburn, San Marcos, Updated Bellmead (Waco).
     
  14. jrreno

    jrreno Nothin' left to do but smile, smile, smile

    Joined:
    Jul 21, 2013
    Messages:
    691
    Location:
    Sarasota , Florida
    Port Orange Florida has 6 stations. Should be officially open early next week. And yea, that's a real rainbow!




    image.jpg image.jpg
     

    Attached Files:

  15. Mayhemm

    Mayhemm Model S P85+ "Lola"

    Joined:
    Nov 9, 2012
    Messages:
    1,939
    Location:
    Saskatchewan, Canada
    Strange to see the charge ports perpendicular to the parking spaces. Usually they are parallel for easier connection. Are the cables here longer?
     
    • Love x 1
  16. jrreno

    jrreno Nothin' left to do but smile, smile, smile

    Joined:
    Jul 21, 2013
    Messages:
    691
    Location:
    Sarasota , Florida
    Cable is the same. It is supposedly for ADA parking but the drivers side would be at the curb. The construction guy said he has to build it per the drawing even if it does not make sense. BTW, this SC is now operational even though it is not officially opened.
     
  17. sublimaze1

    sublimaze1 8Dec2012 / Leeroy Jenkins

    Joined:
    Sep 6, 2012
    Messages:
    1,091
    Location:
    Basin City, TX
    what is all that water-like stuff on the ground? :wink:
     
  18. Lawsteve

    Lawsteve MCATDT

    Joined:
    Aug 12, 2013
    Messages:
    533
    Location:
    Tampa, FL
    They applied Opticoat for that "wet" look......:biggrin::biggrin:
     
  19. jrreno

    jrreno Nothin' left to do but smile, smile, smile

    Joined:
    Jul 21, 2013
    Messages:
    691
    Location:
    Sarasota , Florida
    Port Orange is now on the Tesla website SC map!
     
  20. stevezzzz

    stevezzzz R;SigS;P85D;SigX

    Joined:
    Nov 13, 2009
    Messages:
    6,062
    Location:
    Colorado
    So is Glenwood Springs, Colorado!
     