This is a wiki page about prospective Supercharger locations and their progress. Once open they can be moved to the archive table. State Location Hwy (Exit) Chargers Status Expected Open Date Notes Thread Link AR Lowell I-49 8 Under construction 1/29/2020 898 West Monroe Avenue Thread AZ Ehrenberg I-10 8 Tesla sign says coming soon as of 11/11/2019; under construction 11/19; operational 11/27 11/27/2019 Flying J, 14320 Frontage Road North Thread AZ New River I-17 10 Under construction 12/5/2019; operational 12/24 12/24/2019 3906 West New River Road Thread CA Anaheim I-5 8 Permit application BLD2018-04056 submitted 9/7/2018; permit issued 2/11/2019 440 North Euclid Street Thread CA Anaheim - Katella Street I-5/CA-57 16 Permit BLD2019-03822 issued 10/25/2019; operational 12/23 12/23/2019 2404 East Katella Avenue Thread CA Berkeley I-80 16 Under construction 2/1/2020 3288 Pierce Street Thread CA Bishop US-395 12 Proposal presented to City Council 8/26/2019; City Council ratified agreement 9/23; permit approved 10/30 151 South Warren Street Thread CA Blythe I-10 12 Lease agreement in place 10/24/2019 160 South Lovekin Blvd Thread CA Buena Park - Beach Blvd I-5 24 Under construction 12/21/2019 6911 Brenner Avenue Thread CA Calabasas US-101 24 Permit approved 10/2/2017, ready to issue 11/26; crates removed from site 5/20/2019 4799 Commons Way Thread CA Chula Vista 125 12 Under construction 10/30/2019 Target, 910 Eastlake Parkway Thread CA Dublin - Dublin Blvd I-580 10 Permit application BLDG-2018-02182 submitted 10/11/2018; permit issued 5/22/2019; under construction 6/1; some pedestals installed 1/26/2020 Target, 2800 Dublin Blvd Thread CA El Cerrito I-80 12 Under construction 1/20/2020 180 El Cerrito Plaza Thread CA Elk Grove I-80 12 Under construction 1/30/2020 8469 Elk Grove Blvd Thread CA Emeryville I-80 12 Tesla in negotiations with City and mall management as of 4/19/2018; design review approved 5/10; minor design review for new site approved 9/12; under construction 8/11/2019; pedestals installed 1/24/2020 5795 Christie Avenue Thread CA Gilroy - Gilroy Crossing US-101 20 In permitting as of 7/30/2019 6705 Camino Arroyo Thread CA Goleta US-101 12 Under construction 12/28/2019 6975 Marketplace Drive Thread CA Hawthorne - El Segundo Blvd I-405 18 Under construction 11/3/2019; operational 11/21 11/21/2019 4427 West El Segundo Blvd Thread CA Huntington Beach I-405 12 Permit C2017007180 applied for 10/30/2017 7777 Edinger Avenue Thread CA Irvine - Main Street I-405 12 Permit 00793338-CPKM applied for 7/23/2019 1970 Main Street Thread CA Larkspur US-101 8 Permit issued late December 2019 Bon Air Center, Sir Francis Drake Blvd Thread CA Lincoln CA-65 8 Under construction 10/3/2019 Target, 950 Groveland Lane Thread CA Los Altos Urban 16 Under construction 2/1/2020 Target, 950 Groveland Lane Thread CA Los Angeles - Alameda Street I-10 16 Electrical permit 19041-10000-40333 approved 11/26/2019; building permit 19016-10000-31930 approved 12/10 787 South Alameda Street Thread CA Manteca - Spreckels Avenue CA-99 12 Under construction 10/15/2019; awaiting pedestals 11/7; transformer installed 11/26; cabinets installed 2/8/2020 Target, 280 Spreckels Avenue Thread CA Marin City US-101 12 Permit application filed 3/1/2018; planning commission approved loss of parking spaces 3/25/2019, Board of Supervisors approved 4/17 190 Donahue Street Thread CA Mission Viejo I-5 10 Minor modification MM2019-475 on agenda of Planning and Transportation Committee 9/9/2019 555 Shops Blvd Thread CA Montecito CA-101 8 Permit 19ELE-00000-00247 applied for 6/20/2019; permit application resubmitted 11/13; permit approved & ready to issue 12/23 1595 South Jameson Lane Thread CA Moreno Valley I-215/CA-60 20 Under construction 10/24/2019; cabinets delivered 1/15/2020; transformer installed 2/5 2755 Canyon Springs Parkway Thread CA Novato CA-101 20 Permit B2019-0918 applied for 4/22/2019, approved 6/6/2019, issued 7/2/2019; under construction 10/4; awaiting transformer 12/26 208 Vintage Way Thread CA Oakland - Hegenberger Road I-880 16 Building permit B1904077 issued, electrical permit E1902050 issued, planning exemption DRX191780 approved as of 10/24/2019 640 Hegenberger Road Thread CA Oakland - Jack London Square I-880 12 Building permit B1904081 and electrical permit E1902522 issued 10/1/2019 255 Second Street Thread CA Olema CA-1 6 Plans in permit review as of 7/8/2019 10005 Coastal Highway Thread CA Palmdale CA-14 12 On Tesla coming soon sign at Mojave supercharger 12/2/2019; construction started 2/5/2020 Antelope Valley Mall, 1233 Racho Vista Blvd Thread CA Paso Robles US-101 12 Permit application B19-0934 submitted for review December 2019 2449 Golden Hill Road Thread CA Roseville - Roseville Parkway I-80 8 Under construction 11/4/2019; awaiting power on / testing 1/15/2020; operational 2/15 2/15/2020 1112 Galleria Blvd Thread CA Sacramento - Freeport Blvd CA-99/I-5 8 Permit application submitted for review 10/21/2019 4700 Freeport Blvd Thread CA San Dimas CA-210 16 Site reportedly selected as of 9/18/2017 Costco, 520 North Lone Hill Avenue? Thread CA San Francisco US-101 16 Permit application 1810032159 submitted 10/3/2018; permit approved 7/16/2019 601 Van Ness Avenue Thread CA San Jose - Cottle Road CA-85/US-101 14 Permit AD18-957 applied for 12/6/2018 5630 Cottle Road Thread CA San Jose - Holger Way CA-237 18 Permit AD19-429 submitted for review 5/6/2019; under construction 11/16; pedestals installed 2/2 95 Holger Way Thread CA San Jose - Tuers Road US-101 20 Under construction 1/1/2020; cabinets installed 2/2 3096 Tuers Road Thread CA Santa Barbara US-101 8 Planning application PLN2019-00551 to screen superchargers approved 11/7/2019; electrical permit BLD2019-06787 ready to issue as of 12/27/2019 3943 State Street Thread CA Santa Monica CA-1 24 Planning submittal 18PRE-0005 for restaurant & supercharger station in process as of 3/5/2018 1401 Santa Monica Blvd Thread CA Santa Rosa US-101 20 Permit B19-1548 issued as of 7/11/2019; awaiting transformer 9/7/2019; transformer installed 10/3; operational 11/21 11/21/2019 380 Coddington Center Thread CA Scotts Valley CA-17 12 Under construction 10/4/2019; awaiting testing 1/23/2020; operational 1/30 1/30/2020 230 Mount Hermon Road Thread CA South San Francisco US-101 16 Permit B19-0319 submitted 3/4/2019; permit resubmitted 5/28; permit approved 6/10; under construction 9/4; operational 2/14/2020 2/14/2020 Embassy Suites, 250 Gateway Blvd Thread CA Stockton I-5 12 Permit BP19-06217 submitted 8/26/2019; plans resubmitted 10/15; permit ready to issue 10/29; under construction 12/16 Hilton, 2323 Grand Canal Blvd Thread CA Turlock CA-99 8 Permit created as of 1/16/2020 Target, 3000 Countryside Drive Thread CA Visalia CA-99 24 In plans for new hotel / truck stop; permit application A1903809 under review 12/12 Comfort Inn, 6670 Betty Drive Thread CA Williams I-5 12 Building official says permit has been approved as of 7/8/2019; under construction with transformer installed 11/17, awaiting pedestals; awaiting power on / testing 11/27; operational 12/18 12/18/2019 Granzella's Thread CA Windsor US-101 12 Permit application B18-0481 submitted 10/29/2018; permit approved 5/29 8852 Lakewood Drive Thread CA Woodland I-5 12 In permitting 12/26/2019 Target, 2185 Bronze Star Drive Thread CO Brighton I-76 8 Under construction 1/20/2020 5112 East Bromley Lane Thread CO Idaho Springs I-70 8 Discussed at city council public hearing 6/5/2019; under construction 11/8; operational 2/6/2020 2/6/2020 Kum & Go, 1319 Miner Street Thread CO Lakewood I-70 8 Under construction 1/29/2020 14500 West Colfax Avenue Thread CO Thornton I-25 8 Under construction 1/20/2020 237 East 120th Avenue Thread CO Wheat Ridge I-70 8 Tesla discussed potential site with city planner in February 2018 Applewood Village, 3500 West Youngfield Street? Thread CT Fairfield - Northbound I-95 12 Under construction 7/7/2019; transformer installed but awaiting pedestals 9/7; pedestals installed 11/19; operational 12/23 12/23/2019 165 Round Hill Road Thread CT Fairfield - Southbound I-95 8 Under construction 7/7/2019; transformer installed but awaiting pedestals 9/7; pedestals installed 11/19; operational 12/20 12/20/2019 267 Round Hill Road Thread CT Lisbon I-395 12 Zoning permit application submitted as of 1/29/2019 160 River Road Thread CT Madison I-95 6 Under construction 8/17/2019; awaiting pedestals 11/19; pedestals installed 1/2/2020; Northbound operational 1/29, Southbound operational 1/30 1/29/2020 I-95 Rest Areas, Northbound and Southbound Thread CT Meriden I-91 8 Tesla in talks about siting with city 5/14/2018; plan before Planning Commission 8/14/2019; construction starting 10/7; awaiting pedestals 11/19; pedestals delivered 1/23/2020; awaiting testing 2/5 Dunkin Donuts, 875 East Main Street? Thread CT New London I-95 12 Under construction 1/23/2020 New London Mall, 351 North Frontage Road Thread CT Old Lyme I-95 12 Site Development Plan/Special Exception Modification Application received 12/11/2017; public hearing to be held 1/8/2018; hearing continued until 2/12; application denied 4/9 90 Halls Road Thread CT Hartford - Liebert Road I-91 12 Under construction 2/9/2019; transformer installed 11/14, awaiting power on / testing Pride Travel Center, 195 Liebert Road Thread DC Washington - NE US-50 12 Utility survey called for 7/17/2019; permit B2000417 applied for 10/10 and approved 10/28 2438 Market Street NE Thread DC Washington - Wisconsin Avenue NW Urban 8 Permit B1911377 issued 7/17/2019; construction mostly complete 10/30 1855 Wisconsin Avenue NW Thread FL Clearwater US-19 8 In permitting 9/23/2019; under construction 11/5; awaiting cabinets and transformer 11/14; transformer installed 1/23/2020; operational 2/17 2/17/2020 Wawa, 26508 US Highway 19 Thread FL Deerfield Beach US-19 8 Construction mostly complete 12/23 Wawa, 20 SW 12th Avenue Thread FL Fort Lauderdale I-95 8 Permit issued 8/27/2019 2620 West Broward Blvd Thread FL Kissimmee US-192 8 Permit P19-001977 submitted for review 2/14/2019; permit issued 6/6; transformer installed while construction continues 9/5; cabinets delivered 12/7; pedestals installed 12/27; operational 1/13/2020 1/13/2020 Wawa, 7940 West Irlo Bronson Memorial Highway Thread FL Miami - SW 24th Street FL-826 8 Construction complete and meter energized 10/17/2019, awaiting testing; operational 1/30/2020 1/30/2020 Wawa, 6971 SW 24th Street Thread FL Miami - Wynwood I-95 10 Tesla reportedly negotiating lease as of 7/25/2017 Midtown Mall, 3401 N Miami Avenue? Thread FL Ochopee I-75 8 Under construction as of 10/29/2019; transformer installed 1/5/2020; pedestals installed 2/3; operational 2/14 2/14/2020 I-75 Miccosukee Service Plaza Thread FL Palm Coast I-95 8 Superchargers to be installed at new Wawa as of 1/31/2020 Bulldog Drive & State Road 100 Thread GA Sandy Springs I-285 12 Reportedly coming as of 9/14/2018 Prado Shopping Center, 5600 Roswell Road? Thread IA Sioux City I-29 8 Project approved by city as of 7/19/2019 Hy-Vee, 4500 Sergeant Road Thread IA Waterloo I-380/US-20 8 Store manager says construction will start soon as of 2/16/2020 Hy-Vee, 1422 Flamang Drive Thread ID Burley I-84 8 Tesla in site selection talks with mall management as of 10/31/2018 near Rue 21, 5th St east of Overland Ave Thread IL Chicago - Lincoln Park US-41 6 Site has apparently been chosen as of 6/18/2017 near North and Clyburn Thread IL Chicago - O'Hare I-90 14 Under construction 11/19/2019; awaiting transformer 1/13/2020 10909 West Higgins Road Thread IL Flossmoor I-57 10 Conditionally approved by Plan Commission 3/21/2019 Meijer, 2301 Markland Avenue Thread IL Northbrook I-94 8 Under construction 2/2/2020 840 Willow Road Thread IN Bloomington I-69 8 Under construction 11/26/2019; transformer installed while construction continues 12/27 3600 West Third Street Thread IN Kokomo US-31 10 Under construction 11/19/2019 Meijer, 3800 Vollmer Road Thread IN Michigan City I-94 8 Under construction 11/27/2019 Meijer, 5150 Franklin Street Thread IN Richmond I-70 8 Under construction 2/2/2020 2507 Chester Blvd Thread KS Emporia I-35 8 Agreement in place with site as of 6/6/2017; permit approved at new site 9/30/2019; under construction 11/11 1330 Industrial Road Thread KY Florence I-71/I-75 8 Under construction 12/5/2019 4990 Houston Road Thread LA Covington LA-21 8 Utility survey requested as of 12/30/2018 River Chase Shopping Center Thread LA Lafayette I-10 8 Utility survey requested as of 12/30/2018; plans reportedly confirmed from Tesla document 4/1/2019; under construction 10/11; cabinets delivered 1/15/2020 Stirling Center, I-10 at Louisiana Avenue Thread MA Beverly YDH 10 Approved by Planning Board 12/19/2017; Permit submitted 7/16/2018, issued 8/19 55 Dodge Street Thread MA Chestnut Hill MA-9 8 Under construction 8/25/2019; pedestals delivered 11/28; transformer installed 12/8; awaiting power on / testing 12/19; semi-operational 1/12/2020 1/12/2020 55 Boylston Street Thread MA Hyannis US-6 12 Permit issued 4/8/2019 Stop & Shop, 425 Attucks Lane Thread MA Orleans US-6 8 Orleans Conservation Commission approved administrative review 1/8/2019; under construction 7/4; pedestals installed 11/21; operational 12/7 12/7/2019 Stop & Shop, 10 Route 6A Thread MA Seekonk I-195 12 Application filed with Planning Board 11/1/2017 101 Commerce Way Thread MA Wareham I-195 12 Plans submitted to planning department as of 12/25/2017; approved by zoning board 2/17/2018; under construction 10/3/2019; transformer installed while construction continues 12/7; operational 1/15/2020 1/15/2020 Wareham Crossing, 2421 Cranberry Highway Thread MA Woburn I-95/I-93 8 Petition to city council 10/17/2017; referred to public hearing 11/21; 369 Washington Street Thread MD Baltimore - Canton Crossing I-95 12 Request for pavement markings submitted as of 7/16/2019 3779 Boston Street Thread MD Beltsville I-95 8 Variance sought with planning board as of 10/28/2018 Wawa, 2324, 10515 Baltimore Avenue Thread MD Bethesda - Montgomery Mall East I-495/I-270 12 Plans to build 2 supercharger sites within the mall as of 2/5/2018 Montgomery Mall Nordstrom Garage Thread MD Bethesda - Montgomery Mall West I-495/I-270 12 Plans to build 2 supercharger sites within the mall as of 2/5/2018 Montgomery Mall Arc Light Cinema Garage Thread MD Easton US-50 8 Request for pavement markings submitted as of 7/16/2019 7655 Ocean Gateway Thread MD Halethorpe I-95/I-695 8 Development Review Committee approved B-2 exception 11/28/2017 Wawa, 3716 Washington Blvd Thread MD North Bethesda I-270 8 Permit 879072 applied for 6/12/2019; under construction 11/23; operational 1/28/2020 Parking Garage, 11860 Trade Street Thread MD Ocean City US-50 8 Operational 1/25/2020 30 Maryland Avenue Thread MD Rockville I-270 8 Call for pre-construction pavement markings 9/13/2019; under construction 9/27; awaiting pedestals 11/6; equipment delivered 1/23/2020 12826 Ocean Gateway Thread ME Bethel US-2 6 Plan approved by Planning Board 9/26/2018 211 Mayville Road Thread ME Skowhegan US-2 8 Proposal discussed at Selectmen's meeting 10/9/2018; discussed at Planning Meeting 5/1/2019; under construction 10/12; awaiting power on / testing 11/19; operational 12/31/2019 12/31/2019 Hannaford, 496 Madison Avenue Thread MI Escanaba US-2 10 Special land use permit granted by planning commission 2/9/2018; building permit issued 9/24 Meijer, 505 North 26th Street Thread MI Mackinaw City I-75 8 Permit for "Tesla charging station" dated 5/9/2019; under construction 10/8/2019 Meijer, 505 North 26th Street Thread MI Marquette US-41 8 Plan before Planning Commission 6/26/2019; confirmed in permitting 12/19 Meijer, 3630 US-41 Thread MI Sault Sainte Marie I-75 8 Tesla property tax records found for supercharger site at Meijer gas station address 2/2019 Meijer, 1138 West 3 Mile Road Thread MI Swartz Creek I-69 10 City manager says the location has been chosen. as of 3/16/2018; under construction 4/13; transformer installed 5/7; pedestals installed 11/12, awaiting power on / testing; operational 1/28/2020 1/29/2020 Meijer, 4141 Morrish Road Thread MN Alexandria I-94 Tesla says coming in 2017 as of 10/10/2016; utility markings requested 3/20/2018; conditional use permit approved 9/24; pre-construction call for pavement markings 9/19/2019; under construction 9/22; pedestals installed 2/4/2020; operational 2/14 2/14/2020 Target, 4404 MN-29 Thread MN Minneapolis I-35W 6 Approved permit for soil disturbance 01/11/2019 Target, 1600 New Brighton Blvd. Thread MN St. Louis Park MN-100 6 Call for pre-construction pavement markings 9/19/2019, under construction 10/3; transformer installed while construction continues 11/11; awaiting pedestals 12/28 Target, 3601 State Highway 100 Thread MT Glendive I-94 8 Permit 2019-ECON-00681 issued 6/4/2019; under construction 10/5 1919 North Merrill Avenue Thread MT Great Falls I-15 8 Call for pre-construction pavement markings 7/16/2019; awaiting pedestals and cabinets 12/27 2301 14th Street SW Thread MT Helena I-15 8 Under construction 10/27/2019; transformer installed 12/1 3120 Queen Anns Street Thread MT Miles City I-94 8 Call for pre-construction pavement markings 10/8/2019; under construction 10/28; transformer installed while construction continues 11/18 1815 South Haynes Avenue Thread MT Shelby I-15 8 Agreement with city to install supercharger on City lot 11/4/2019 441 11th Avenue N Thread ND Bismarck I-94 6 In permitting 2/22/2019; under construction 9/9; transformer installed while construction continues 9/25 999 West Century Avenue Thread ND Dickinson I-94 8 Site agreement in progress as of 12/12/2017; permit approved ~5/8/2018; construction starting 8/29; awaiting pedestals and cabinets 9/11 Thread ND Fargo I-94 8 Tesla reportedly looking for site as of 6/30/2016; request for pavement markings 3/30/2018; ; request for pavement markings for design purpose at new site 6/19/2019; pre-construction call for pavement markings 10/2; construction beginning 10/17; transformer installed but awaitin pedestals 11/14 West Acres Regional Shopping Center, 3903 13th Avenue S? 5680 23rd Avenue South Thread ND Grand Forks I-29 8 Utility survey requested for design purposes as of 7/17/2019 3601 32nd Avenue South Thread ND Jamestown I-94 8 Tesla in negotiations with mall management for several months as of 4/10/2019; under constructon 11/23 Buffalo Mall, 2400 8th Avenue SW Thread ND Pembina I-29 8 request for pavement markings 3/30/2018 700 West Stutsman Street Thread NH North Conway US-302 8 In presentation from Irving on upcoming superchargers 8/10/2019 Irving, 1500 White Mountain Highway Thread NH Rochester US-202 8 in permitting 11/30/2018; approved by Planning Board 12/3; construction starting 8/29/2019; transformer installed while construction continues 10/10; pedestals installed 10/28; awaiting testing 11/6; operational 12/26 12/26/2019 Hannaford, 290 North Main Street Thread NJ Boonton I-287 8 Under construction 5/30/2019; transformer installed while awaiting pedestals 9/7; pedestals installed 10/18 550 Myrtle Avenue Thread NJ Deptford NJ-42/NJ-55 12 Plans presented to Planning Board 4/4/2018; under construction 6/16/2019; awaiting pedestals 11/7; pedestals installed, awaiting transformer / hookup 12/4 1750 Deptford Center Road Thread NJ Elizabeth NJTP 20 On agenda of Planning Board meeting 5/2/2019;p under construction 2/7/2020 Jersey Gardens Mall, 651 Kapkowski Road Thread NJ Freehold NJ-33 8 On agenda of Planning Board meeting seeking minor site plan approval 8/15/2019 Wawa, 909 NJ-33 Thread NJ Maple Shade I-95 8 Public notice of planned supercharger 6/13/2019; under construction 10/26 2801 Route 73 South Thread NJ Phillipsburg I-78 8 Tesla to present plans to Land Use Board 2/13/2018 Wawa, 1300 Route 22 Thread NJ Springfield I-78 8 Approved by planning board 1/2/2020 Wawa, 697 Morris Turnpike Thread NJ Wall Township NJ-33 8 Site plan approved by Board of Adjustments 9/2018 Wawa, 1310 NJ-34 Thread NV Las Vegas - North Premium Outlets I-15 8 Permit B19-00185 submitted 2/5/2019, revised submission 6/27; submission revised for V3 9/17; permit issued 10/10, re?issued 12/9 Las Vegas North Premium Outlets Thread NY Cheektowaga I-90 8 Under construction 1/18/2020; operational 2/8 2/8/2020 525 Duke Road Thread NY Copiague NY-27 12 Pre-construction call for utility markings 9/5/2019; under construction 9/27; awaiting pedestals 11/7 1147 Sunrise Highway Thread NY Flushing I-678 2 operational 1/28/2020 136-20 38th Avenue Thread NY Manhattan - Vesey Street I-84 2 Operational 1/28/2020 1/28/2020 250 Vesey Street Thread NY Fishkill I-84 12 Announced in Hudson Valley Towne Center press release 12/15/2019; under construction with transformer installed 1/31/2020 18 Westage Drive Thread NY Manorville I-495 10 Site reportedly chosen as of 8/31/2017 Route 111 between CVS and Cumberland Farms? Thread NY Middletown I-84 8 Under construction 4/19/2019; awaiting power on / testing 9/26; operational 9/28 9/28/2019 601 East Main Street Thread NY Oneonta I-87 8 Approved by Planning Board 9/17/2018; under construction 7/19/2019; cabinets delivered 1/15/2020; energized and awaiting testing 1/26/2020; operational 2/7 2/7/2020 Mirabito Fuel Stop, 4968 NY-23 Thread NY Staten Island NY-440 8 Under construction 6/30/2019; transformer installed 8/29; awaiting power on / testing 10/8; operational 12/31 12/31/2019 2925 Veterans Road West Thread PA Bensalem I-276 6 Under construction 10/30/2019; transformer installed 11/16; cabinets and pedestals installed 1/15/2020 3620 Street Road Thread PA Grove City I-79 8 Under construction 12/20/2019; operational 2/6/2020 2/6/2020 1931 Butler Pike Thread PA King of Prussia I-76 8 Site agreement in place as of 12/5/2017 King of Prussia Mall, 160 N Gulph Road Thread PA Lancaster US-30 8 Under construction 2/1/2020 518 Greenfield Road Thread PA Pittsburgh Urban 8 Under construction 12/6/2019; awaiting transformer 12/26 5550 Center Avenue Thread PA Williamsport I-180 8 City zoning administrator has seen plans as of 7/21/2019; under construction 10/30 Sheetz, 105 Maynard Street Thread TN Nashville I-40/I-65 12 Permit issued 6/19/2018 1033 Demonbreun Street Thread TX Boerne I-10 Owner says new Valero station will have superchargers as of 3/19/2018; Tesla called for pavement markings at a different site 6/25/2018 28295 Frontage Road or HEB, 420 West Bandera Road Thread TX Eastland I-20 Tesla called for pavement markings 6/8/2018 Walmart, 1410 East Main Stgreet Thread TX Fairview US-95 Tesla called for pavement markings 12/28/2018 Whole Foods, 101 East Stacy Road Thread TX Fort Worth - Monahans Avenue I-30/I-20 10 Permit application PB18-14402 submitted 11/29/2018 5128 Monahans Avenue Thread TX Houston - Downtown I-10 8 Call for pavement markings 4/11/2018 111 Yale Street Thread TX Katy I-10 Tesla called for pavement markings 6/7/2018; Texas DLR notification says construction to start 9/23/2019; survey stakes in place 1/25/2020 HEB, 25675 Nelson Way Thread TX Leon Springs I-10 10 Tesla called for pavement markings 11/14/2019; under construction 1/8/2020 24165 I-10, San Antonio Thread TX Mesquite I-635/I-30 Tesla called for pavement markings 4/9/2018 Town East Mall? Thread TX Mount Pleasant I-30 Tesla called for pavement markings 4/9/2018 602 South Jefferson Avenue Thread TX Round Rock I-35 Tesla called for pavement markings 4/9/2018 Round Rock Premium Outlets, 4401 North Interstate 35 Thread TX Schertz/Selma I-35 Construction to begin ~9/23/2019 17460 IH 35 N Thread TX Sealy I-10 Site registered for accessibility compliance 11/13 6701 US Highway 90 Thread TX Stafford I-69 Tesla called for pavement markings 4/9/2018 Walmart, 11210 West Airport Blvd Thread TX Vidor I-10 Tesla called for pavement markings 6/13/2018 Walmart, 1360 North Main Street? Thread VA Ashburn VA-267 8 Under construction 12/4/2019 43300 Southern Walk Plaza Thread VA Fairfax I-66 12 Deciding where in parking lot to put site as of 10/4/2017 Fairfax Corner Shopping Center, 11945 Grand Commons Avenue Thread VA Farmville US-460 8 Call for pavement markings 2/18/2020 Sheetz, 2016 South Main Street Thread VA Lynchburg US-29 8 Permit B19-438 approved 6/25/2019; under construction 7/15; transformer installed while construction continues 11/5; operational 2/6/2020 2/6/2020 Sheetz, 14480 Wards Road Thread VA Madison US-29 8 Under construction 7/23/2019; operational 2/7/2020 2/7/2020 Sheetz, 2902 South Seminole Trail Thread VA Tysons I-495 10 Permit application 181630209 submitted 6/12/2018; permit approved 6/26 1961 Chain Bridge Road Thread VA Vienna I-66 8 Permit 191690390 applied for 6/18/2019; under construction 9/26 465 Maple Avenue West Thread WA Bellevue I-405 20 Permit applications 17-125829-BG and 17-125683-BZ submitted 10/10/2017; permit abandoned 4/9/2018; new permit application submitted for new location as of 5/8; permit ready to issue 3/22/2019; permit cancelled 5/8 523 Bellevue Way NE Thread WA Bothell I-405 10 In permitting as of 12/11/2019; under construction 1/28/2020 19128 112th Avenue NE Thread WA Chelan US-97 7 Tesla in discussions with city on site selection as of 9/18/2018 Safeway or behind little corner park? Thread WA Forks US-101 8 Permit 3268195E applied for 9/6/2019; under construction 9/19; awaiting pedestals and cabinets 11/3; pedestals installed and cabinets delievered 1/21/2020 Dew Drop Inn, 100 Fern Hill Road Thread WA Kelso I-5 12 Call for pavement markings 1/8/2020, construction to begin 1/11; under construction 2/16 205 Three Rivers Drive Thread WA Moses Lake I-90 12 Under construction 8/19/2019; awaiting transformer 12/26; operational 1/3/2020 1/3/2020 2709 West Broadway Avenue Thread WA North Bend US-97 7 Tesla in discussions with city on site selection as of 9/18/2018; under construction 9/5/2019; transformer installed while construction continues 10/2; pedestals installed 11/26; passed inspection 12/9; semi-operational 12/12; operational 12/18 12/18/2019 461 South Fork Ave Thread WA Okanogan US-97 8 Tesla says a site is planned here as of 3/31/2017 unknown Thread WA Seattle - Northgate I-5 8 Permit 6722428-CN submitted for review 10/25/2019 401 NE Northgate Way Thread WA Spokane I-90 8 Under construction 7/23/2019; pedestals installed 11/26; operational 12/20 12/20/2019 10506 West Aero Road Thread WA Snoqualmie I-90 8 Mayor said where the location will be 6/26/2017 Safeway? Thread WA Tumwater I-5 12 Permit TUM-18-1347 for equipment enclosure submitted for review 10/30/2018; under construction 10/27/2019; awaiting power on / testing 2/8/2020 2430 93rd Avenue SW Thread WA Vancouver - Vancouver Mall I-5 12 Call for pavement markings 1/8/2020, construction began 1/11 8700 NE Vancouver Mall Drive Thread WI Hudson I-94 8 Reportedly in plan for new Hy-Vee as of 11/3/2019 2351 Coulee Road Thread WY Casper I-25 8 Owner reported signing contract with Tesla for superchargers as of 4/29/2019 Hat Six Travel Center Thread AB Bassano 1 8 Under construction 8/23/2019; cabinets installed 10/10; operational 12/20 12/20/2019 621 12th Street Thread AB Calgary - South 17 12 Reportedly coming as of 12/21/2017 6455 McLeod Trail Thread AB Jasper 17 8 Proposal to use city lot for superchargers before council 12/17/2019 Connaught Drive opposite Robinson's Thread AB Medicine Hat 1 8 Public notice posted for development permit approval of charging station 4/6.2019; public notice of development permit for different site published 5/3 is likely to be supercharger site; City planning department says permit has been issued as of 5/21; under construction 9/5; pedestals installed 10/24; operational 12/20 12/20/2019 1941 Strachan Road SE Thread AB Red Deer - Leva Avenue 2 8 Under construction 10/12/2019; operational 12/20 12/20/2019 179 Leva Avenue Thread AB Strathmore 1 6 Under construction 10/11/2019; transformer installed but no meter while construction continues 10/28; power on, awaiting testing 11/22; operational 12/20 12/20/2019 125F Ranch Market Thread BC Abbotsford 1 12 Under construction 11/27/2019; awaiting pedestals 1/26/2020; pedestals installed 1/31 3122 Mount Lehman Road Thread BC Cache Creek 3 8 City council approved signing contract with Tesla 9/16/2019 1270 Stage Road Thread BC Castlegar 3 9 Canadian Tire announced upcoming superchargers at this site 1/15/2020 2000 Columbia Avenue Thread BC Nakusp 6/23 8 Tesla assessing sites as of 8/26/2019; 200 8th Avenue NW Thread BC Osoyoos 3/97 8 Tesla presented plan to City Council 7/3/2019 8502 74th Avenue Thread BC Richmond Urban 20 Under construction 9/4/2019; awaiting transformer 12/19; operational 1/28/2020 1/28/2020 6060 Minoru Blvd Thread BC Salmon Arm 1 8 SmartCentre spokesperson says coming soon as of 3/14/2018 Smartcentre, 2991 10 Avenue SW? Thread MB Brandon 1 6 Shindico says supercharger construction to begin in fall as of 3/27/2018; under construction 7/19/2019; pedestals delivered 11/7; testing 12/12; operational 12/23 12/23/2019 Corral Centre, 921 18th Street N Thread MB Portage la Prairie 1 6 Shindico says supercharger construction to begin in August as of 3/27/2018; under construction 7/21/2019; transformer installed while construction continues 8/19; pedestals installed 10/27; operational 12/12 12/12/2019 2100 Saskatchewan Avenue Thread MB Prawda 1 6 Special accessory use approved by Reynolds council 5/22/2018; under construction 7/29/2019; transformer installed while awaiting Tesla equipment 9/24; operational 12/20 12/20/2019 Shell, Trans-Canada Highway Thread MB Winnipeg 1 12 Site located 11/6/2018; under construction 8/11/2019; transformer installed while construction continues 8/19; awaiting power on / testing 11/7; testing 12/12; semi-operational 12/13 1485 Portage Avenue Thread ON Batchawana Bay 17 4 Under construction 9/3/2019 11028 Highway 17 N Thread ON Blind River 1 6 On September 2017 city council agenda; under construction 9/3/2019; pedestals installed 10/16; transformer installed 11/21; tested 12/7; operational 12/12 12/12/2019 Tourist Information Centre, 453 Trans-Canada Highway Thread ON Brockville 401 12 SmartCentre spokesperson says coming soon as of 3/14/2018 Smartcentre, 1942 Parkedale Avenue W? Thread ON Deep River 1 6 Under construction 6/10/2019; transformer installed 10/28, awaiting power on / testing; operational 12/23 12/23/2019 Canadian Tire, 33277 Highway 17 Thread ON Dryden 17 6 Red River Co-op says agreement with Tesla in place as of 8/8/2019; under construction 10/18; operational 12/20 12/20/2019 Red River Co-op, 640 Government Street Thread ON Baldwin 17 6 Under construction 6/29/2019; awaiting transformer 11/1; operational 12/12 329 Highway 17 Thread ON Bancroft 62 8 Canadian Tire announced upcoming superchargers at this site 1/15/2020 Canadian Tire Thread ON Ignace 1 6 Lease agreement with City began 4/15/2018; under construction 10/18/2019; operational 12/18 12/18/2019 304 Main Street Thread ON Kenora 21 6 Approved by Planning Committee as of 9/5/2019; equipment staged at site 9/26; under construction 10/2; pedestals and equipment delivered 10/23; awaiting transformer / hookup 11/14; transformer/power connected 12/12, undergoing testing; operational 12/20 12/20/2019 Canadian Tire, 1201 Highway 17 E Thread ON Kitchener 85 8 Under construction 10/18/2019 Service Center, 663 Vicgtoria Street N Thread ON Kincardine 21/9 6 Owner of site says Tesla will put superchargers there as of 4/27/2019; construction of some sort at site 9/7; Canadian Tire announced upcoming superchargers at this site 1/15/2020 Canadian Tire, 811 Durham Street? Thread ON London 401 12 Under construction 10/3/2019; awaiting pedestals 11/21 4350 Wellington Road South Thread ON Nepean 3 9 Canadian Tire announced upcoming superchargers at this site 1/15/2020 Canadian TireTD] Thread ON Niagara Falls QEW 12 Under construction 12/26/2019 3770 Montrose Road Thread ON Nipigon 1 6 City council authorized lease agreement with Tesla 2/6/2018; under construction 9/7/2019; operational 12/20 12/20/2019 Tourist Information Centre, 453 Trans-Canada Highway Thread ON North Bay 1/11 8 Under construction 4/16/2019; transformer installed, awaiting pedestals 9/9; pedestals installed 10/12; testing 11/17; semi-operational 12/12; operational 12/18 12/18/2019 unknown Thread ON Renfrew 1 6 On city council agenda 2/2/2018 Tourist Information Centre, 453 Trans-Canada Highway Thread ON Sault Ste Marie 17 6 Under construction 7/9/2019; pedestals delivered 10/5, installed 10/18; tested 12/4; semi-operational 12/12 673 Second Line E Thread ON Terrace Bay 1 6 Lease agreement signed as of 11/26/2018, to go into effect 3/15/2019; under construction 9/3; pedestals installed 10/18; semi-operational 12/17; operational 12/20 12/20/2019 43 Simcoe Plaza Thread ON Thunder Bay 17 6 Awaiting power on / testing 11/3/2019; tested and semi-operational 12/9; operational 12/20 12/20/2019 Canadian Tire, 1221 Arthur Street West Thread ON Upsala 11/17 6 Under construction 11/11/2019; operational 12/21 12/21/2019 Shell, 4810 Highway 17 Thread ON Vaughan 400 8 Minor zoning variance approved 11/1/2018 3600 Major MacKenzie Drive West Thread ON Wawa 17/101 4 Sault Ste Marie contractor says this site is next as of 7/12/2019; under construction 9/3; testing 11/21; operational 12/20 12/20/2019 Swipe, Pump, & Go, 95 Mission Street Thread ON White River 17 6 Under construction 9/3/2019; pedestals installed 10/12, awaiting transformer / hookup; operational 12/20 12/20/2019 XTR, 17 Highway 17 Thread ON Woodbridge 7 12 SmartCentre spokesperson says coming isoon as of 3/14/2018 Smartcentre, 3900 Windflower Gate? Thread QC Chicoutimi/Saguenay 175 8 Under construction 11/13/2019; operational 2/8/2020 2/8/2020 1562 Boulevard Talbot Thread QC Saint-Liboire 116 8 In presentation from Irving on upcoming superchargers 8/10/2019 Irving, 1144 Rang Saint-Édouard Thread QC Terrebonne 40/640 8 City council member says will be installed as of 6/21/2019 1115 Montée des Pionniers Thread SK Davidson 11 6 Tesla has lease agreement as of 8/6/2019; under construction 8/13; transformer installed while construction continues 8/19; pedestals installed 10/20; operational 12/19 12/19/2019 Co-op Gas Bar, 100 North Service Road Thread SK Maple Creek 210 6 Under construction 6/29/2019; pedestals installed 10/12; awaiting power on / testing 11/11; operational 12/19 12/19/2019 106 Sidney Street Thread SK Moose Jaw 1 6 Under construction 6/12/2019; awaiting power on / testing 10/18; operational 12/17 12/17/2019 1251 Main Street N Thread SK Moosomin 1 5 Building permit approved by city council 3/13/2019 Smartcentre, 2150 Prince of Wales Drive Thread SK Regina 1 8 Tesla in site selection process as of 11/3/2017; SmartCentre spokesperson says coming soon as of 3/14/2018; under construction 8/29/2019; pedestals installed 10/3; awaiting transformer / hookup 10/15; operational 12/20 12/20/2019 Canadian Tire, 2325 Prince of Wales Drive Thread SK Swift Current 1 8 Under construction 9/3/2019; pedestals installed 10/19; operational 12/20 12/20/2019 1601 North Service Road Thread SK Whitewood 1 8 Under construction 8/3/2019; awaiting pedestals and cabinets 9/26; pedestals and cabinets installed, awaiting transformer 10/3; semi-operational 12/19; operational 12/20 12/20/2019 1206 Highway 1 Thread Following is an archive of the progress of sites which are now operational: AL Athens I-65 10 Construction complete with transformer installed 5/28/2017; operational 5/31 5/31/2017 Fairfield Inn & Suites, 21282 Athens-Limestone Lane Thread AL Birmingham I-20 8 Sources say coming soon as of 9/1/2016; Permit BLD2016-02367 submitted for review 9/14; Tesla says approaching construction phase 9/26; construction well underway 10/28; awaiting transformer & hookup 11/5; operational 11/16 11/16/2016 Uptown, 2221 Richard Arrington Jr Blvd N Thread AL Mobile I-10/I-65 8 On Coming Soon map released 12/18/2014; permit application submitted 1/26/2015; 1 permit condition still requiring resolution 2/24; under construction 3/20; transformer in place 4/6, power on 4/8; operational 4/16 4/16/2015 3201 Airport Blvd Thread AL Oxford I-20 12 Construction mostly complete 9/22/2017; operational 10/15 10/15/2017 552 Oxford Exchange Blvd Thread AL Steele I-59 8 Under construction 7/8/2017; transformer & meter installed 7/16; operational 8/9 8/9/2017 905 Steele Station Road Thread AR Little Rock I-20 10 Plans submitted for permitting as of 3/2/2017; plans approved and construction out to bid as of 3/15; construction began 4/6; awaiting transformer & hookup 5/9; operational 5/19 5/19/2017 11231 Bass Pro Parkway Thread AZ Page US-89 8 Tesla says under construction as of 9/2/2016; operational 9/10 9/10/2016 Courtyard, 600 Clubhouse Drive Thread AZ Payson AZ-260/AZ-87 12 Permit PY1803-037 applied for 3/21/2018; under construction 11/8; operational 12/28 12/28/2018 201 North Beeline Highway Thread AZ Phoenix I-17/101 16 Permit SE 17029532 issued 10/17/2017; awaiting transformer & hookup 12/17; transformer installed 1/9/2018; operational 3/20 3/20/2018 2805 W Agua Fria Fwy Thread AZ Phoenix-Biltmore Az-51 20 Mall management says construction is imminent as of 1/9/2018; pavement markings 1/21; under construction 2/13; transformer installed 3/22; operational 3/26 3/26/2018 Biltmore Fashion Park, 2442 East Camelback Road Thread AZ Scottsdale Urban 16 Operational 11/21/2017 Scottsdale Quarter parking garage Thread AZ Sedona Urban 14 Under construction 2/10/2018; transformer installed 4/3; testing 4/18; operational 4/22 4/22/2018 7000 AZ-179 Thread AZ Tucson I-10 10 Permit T17CM04231 issued 8/7/2017; under construction 8/20; transformer installed 10/10; power on, awaiting testing 10/13; operational 10/14 10/14/2017 Minute Mart, 9255 South Rita Road Thread AZ Tucson - La Encantada AZ-77 12 Permit application P17BP06312 submitted 10/11/2017; under construction 2/12/2018; transformer installed 4/17; connected to grid 4/26, awaiting testing; operational 4/28 4/28/2018 La Encantada Mall, 2905 East Skyline Drive Thread AZ Tusayan AS-64 12 Construction mostly complete 7/1/2019; operational 10/24 10/24/2019 Grand Hotel, 149 AZ-64 Thread AZ Willcox I-10 8 Site selected as of 7/19/2017; plans approved and construction imminent as of 9/29; under construction 10/14; transformer installed 12/6 12/13/2017 Holiday Inn Express, 1251 Virginia Avenue Thread CA Alameda Urban 12 Permit E18-0211 submitted for review 5/14/2018 Construction started on 10/8/18; transformer installed while construction continues 11/26; operational 12/14 12/14/2018 523 South Shore Center Thread CA Anaheim Hills CA-91 14 Permit BLD2018-03898 applied for 8/24/2018; permit issued & construction began 3/4/2019; transformer installed 5/1; operational 5/15 5/15/2019 8148 East Santa Ana Canyon Road Thread CA Antioch CA-4 12 Permit application under review 9/18/2018; construction starting 2/11/2019; awaiting transformer 2/26; operational 3/20 3/20/2019 Target, 5769 Lone Tree Way Thread CA Baker I-15 40 Permits B201705449 through B201705453 applied for 7/13/2017; under construction 9/1; operational 11/21 11/21/2017 71808 Baker Blvd Thread CA Bakersfield I-5 10 Permit applications for electrical and enclosure submitted 3/2/2016; found under construction 8/14; operational 9/29 9/29/2016 Shell, 29541 Stockdale Highway Thread CA Big Sur CA-1 8 Permit application 18CP02080 submitted 8/15/2018, approved and ready to issue 11/26; permit issued 3/28/2019; under construction 4/4; awaiting transformer 5/7; operational 5/24 5/24/2019 Ventana Big Sur Resort, 48123 Highway 1 Thread CA Buena Park I-5/CA-91 8 Under construction 5/16/2016; transformer installed 10/15; operational 10/19 10/19/2016 Service Center, 6692 Auto Center Drive Thread CA Burbank I-5 6 Under construction 8/19/2015; operational 12/15 12/15/2015 Service Center, 811 South San Fernando Blvd. Thread CA Burbank #2 I-5 20 Under construction 6/29/2017; operational 9/14 9/14/2017 501 North Third Street Thread CA Buttonwillow I-5 10 Sources say coming as of 10/12/2015; Kern County permit #K201508122 applied for 10/21; permits issued 12/15; under construction 12/28; awating transformer and hookup 1/22/2016; transformer installed 1/24; connected to grid 1/27; operational 1/29 1/29/2016 Starbucks / Subway, 20673 Tracy Avenue Thread CA Carlsbad - La Costa I-5 26 permit CBC2017-0600 applied for 11/14; construction began 4/18/2018; operational 9/28 9/28/2018 7710 El Camino Real Thread CA Chico CA-99 14 Permit 18-02934 applied for 8/29/2018; under construction 2/20/2019; transformer installed 5/29; operational 6/19 6/19/2019 1951 East 20th Street Thread CA Concord I-680 19 Permit B172071 applied for 6/23/2017, building review approved 6/30, planning still under review (?) as of 8/26; under construction 10/16; awaitng testing 2/23; operational 3/1 3/1/2018 Veranda Shopping Center, 2001 Diamond Blvd Thread CA Corona I-15 14 Permit 18-01949 applied for 6/25/2018; permit approved & issued 1/16/2019; construction complete 3/29, awaiting transformer / hookup; operational 3/30 3/30/2019 Target, 2615 Tuscany Street Thread CA Corte Madera US-101 10 Planning application filed January 2015, approved 4/30/2018; building permit BL-2018-0167 applied for 4/6/2018, approved 9/19, issued 10/1; under construction 10/21; operational 2/12/2019 1618 Redwood Highway Thread CA Crescent City US-101 8 Lease agreement on city council agenda for 4/6/2015; application 118-070-25 / projects UP15-10 & AR15-11 approved by planning commission 12/10; construction began 7/25/2016; construction complete with transformer in place 9/5; operational 9/8 9/8/2016 Front & K Streets Thread CA Cupertino I-280 10 Permit B-2017-1539 applied for 9/11/2017, issued by 10/31; operational 3/28/2018 3/28/2018 19500 Vallco Parkway Thread CA Daly City I-280 40 Construction starting 8/14/2018; operational 10/5 10/5/2018 Serramonte Center Thread CA Downey - Lakewood Blvd I-5 10 Under construction 1/21/2018; transformer installed 5/23; operational 5/24 5/24/2018 9588 Lakewood Blvd Thread CA Downey - Stonewood Street I-5 10 Construction mostly done, awaiting transformer 6/12/2018 251 Stonewood Street Thread CA Dublin I-580/I-680 10 In permitting with the City of Dublin 5/29/2015; under construction 7/18; supercharger can't open until mid-Sept because of 30-day notice required to neighbors of scheduled power outage to connect transformer to the grid; transformer installed 10/5; operational 10/16 10/16/2015 Service Center, 6701 Amador Plaza Road Thread CA East Palo Alto US-101 16 Tesla reportedly in discussions for a site as of 4/19/2018; under construction 5/19; awaiting transformer & hookup 6/5; transformer installed 6/21; provisionally operational 6/29 Ravenswood Shopping Center Thread CA Eureka US-101 8 Permit application submitted ~10/30; coastal development permit under review as of 11/9; building permit B15-0852 submitted for review 11/23; permit B15-0852 approved 1/25/2016; construction underway 6/30/2016; transformer installed 7/24; power to be connected 8/9; operational 8/16 8/16/2016 Bayshore Mall, 3300 Broadway Thread CA Fairfield I-80 12 Permit BLD2017-02121 applied for 11/7/2017; construction well underway 3/6/2018; operational 5/5 5/5/2018 Solano Town Center, 1350 Travis Blvd. Thread CA Fairfield - Holiday Lane I-80 10 Permit BLD17-02330 applied for 12/17/2017; permit approved 2/6/2019; under construction 4/1/2019; awaiting transformer & hookup 4/17; operational 5/10 5/10/2019 1350 Holiday Lane Thread CA Fish Camp CA-41 8 Found with construction complete 11/21/2016, awaiting transformer & hookup; operational 12/15 12/15/2016 Tenaya Lodge, 1122 California Highway 41 Thread CA Folsom #2 US-50 10 Under construction 6/24/2016; awaiting transformer & hookup 7/12; operational 8/11 8/11/2016 Parking Garage, 370 Palladio Parkway Thread CA Fontana I-210 23 Construction mostly done 4/13/2018; transformer installed 3/26/2019; operational 3/29 3/29/2019 Falcon Ridge Town Center, 15234 Summit Avenue Thread CA Fountain Valley I-405 8 Discovered under construction 7/7/2015; transformer installed 8/10; operational 8/25; temporarily closed 8/26; operational 8/28 8/28/2015 17940 Newhope Street Thread CA Fremont (Fremont Hub) I-880 12 Under construction 11/19/2017; transformer installed 12/20; operational 4/27/2018 4/27/2018 39201 Fremont Blvd Thread CA Fremont (Kato Road) I-880 20 Under construction 10/22/2015, later abandoned 47400 Kato Road Thread CA Fresno CA-99 10 Tesla is "Coming Soon" to the Marketplace at El Paseo - footprint indicates that it is likely the supercharger; construction started ~11/20/2015; awaiting transformer / hookup 1/5/2016; transformer installed 1/9; operational 1/29 1/29/2016 The Marketplace at El Paseo (~6611 North Riverside Ave) Thread CA Glendale I-5/CA-134/CA-2 20 Mall manager claims one is being installed here as of 1/8/2018; construction well underway 3/20/2018; operational 3/29 3/29/2018 889 Americana Way Thread CA Groveland CA-120 7 Tuolumne County board of supervisors voted 3-0 to pursue a lease agreement with Tesla 3/1/2016; building permit application B2016-00814 submitted 7/20; Planning review approved 7/25 with Building review still pending; equipment staged on site 9/22; under construction 9/24; operational 12/15 11880 Ponderosa Lane Thread CA Gustine I-5 12 Permit BP2016-0990 applied for 5/12/2016; permit approved 8/5; permit issued 9/9, found under construction 10/4; awaiting transformer & hookup 10/17; transformer installed 11/2; meter installed 11/10; operational 11/15 11/15/2016 Andersen's Split Pea Soup, 12411 CA Highway 33, Gustine Thread CA Hayward I-880 14 Under construction 4/9/2019; awaiting transformer & hookup 4/27; transformer installed 5/30; operational 6/22 6/22/2019 Target, 19661 Hesperian Blvd Thread CA Hollister CA-152 18 Construction mostly complete as of 12/13/2017; awaiting transformer & hookup 12/20; transformer installed 1/26/2018; operational 3/12 3/12/2018 Casa de Fruta, 10021 Pacheco Pass Highway Thread CA Inyokern US-395 4 Kern County permit K2014-06075 approved 12/19/2014; permit issued 12/30; under construction 1/7/2015; operational 3/20/2015 3/20/2015 1353 Brown Road Thread CA Irvine - Michelson Drive Street I-405 24 Permit 00787714-CPKM applied for 5/31/2019, issued 7/23; under construction 8/7; awaiting transformer / hookup 9/24; operational 10/19 10/19/2019 3021 Michelson Drive Thread CA Kettleman City I-5 40 Plans revealed 7/11/2017; under construction 9/17; operational 11/15 11/15/2017 33360 Powers Drive Thread CA Lake Elsinore I-15 16 Under construction 11/11/2017; operational 2/28/2018 2/28/2018 Outlets, 17600 Collier Avenue Thread CA Laytonville US-101 8 Permit applied for 10/18/2017; under construction 1/30/2019; operational 6/29 6/29/2019 45020 Highway 101 Thread CA Livermore I-580 20 Permit CM180049 applied for as of 5/27/2018; under construction 10/5; operational 11/22 11/22/2018 2774 Livermore Outlets Drive Thread CA Los Angeles - Francisco Street CA-110 10 operational 3/6/2019 3/6/2019 899 Francisco Street Thread CA Los Gatos CA-17 8 Staff report approved by town council 12/19/2017; permit E18-013 application submitted 1/29/2018; permit approved 4/3; under construction 4/27; awaiting transformer 5/25; transformer installed 9/17; testing 9/19; open 9/24/2018 142 Saratoga-Los Gatos Road Thread CA Malibu CA-1 5 Operational 6/13/2019 6/13/2019 23401 Civic Center Way Thread CA Mammoth Lakes US-395 8 Approved by town council 9/16/2015; under construction 12/10; operational 1/20/2016 1/20/2016 Park-and-Ride Lot, 106 Old Mammoth Road Thread CA Manhattan Beach I-405 12 Construction mostly done 12/1/2018; operational 12/6 12/6/2018 3200 North Sepulveda Blvd Thread CA Menifee I-15 14 Plan approved as of 6/14/2019; under construction 6/25; transformer installed but awaiting pedestals; pedestals installed 9/16; operational 9/30 9/30/2019 Target, 30340 Haun Road Thread CA Menlo Park I-280 10 Permit 2018-0562 issued 4/3/2019; under construction 5/25; transformer installed 8/18; operational 11/21 11/21/2019 325 Sharon Park Drive Thread CA Milpitas I-680 16 Permit B-EL 18-0032 application submitted 1/19/2018; issued 2/1; transformer installed while construction continues 9/14; operational 11/15 11/15/2018 Embassy Suites, 901 East Calaveras Blvd Thread CA Milpitas - Great Mall I-880 20 Permit B-BP18-0351 application filed 7/18/2018, approved 12/11/2018, issued 1/25/2019; construction well underway 3/18; transformer installed 7/21; operational 9/20 9/20/2019 1234 Great Mall Drive Thread CA Mojave CA-14 6 Permit recommended for conditional approval by Kern County Planning Department 12/18/2014; pavement markings seen 2/4/2015; to be tested 3/27; operational 3/27 3/27/2015 near Anthony's Grill, 16940 California 14 Thread CA Monterey CA-1 10 Under construction mid-June 2017; mostly complete 7/11; transformer installed 7/29; operational 8/10 8/10/2017 1410 Del Monte Center Thread CA Morgan Hill CA-101 14 Permit BCOM2018-0150 applied for 9/14/2018, approved 9/25, issued 7/17/2019; under construction 7/24; transformer installed 9/26; operational 10/24 10/24/2019 1061 Cochrane Road Thread CA Mountain View US-101 12 Construction mostly complete 5/25/2015; transformer installed 5/26; failed inspection 5/29; passed inspection 6/3; operational 6/9 6/9/2015 Computer History Museum, 1401 North Shoreline Blvd Thread CA Mount Shasta II I-5 16 Under construction 10/9/2017; operational 1/4/2018 1/4/2018 134 Morgan Way Thread CA Napa 8 Napa County permit P14-00339 in process as of 12/21/2014; part of larger development to be completed by end of 2015; Lake Charles / West Wendover contractor won bid for construction as of 1/18/2015; construction in general area began late June; supercharger under construction 9/17; awaiting paving and transformer 11/30; operational 7/9 7/9/2016 Devlin Road & Airport Blvd Thread CA Napa - Factory Stores Drive CA-29 16 Under construction 7/9/2019; operational 11/16 11/16/2019 Premium Outlets, 629 Factory Stores Drive Thread CA Newark I-880 16 Construction complete, awaiting transformer 11/10/2018; transformer installed 7/29/2019; operational 9/19 9/19/2019 Lazy Dog, 3100 Newpark Mall Thread CA Ojai CA-33/CA-150 12 Approved by city council 12/5; building permit OJ19-053 issued 4/4/2019; construction starting 5/1; operational 7/22 7/22/2019 987 West Ojai Avenue Thread CA Palm Springs CA-111 12 Plan approved by city council 9/20/2018; operational 6/19/2019 6/19/2019 North Museum Drive at North Belardo Road Thread CA Palo Alto US-101/I-280 20 Under construction 7/1/2019; operational 11/5 11/5/2019 660 Stanford Shopping Center Thread CA Pasadena I-210 24 Municipal Service Committee recommended plan to City Council on 2/26/2019, Council voted to proceed; approved by city council 3/11; permit approved 7/15; construction starting 9/4; operational 11/26 11/26/2019 155 East Green Street, top level Thread CA Placerville US-50 6 Tesla in negotiations for a site as of 10/13/2015; lease contract signed as of 11/3; plans abandoned as of 7/8/2016; operational 8/31/2019 8/31/2019 3093 Spanish Ravine Road Thread CA Pleasanton I-580/I-680 10 Permit application B18-2778 submitted 10/11/2018; permit issued 1/23/2019; under construction 2/25; awaiting transformer & hookup 4/27; operational 4/30 4/30/2019 North Museum Drive at North Belardo Road Thread CA Rancho Mirage I-10 22 Reported to be in process by the planning department as of 4/9/2019; under construction 6/11; operational 9/18 9/18/2019 The River Shopping Center Thread CA Red Bluff I-5 8 Operational 11/26/2019 11/26/2019 94 Belle Mill Road Thread CA Richmond I-580 11 Permit B18-03359 applied for 12/6/2018; under construction 4/25; awaiting transformer 9/7; operational 9/16 9/16/2019 2157 Meeker Avenue Thread CA Riverside I-215/CA-60/CA-91 24 Permit issued 10/27/2017; construction beginning 11/4; transformer installed 12/20; operational 12/28 12/28/2017 3878 Market Street Thread CA Rohnert Park US-101 12 Under construction 3/10/2019; awating transformer / hookup 4/30/2019; operational 5/9 5/9/2019 Target, 475 Rohnert Park Expwy Thread CA Sacramento I-5 10 Tesla says in site selection as of 3/1/2017; permit application DR17-143 submitted for plan review 4/11; under construction 7/27; operational 10/13 10/13/2017 Promenade Shopping Center, 3668 North Freeway Blvd Thread CA Sacramento - Arden Fair I-80 Business 20 Plans seen 2/9/2018; permit issued 4/11; awaiting transformer 6/18; transformer installed 6/26; operational 8/11 8/11/2018 Arden Fair Mall, 1689 Arden Way Thread CA Salinas US-101 16 Construction started 8/11/2017; transformer installed and connected to the grid 10/9; operational 10/13 10/13/2017 Harden Ranch Mall, east of North Main St. at San Juan Grade Road Thread CA San Bernardino I-215 12 Construction mostly complete 4/19/2018; transformer installed 6/5; operational 6/6 6/6/2018 400 Inland Center Drive Thread CA San Clemente I-5 10 Permit B17-1210 applied for 7/20/2017; permit approved 9/18; equipment staged on site 9/23; final inspection 11/16, awaiting power on / testing; operational 11/17 11/17/2017 Parking garage at Outlets at San Clemente, 99 West Avenida Vista Hermosa Thread CA San Diego I-5/I-805 12 Tesla reported that "permits have been pulled" 10/23/2014; construction site found 12/15/2014 in early stages; construction complete with transformer installed 5/11; energized 5/22 but access is blocked; accessible for charging 6/8 6/8/2015 10105 Pacific Heights Blvd. Thread CA San Diego - Camino del Sur I-15 15 Permit application for Project 581515 submitted 10/26/2017; permit approved 1/22/2018; under construction 10/4; awaiting transformer & hookup 12/4; transformer installed 1/3/2019; operational 1/11 1/11/2019 17170 Camino del Sur Thread CA San Diego - Del Mar Heights Road I-5 12 In permitting 12/13/2018; permit issued 1/10/2019; under construction 1/21; transformer installed 5/7; operational 5/19 5/19/2019 Del Mar Heights Road Thread CA San Francisco - Letterman Drive US-101 6 Operational 5/22/2019 5/22/2019 Truby Street Thread CA San Jose - Blossom Hill Road CA-85 18 Under construction 1/21/2019; awaiting transformer & hookup 1/30; operational 5/16 5/16/2019 1375 Blossom Hill Road Thread CA San Jose - Cherry Ave CA-85 24 Permit AD18-561 applied for 6/7/2018; under construction 8/31; awaiting transformer / hookup 10/2; transformer installed 10/26; operational 12/21 12/21/2018 5160 Cherry Avenue Thread CA San Luis Obispo US-101 10 Tesla says coming in early 2018 as of 11/29/2017; under construction 2/12/2018; operational 5/5 5/5/2018 Madonna Inn, 100 Madonna Road Thread CA San Mateo US-101 8 Sources say a supercharger is coming here as of 2/18/2015; equipment on site 5/18; testing 6/25; operational 7/9 7/9/2015 1200 Park Place Thread CA San Mateo (Bridgepointe) US-101/CA-92 10 Construction mostly complete 10/29/2017; awaiting inspection & power on 10/31; operational 11/1 11/1/2017 Target, 2220 Bridgepointe Parkway Thread CA San Ramon - Diablo Plaza I-680 20 Architectural Review application AR 18 200-037 submitted 7/10/2018; under construction 12/6; awaiting transformer & hookup 1/30/2019; transformer installed 3/24; operational 4/5 4/5/2019 2415 San Ramon Valley Blvd Thread CA Santa Ana I-5 12 Permit application submitted 2/16/2016; construction began 8/5; awaiting transformer & hookup 10/4; transformer installed 11/19; operational 12/5 12/5/2016 Mainplace Mall, 2800 North Main Thread CA San Carlos US-101 12 Permit MEP2017-00147 applied for 3/28/2018, approved 4/4; permit issued 5/3; under construction 6/4; transformer to be installed 6/21; provisionally open 6/29 6/29/2018 1127 Industrial Road Thread CA Santa Clarita I-5 24 Plans submitted for review 8/3/2017; under construction 1/20/2018; operational 4/5 4/5/2018 Bridgeport Marketplace, 23975 Newhall Ranch Road Thread CA San Diego - Downtown I-5 16 Project 581651 building and electrical permits application submitted 10/26/2017; under construction 3/31/2018; transformer installed 4/15; operational 6/27 6/27/2018 Parking Palace, 1350 6th Avenue Thread CA San Diego - Friars Road I-8 24 Permit application submitted 9/28/2018; permit approved 10/22; under construction 12/1; transformer installed 12/13; operational 1/31/2019 1/31/2019 7007 Friars Road Thread CA San Jose - Coleman Ave CA-87 10 Planning application AD17-1270 submited 12/19/2017; building permit application 2017 036784 CI pending as of 3/3/2018; under construction 6/4; operational 8/31 8/31/2018 Target, 533 Coleman Avenue Thread CA San Jose - Santana Row CA-85 28 Under construction 11/8/2018; operational 2/1/2019 2/1/2019 Parking garage, 330 Winchester Blvd Thread CA San Ramon I-680 10 Development Plan amendment requested 1/29/2018; planning approved 4/30; under construction 6/29; transformer installed 8/22, awaiting power on / testing; operational 8/30 8/30/2018 Target, 2610 Bishop Drive Thread CA Santa Monica - Santa Monica Place CA-1/I-10 10 Permit application 18BLD-6064 submitted for review 5/14/2018; under construction 11/21; operational 2/19 2/19/2019 395 Santa Monica Place Thread CA Seaside CA-1 6 Store / service center / superchargers under construction as of 6/11/2015; testing 8/11; operational 8/13 8/13/2015 Store / Service Center, 1901 Del Monte Blvd Thread CA Sunnyvale US-101/CA-85/CA-237 24 Construction beginning 11/11/2017; transformer installed 1/30/2018; connected to power 2/5; operational 3/12 3/12/2018 Target, 1298 West McKinley Avenue Thread CA Tahoe City CA-89 6 Permit BP18-1883 submitted 12/2/2018, approved 12/9/2018, issued 7/11/2019; under construction 7/29; awaiting transformer / hookup 10/7; transformer installed 10/10; meter installed 10/17, awaiting power on / testing; operational 11/15 11/15/2019 140 North Lake Blvd Thread CA Temecula I-15 10 Sources say coming soon as of 11/2/2015; under construction 3/21/2016; awaiting transformer and hookup 4/12; operational 5/10 5/10/2016 40780 Ring Road Thread CA Thousand Oaks - East US-101 18 under construction 11/19/2017; transformer installed 3/3/2018; testing 3/20; operational 3/21 3/21/2018 Promenade, 180 Promenade Way Thread CA Thousand Oaks - West Hillcrest Drive US-101 20 Permit 17-00004489 submitted 11/13/2017, approved and issued 1/19/2018; under construction 2/24; awaiting transformer 6/13/2018; operational 8/8 8/8/2018 The Oaks, 350 West Hillcrest Drive Thread CA Truckee II CA-267 8 Found under construction 10/7; Commercial Remodel permit #TI 2015-00000785; operational 10/23/2015 10/23/2015 Fifty Fifty Brewery, 11197 Brockway Blvd Thread CA Twentynine Palms CA-62 8 Operational 12/8/2016 12/8/2016 73829 Baseline Road CA Ukiah US-101 8 Approved by city council 8/7/2015; Construction started ~12/8; operational 1/13/2016 1/13/2016 Thread CA Vallejo I-80 16 Permit BP18-1883 submitted 12/2/2018, approved 12/9/2018; construction starting 4/4/2019; operational 6/21 6/21/2019 Target, 904 Admiral Callaghan Lane Thread CA Walnut Creek I-680 12 Construction complete, awaiting transformer 10/12/2019; transformer installed 10/16; operational 10/24 10/24/2019 Top level of parking garage, 1250 South California Blvd Thread CA Watsonville CA-1 14 Under construction 5/11/2019; awaiting transformer 5/29; operational 7/25 7/25/2019 `415 Main Street Thread CA Yermo I-15 18 San Bernardino County permit application B201703979 filed 5/31/2017; under construction 8/21; operational 11/22 11/22/2017 Eddie World, 36017 Calico Road Thread CA Yuba City CA-99 10 Permit BLD18-01391 ready to issue as of 11/25/2018; under construction 12/6; awaiting transformer 1/29/2019; operational 2/5 2/5/2019 1475 Tharp Road Thread CO Aspen CO-82 8 Operational 7/2/2018 7/2/2018 38750 Highway 82 Thread CO Boulder US-36 10 In permitting 12/10/2017; initial review required changes 2/2/2018; permit approved 3/8; under construction 3/29; transformer installed 5/24; operational 5/30 5/30/2018 1805 29th Street Thread CO Brush I-76 8 Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016, Tesla says proceeding with site 11/9; under construction 12/10; construction mostly complete with transformer installed 12/22; operational 12/31 12/31/2016 Tomahawk Brush Travel Stop, 1156 Colorado Avenue Thread CO Colorado Springs I-25 8 Sources say coming soon as of 10/12/2015; suspected supercharger plans sumitted for review 10/14; under construction 12/7; energized and testing 12/23; operational 12/29 12/29/2015 215 North Cascade Ave Thread CO Estes Park US-34 7 Construction complete, awaiting transformer 4/29/2018; transformer installed 5/12; operational 5/15 5/15/2018 Stanley Hotel, 333 East Wonderview Avenue Thread CO Lone Tree II I-25 16 Under construction 10//2017; operational 11/17 Park Meadows Center Drive Thread CO Loveland I-25 8 Found in early stage of construction 10/30/2016, transformer installed 12/14; operational 12/28 12/28/2016 Embassy Suites, 4705 Clydesdale Parkway Thread CO Poncha Springs US-285/US-50 6 Plans submitted for review 10/3/2017; under construction 11/3; awaiting transformer & hookup 1/22/2018; transformer installed 1/26/2018; awaiting testing 1/31; operational 2/2 2/2/2018 High Valley Center, 6250 US-285 Thread CO Trinidad I-25 6 On "Coming Soon" map updated 12/18/2014; permit application being processed 2/17/2015; permit process to be restarted as of 5/15; construction reportedly underway 7/13; operational 7/29 7/28/2015 9700 Santa Fe Trail Thread CT Danbury I-84 20 Contractor says coming soon as of 2/28/2017; under construction 7/21/2017; awaiting transformer and meter 9/15; transformer installed 9/21; operational 5/14/2018 5/14/2018 7 Backus Avenue Thread CT Hartford I-84 6 Under construction 4/5/2018; operational 5/9 5/9/2018 42 Asylum Street Thread CT Manchester I-84 16 Under construction 10/1/2017; awaiting transformer & hookup 10/24; transformer installed, awaiting power on / testing 11/4; operational 12/17 12/17/2017 Plaza at Buckland Hills Thread CT Milford II I-95 14 Under construction 12/19/2016; construction complete with transformer installed 3/18; operational 4/28 Connecticut Post Mall, 1201 Post Road Thread CT Stamford - Summer Street Urban 10 Under construction 3/5/2019; operational 8/9 8/9/2019 1250 Summer Street Thread CT Stamford - High Ridge Road CT-15 12 Construction complete 5/21/2019; operational 8/9 8/9/2019 1115 High Ridge Road Thread CT Waterbury I-84 8 Under construction 10/13/2018; awaiting transformer & hookup 12/2; transformer installed 12/13; operational 12/19 12/19/2018 160 Kukas Lane Thread DE Claymont I-95 8 Construction well underway 3/17/2018; transformer installed but no meter 5/14; operational 6/6 6/6/2018 Wawa, 691 Naamans Road Thread DE Dover US-13 8 In permitting 9/17/2018; construction starting 11/14; transformer installed 12/22; operational 1/11/2019 1/11/2019 Wawa, 2800 North DuPont Highway Thread DE Lewes US-9/DE-1 8 County says plans revised in May 2017; call for utilities to mark before digging 9/14/2017; construction started 10/18; awaiting transformer & hookup 11/23; operational 12/16 12/16/2017 Wawa, 17663 Dartmouth Drive Thread FL Aventura I-95 40 Site reportedly chosen as of 8/10/2017; under construction 3/15/2018; operational 5/16 5/16/2018 Aventura Mall, new parking garage Thread FL Altamonte Springs I-4 10 In permitting as of 8/31/2017; under construction 2/28/2018; operational 5/26 5/26/2018 Renaissance Center, East Altamonte Drive Thread FL Celebration I-4 8 Permit A19-002086 issued, under construction 4/5/2019; transformer installed 4/30, awaiting meter; connected to grid 5/15, awaiting inspection/testing; operational 5/21 5/21/2019 6240 West Irlo Bronson Memorial Highway, Kissimmee Thread FL Delray Beach US-441/FT 12 Under construction 6/22/2018; operational 7/1 7/1/2018 Delray Marketplace, 14851 Lyons Road Thread FL Florida City US-1 / Tpk 10 Under construction 3/30/2017; awaiting transformer & hookup 4/19; operational 5/22 5/22/2017 33505 S Dixie Highway Thread FL Fort Myers - Dani Drive I-75 13 Under construction 6/15/2018; operational 6/29 6/29/2018 Colonial Square Mall, 9357 6 Mile Cypress Parkway Thread FL Gainesville I-75 10 Permit application BP-18-03738 submitted for review 6/1/2018; under construction 2/11/2019; transformer installed while construction continues 4/8; meter installed 4/16; operational 4/17 4/17/2019 Butler Plaza, 3217 SW 35th Blvd Thread FL Jacksonville I-295 10 Permit E-18-969696.000 issued 6/14/2018; under construction 7/19; operational 8/30 8/30/2018 Wawa, 4866 Gate Parkway Thread FL Live Oak I-10 10 Under construction 7/15/2017; operational 8/20 8/20/2017 Busy Bee Truck Stop, 6886 US-129 Thread FL Marathon US-1 4 Tesla reports this site is in permitting 7/26/2014; lease agreement signed 11/22; under construction 3/22/2015; operational 5/2 5/2/2015 Florida Keys / Marathon Airport Thread FL Miami - Brickell Urban 24 Under construction 11/5/2017; operational 3/16/2018 3/16/2018 Brickell City Center, 701 South Miami Avenue Thread FL Miami - Mary Brickell Village I-95 4 Operational 5/5/2019 5/5/2019 71 SW 10th Street Thread FL Miami - NE 41st Street I-95/I-195 14 Operational 6/23/2018 6/23/2018 90 NE 41st Street Thread FL Miami - SW 8th Street I-95 10 Operational 5/31/2018 5/31/2018 701 South Miami Avenue Thread FL Naples US-41 8 Plans submitted for review 5/6/2016; variance recommended for approval by Planning Advisory Board 6/8; variance request withdrawn by Tesla 8/4, building permit #161757 under review; under construction 11/12; awaiting power on / testing 1/11/2017; operational 2/23 2/23/2017 NW corner of parking garage, 499 Bayfront Place Thread FL Orlando I-4 10 Consruction starting 11/13/2017; waiting for transformer & hookup 12/12; transformer installed 1/5/2018; meter installed 2/20; power on 3/1, awaiting testing; operational 3/9 3/9/2018 Wawa, 6500 West Sand Lake Road Thread FL Orlando - North Alafaya Trail FL-408 12 Under construction 11/26/2018; awaiting power on / testing 1/20/2019; operational 2/14 2/14/2019 435 North Alafaya Trail Thread FL Pembroke Pines I-4 8 Permit application 169584 submitted 3/22/2018; permit issued 6/28; operational 10/11 10/11/2018 14916 Pines Blvd Thread FL Pinellas Park I-275 8 Under construction 7/23/2017; operational 8/10 8/10/2017 Wawa, 3101 Gandy Blvd Thread FL Plantation I-75 8 site negotiations to take place in October 2014; permit B14-04072 filed 12/19; 11 environmental conditions enumerated 12/27; plans resubmitted 2/3/2015; 14 conditions remain to be resolved 3/19; 11 conditions remain 3/20; 7 conditions remain 3/24; 2 conditions remain 3/26; passed engineering review 4/7; construction began 8/12; waiting for transformer 10/2; transformer installed 11/30; power connected and inspections in progress 12/17; operational 12/19 12/19/2015 near Chili's, 813 South University Drive Thread FL Riverview FL-408 10 Under construction 12/24/2018; awaiting power on / testing 2/9/2019; operational 2/14 2/14/2019 10665 Big Bend Road Thread FL Riviera Beach 8 Found under construction 2/9/2015; operational 3/20 3/20/2015 at Service Center, 4651 Dyer Blvd Thread FL Riviera Beach - Garden Road I-95 8 Awaiting transformer & hookup 12/9/2018; transformer installed 12/14; operational 12/20 12/20/2018 7289 Garden Road Thread FL Sarasota I-75 20 Source implied site will be by new Whole Foods store as of 6/15/2017; permit 17 133570 00 BE issued 6/21; under construction 7/15; transformer and meter installed 8/14, awaiting testing; operational 8/19 8/19/2017 ~5288 University Parkway Thread FL St Johns I-95 10 Minor Commercial Plan Review 20180000012 submitted 4/27/2018, approved 6/12; under construction 11/26; operational 12/19 12/19/2018 2220 County Road 210W Thread FL Tallahassee I-10 5 Sources say coming soon as of 7/8/2015; construction recently underway as of 8/29; awaiting transformer & meter 9/12; meter installed 9/19 9/23/2015 1400 Village Square Blvd Thread FL Tampa I-4 8 Consruction complete, awaiting transformer & hookup 1/4/2018; operational 2/24 2/24/2018 Wawa, 2502 North 50th Street Thread FL Tampa - West Swann Avenue, FL I-275 10 Plans approved 3/26/2018; under construction 6/23; transformer installed but no meter 7/12; operational 8/1 8/1/2018 2100 West Swann Avenue Thread FL West Melbourne I-95 10 Florida City construction crew said headed here next as of 4/19/2017; City Manager says Tesla has submitted application as of 7/10; awaiting transformer & hookup 11/23; transformer installed 12/13; operational 12/16 12/16/2017 Hammock Landing Shopping Center Thread GA Acworth I-75 14 Under construction 7/19/2019; operational 8/18 8/19/2019 3500 Baker Road Thread GA Alpharetta - Avalon GA-400 12 Under construction 10/23/2019; awaiting transformer / hookup 11/30; transformer installed 12/12; operational 1/8/2020 5185 First Street Thread GA Athens US-78 8 Under construction 5/5/2018; operational 5/17 5/17/2018 1791 Oconee Connector Thread GA Atlanta - Lenox Road GA-400/GA-141 16 Permit application BB-201707708 submitted 10/23/2017; under construction 5/24/2018; operational 8/23 8/23/2018 1705 Mall of Georgia Blvd. Thread GA Atlanta - Peachtree Road GA-400/GA-141 5 Permit application BB-201707708 submitted 10/23/2017; under construction 5/24/2018; operational 8/31 8/31/2018 1705 Mall of Georgia Blvd. Thread GA Augusta I-20 Sources say coming soon as of 2/27/2016; Tesla says approaching construction phase as of 3/25; building permit issued 5/3; transformer installed 6/5; operational 6/11 6/11/2016 Sheraton, 1069 Stevens Creek Road Thread GA Augusta - Bel Air Frontage Road I-20 10 Under construction 12/1/2018; transformer installed 12/9, awaiting power on / testing; operational 12/13 12/13/2018 4329 Bel Air Frontage Road Thread GA Buford I-85 12 Tesla reportedly pursuing a site here as of 3/17/2017; permit application submitted 9/28; permit issued 5/22/2018; under construction 9/6; transformer installed 10/9; operational 11/5 11/5/2018 1705 Mall of Georgia Blvd. Thread GA Kingsland I-95 6 Lease agreement approved 9/14/2015; under construction 10/31; to be tested 11/17; operational 11/17 11/17/2015 Kingsland Welcome Center, 1190 East Boone Avenue Thread GA Lithonia I-20 12 Under construction 6/15/2019; pedestals installed 10/1, awaiting power on / testing; power on 10/10; operational 10/16 10/16/2019 3045 Panola Road Thread GA Macon II I-75 12 Tesla reportedly plans on building at this site in Fall 2018 as of 6/21/2018; under construction 12/2; transformer installed 12/11, awaiting power on / testing; operational 12/22 12/22/2018 265 Tom Hill Sr Road Thread GA Metter I-16 8 Under construction 10/22/2019; operational 11/27 11/27/2019 1118 South Lewis Street Thread IA Altoona I-80 8 In permitting 12/19/2018; under construction 12/22; awaiting testing 2/9/2019; operational 2/16 2/16/2019 Kum 'n Go, 1430 1st Avenue N Thread IA Coralville I-80 8 Upcoming supercharger mentioned in Board of Adjustment meeting 3/21/2016; Tesla says approaching construction 7/8; construction began 7/16; awaiting transformer & hookup 8/2; transformer installed 8/13, awaiting testing; operational 9/29 9/29/2016 Hy-Vee, 2008 8th Avenue Thread IA Council Bluffs I-29/I-80 8 Under construction 3/3/2015, near completion; operational 3/10/2015 3/10/2015 3815 Metro Drive Thread IA Davenport I-80 8 permit issued 7/25/2016; found under construction 8/30; transformer installed but no meter 9/13; connecting to the grid 10/11; operational 10/20 10/20/2016 Hy-Vee, 4070 East 53rd Street Thread IA Dows I-35 8 Agreement in place with site as of 5/18/2017; under construction with transformer installed 6/17; operational 6/30 6/30/2017 Dows Junction, 904 Cardinal Ave. Thread IA Dubuque US-61/US-20 12 Under construction 3/31/2018; operational 5/2 5/2/2018 Hy-Vee, 400 South Locust Street Thread IA Shelby I-80 8 Variance request approved by city council 6/5/2018; under construction 11/28; operational 1/7/2019 1/7/2019 12 East Street Thread IA West Des Moines I-80 8 In contract negotiations as of 5/6/2016; construction begun 7/22; awaiting transformer & hookup 8/8, transformer installed 9/30; site energized and awaiting testing 10/6; operational 10/20 10/20/2016 Hy-Vee, 1725 Jordan Creek Parkway Thread ID Boise I-84 8 Permit issued 5/22/2015; construction started 6/25; construction apparently complete with transformer in place 7/26; operational 8/5 8/5/2015 Oxfod Suites Hotel, 1426 South Entertainment Ave Thread ID Coeur d'Alene I-90 6 Original site (Springhill Suites) had to be scrapped for zoning reasons; looking for new site as of 9/16/2014; permit approved for new site 1/7/2015; pavement markings / survey markers found at site 2/2; construction underway 2/13; waiting for transformer 2/20; transformer in place 2/25; electrical hookup and inspection completed 2/27; operational 3/4 3/4/2015 TM coming soon page 3502 North Fruitland Lane Thread ID Idaho Falls I-15 City council approved cost-sharing plan 12/17/2015; permitting expected complete by end of April 2016; pavement markings 4/25, operational 6/9 6/9/2016 MacKenzie River Pizza, 1490 Milligan Road Thread ID Pocatello I-15/I-86 Sources say coming soon as of 2/1/2016; under construction 4/22; awaiting transformer and hookup 5/6; operational 5/24 5/24/2016 Clarion Inn, 1399 Bench Road Thread ID Twin Falls I-84 8 Tesla says "We are actively working on a site in the Twin Falls area" as of 8/12/2015; construction began 10/5; repaving and restriping 10/26-27, then hookup and testing; operational 10/28 10/28/2015 Twin Falls Tourist Center, 2015 Nielsen Point Place Thread IL Bolingbrook I-355 8 Found under construction 4/21/2017; operational 5/31 5/31/2017 755 East Boughton Road Thread IL Champaign I-74/I-57 8 Found in late stage of construction 2/28/2016; transformer and power feed in place 3/12; operational 3/23 3/23/2016 Meijer, 2401 North Prospect Thread IL Chicago - Lakeshore East US-41 10 Under construction 6/18/2017; operational 9/11 9/11/2017 225 North Columbus Drive Thread IL Chicago - North Broadway US-41 12 Construction starting 11/28/2017; operational 1/30/2018 1/30/2018 3030 North Broadway Thread IL Chicago - South Canal Street I-90 12 Operational 2/1/2018 2/1/2018 1100 South Canal Street Thread IL Chicago - West Schiller Street I-90 12 Permit 100733296 issued 11/10/2017; operational 8/1/2018 8/1/2018 1457 North Halsted Street Thread IL Effingham I-70 6 Source says coming soon as of November 2014; reported that site selected and permitting process starting 11/18; marking utility locations on site 2/25; construction in early stages 3/4; construction nearly complete 3/23 Jack Flash, 1200 North Keller Drive Thread IL Evergreen Park I-57/I-94 6 Construction complete, awaiting transformer / hookup 6/1/2019; operational 6/17 6/17/2019 9200 South Western Avenue Thread IL Glenview I-294 10 Under construction 3/11/2018; operational 4/20 4/20/2018 1200 Noerh Milwaukee Avenue Thread IL Mount Vernon I-57/I-64 8 in planning stage 7/16/2016; under construction 9/28; operational 10/27 10/27/2016 Holiday Inn, 222 Potomac Blvd Thread IL North Aurora I-88 8 operational 10/5/2016 10/5/2016 151 Hansen Blvd Thread IL Peru I-80 8 City council passed parking lot variance 2/8/2016; under construction 5/28; transformer installed 6/13; operational 6/22 6/22/2016 HyVee, 1651 Midtown Road Thread IL Rolling Meadows I-90 10 Plans on Plan Commission agenda 4/4/2017; approved by city council 5/8; pavement markings 6/10; construction started 7/20;awaiting transformer & hookup 8/27; transformer installed 8/28; operational 10/18 10/18/2017 Meijer, 1301 Meijer Drive Thread IL Rosemont I-294 10 Operational 11/4 11/4/2018 5220 Fashion Outlets Way Thread IL Skokie I-94 10 Under construction 12/31/2017; operational 1/29/2018 1/29/2018 5507 West Toohy Avenue Thread IN Carmel US-31 10 Plan approved by city 1/3/2018; under construction 4/27[; operational 6/21/TD] 6/21/2018 Meijer, 1424 West Carmel Drive Thread IN Fishers US-69 10 Lease agreement signed 11/1/2017; under construction 2/2/2018; awaiting transformer & hookup 2/24; operational 3/16 3/16/2018 9 Municipal Drive Thread IN Fort Wayne I-69 10 Permit ELE-C-17-008554 applied dated 5/12/2017 & permit ELE-C-17-012640 dated 6/28/2017; construction in early stage 7/20/2017; transformer installed 8/24, awaiting power on / testing; operational 9/8 9/8/2017 Meijer, 6309 Lima Road Thread IN Indianapolis - Capitol Avenue I-70 12 operational 3/19/2019 109 South Capitol Avenue Thread IN Merrillville I-65 10 Under construction 4/9/2018; operational 5/9 5/9/2018 Meijer, 611 West Lincoln Highway Thread IN Terre Haute I-70 8 Under construction 3/3/2016; operational 3/30 3/30/2016 Meijer, 5600 E New Margaret Drive Thread IN Zionsville I-65 10 under construction 3/29/2019; operational 5/10 5/10/2019 Meijer, 6650 Whitestown Parkway Thread KS Colby I-70 10 Under construction 8/29/2017; transformer installed, awaiting power on / testing 9/17; operational 10/2 10/2/2017 Oasis Travel Center, 700 East Horton Avenue Thread KS Mission I-35 8 Under construction 3/28/2019; connected to grid, awaiting testing 5/16; tested 5/30; operational 5/31 5/31/2019 Hy-Vee, 6655 Martway Street Thread KS Olathe I-35 8 Approved by Planning Commission 2/22/2018; permit issued 5/3/2018; under construction 4/9/2019; transformer installed while construction continues 5/7; operational 6/10 6/10/2019 Hy-Vee, 18101West 119th Street Thread KY Bowling Green I-65 4 Tesla says site selected as of 10/28/2015; permit application in process 5/17/2016, under construction 6/1; transformer installed 6/12; operational 6/24 6/24/2016 Meijer, 1676 Westpark Drive Thread KY Kuttawa I-24/I-69 8 site reportedly selected as of 10/7/2016; under construction 12/10; construction mostly complete, waiting for transformer & hookup 12/24; operational 1/1/2017 1/1/2017 Hampton Inn, 62 Days Inn Drive Thread KY Louisville I-264/I-64 8 On "Coming Soon" map updated 12/18/2014; Tesla says site selected and construction to begin soon as of 10/28/2015; permit EL965556 issued 11/13; construction started ~11/20; energized and testing but with construction unfinished 12/22; operational 12/30 12/30/2015 2120 Gardiner Lane Thread LA Alexandria I-49 8 Supercharger reported coming to new Holiday Inn as of 4/18/2015; under construction 5/9; awaiting transformer & hookup 5/24; operational 6/7 6/7/2016 Holiday Inn, 701 4th Street Thread LA Monroe I-20 8 site selected as of 4/30/2015; construction mostly complete 7/23; pole-mounted transformers installed 8/14, scheduled for testing/power on; operational 9/15 9/15/2016 Marriott Hotel, 4915 Pecanland Drive Thread LA Shreveport I-49/I-20 8 Reported coming soon as of 4/18/2015; agreement with site in place 4/20; under construction 4/21; transformer installed and nearing completion 4/29; operational 5/12 5/12/2016 Mall St. Vincent Thread LA Slidell I-10 8 On "Coming Soon" map updated 12/18/2014; Tesla says will not be built in summer 2015 as of 4/26/2015; waiting for other construction at site 7/8; permitting reportedly completed, construction started as of 1/17/2016; transformer installed but construction continuing 1/27; energized and awaiting testing 2/2; operational 2/6 2/6/2016 Fremaux Town Center, 1808 Shortcut Highway Thread MA Boston City 8 Operational 9/11/2017 9/11/2017 800 Boylston Street Thread MA Boston - Richard B Ross Way Urban 8 Operational 4/27/2019 4/27/2019 1341 Boylston Street Thread MA Boston - South Bay City 10 Operational 12/4/2017 12/4/2017 8 Allstate Road Thread MA Braintree I-93 8 Minor modification approved by Planning Board 1/15/2019; under construction 6/15; operational 7/24 7/24/2019 250 Granite Street Street, 2nd floor of garage Thread MA Dedham I-95 8 Tesla service center w/superchargers approved by Dedham Board of Selectmen 1/8/2015; under construction 6/22; being connected to grid 7/29 8/8/2015 840 Providence Highway Thread MA Framingham I-90 12 Construction starting 12/7/2017; operational 6/29/2018 6/29/2018 Shopper's World Thread MA Hadley I-91 12 To be installed with new gas station as of 12/4/2017; awaiting transformer 2/13/2018; operational 4/17 4/17/2018 25 Russell Street Thread MA Hudson I-495 10 Hudson Light & Power says coming soon as of 10/13/2018; under construction 11/28; awaiting meter 1/17/2019; meter installed, testing 1/22; operational 1/29 1/29/2019 near Panera Bread, Highland Common Thread MA Lee I-90 8 on minutes of 2/22/2016 Planning Board meeting, continued until public hearing at 3/14 meeting; approved by Conservation Commission 4/6; construction began 6/27; awaiting transformer & hookup 8/5; operational 8/19 8/19/2016 Big Y, 10 Pleasant Street Thread MA Leominster MA-2,I-190 8 Under construction 6/19/2017; awaiting transformer & hookup 10/23; transformer & meter installed 11/29, awaiting power on & testing; operational 12/13 12/13/2017 100 Commercial Road Thread MA Lynnfield I-95 12 Proposed Tesla charging station on Planning Board agenda for 8/30/2017; approved by Planning Board 10/11/2018; construction starting 5/3/2019; transformer installed 7/7 as construction continues; operational 8/2 8/2/2019 Market Street Thread MA Mansfield I-495 8 On agenda of Planning Board meeting 6/6/2018; under construction 6/12; operational 6/29 6/29/2018 280 School Street Thread MA Mashpee MA-28 12 Under construction 11/26/2018; operational 1/17/2019 1/17/2019 Mashpee Commons Thread MD Aberdeen I-95 8 Agreement reached with Maryland DOT as of 8/4/2016; contractor requested permission from utilities to dig 4/26/2017; construction began 6/8/2017; operational 9/1 9/1/2017 Maryland House Travel Plaza on I-95 Thread MD Annapolis US-50 8 Under construction 5/27/2018; awaiting transformer 8/25; transformer delivered 10/27; transformer hooked up 11/9; meter box installed 12/2; meter installed 3/15; operational 3/22 3/22/2019 217 Harker Place Thread MD Baltimore I-95 8 Under construction 7/5/2018; awaiting transformer / hookup 9/14; operational 10/24 10/24/2018 1641 Whetstone Way Thread MD Frederick I-270 12 Building permit 184159 issued 11/28/2018; under construction 6/12/2019; transformer installed but awaiting pedestals 9/3; pedestals installed 11/4; operational 11/26 11/26/2019 5500 Buckeystown Pike Thread MD Gaithersburg I-270/I-370 12 Plans submitted 5/23/2017, approved 6/28/2017; permit dated 7/3; fencing up around site 9/1; under construction 9/5; transformer installed 11/15; operational 12/13 12/13/2017 24 Grand Corner Avenue Thread MD Grasonville US-50 12 Under construction 7/17/2017; transformer and meter installed 7/31; operational 8/18 8/18/2017 108 Jackson Creek Road Thread MD Hanover MD-295 8 Under construction 5/21/2019; awaiting testing 11/7; operational 11/14 11/14/2019 3rd floor of parking garage, 7787 Arundel Mills Blvd. Thread MD Laurel I-95 8 Permit application submitted as of 12/18/2015; permit issued and utility markings at site 4/29; equipment staged on site and construction beginning 5/3; transformer installed 7/11, awaiting grid connection & meter installation; connected to grid and meter installed 7/22, awaiting testing; operational 9/23 9/23/2016 Towne Center at Laurel, 14700 Baltimore Avenue Thread MD La Vale I-68 8 In discussions with Canal Place Development & Preservation Authority as of 10/21/2016; under construction 6/29/2017; operational 9/1 9/1/2017 Sheetz, 11601 Winchester Road, Cumberland MD Thread MD National Harbor I-495 12 Contractor requested permission from utilities to dig on 7/7/2017; construction started 7/12; transformer installed while construction continues 8/30; awaiting power on & testing 9/21; operational 10/2 10/2/2017 165 Waterfront Street Thread MD North East I-95 10 Contractor requested permission from utilities to dig on 4/26/2017; under construction 6/24; awaiting transformer & hookup 8/24; transformer installed 9/2; operational 9/8 9/8/2017 Chesapeake House Travel Plaza on I-95 Thread MD Riverdale Park US-1 8 Under construction 3/10/2019; transformer installed 7/12; operational 7/19 7/19/2019 6761 45th Street Thread ME Augusta I-95 8 source says coming soon as of 12/30/2014; #19587 on October 2015 permit report as issued; construction well underway as of 11/17; operational 12/3 12/3/2015 Marketplace at Augusta, 13 Stephen King Drive near Red Robin Thread ME Baileyville US-1/ME-9 8 Utility markings 4/15/2018; permit application in process 6/18; under construction with transformer installed 6/7; awaiting power on / testing 8/20; operational 9/12 9/12/2019 Big Stop, 32 Houlton Road Thread ME Brewer US-1A 8 Agreement with Ruby Tuesday as of 7/3/2016; area fenced off 7/10, construction began 7/12; awaiting transformer & hookup 8/2; transformer installed 8/24; operational 9/1 9/1/2016 Ruby Tuesday, 5 Walton Drive Thread ME Freeport I-295 8 Construction reportedly to begin by 9/30/2017; operational 10/19 10/19/2017 Trout Park parking area, Justin's way near Cross Street Thread ME Jackman US-201 4 Construction mostly complete 9/1/2019; operational 10/19 10/19/2019 407 Main Street Thread ME Kennebunk - Northbound I-95 8 Under construction 5/17/2018; transformer installed 6/7; operational 6/13 6/13/2018 I-95 Service Plaza Thread ME Kennebunk - Southbound I-95 8 Under construction 5/17/2018; operational 6/29 6/29/2018 I-95 Service Plaza Thread ME Medway I-95 8 Town office says permitting is done as of 8/15/2018; under construction 5/24/2019; pedestals installed 10/1; operational 10/17 10/17/2019 Big Stop, 1941 Medway Road Thread ME Portland Tesla opted against a downtown parking garage site as of 3/2/2015 - new site needed; permit BLDC2018-00285 applied for 8/5/2018; under construction 4/24; pedestals installed 10/9; operational 10/17 10/17/2019 295 Forest Avenue Thread MI Ann Arbor I-94 8 Possible building permit applied for 4/7/2015; permit ready to issue 4/29; under construction 6/2; construction complete and waiting for transformer 6/29; transformer installed 8/4; meter installed 8/16; operational 8/20 8/20/2015 Meijer, 3145 Ann Arbor Saline Road Thread MI Auburn Hills I-94 8 Construction imminent as of 9/12/2017; under construction 10/8; transformer installed 11/29, awaiting meter; meter installed 12/18; operational 3/22/2018 3/22/2018 Meijer, 800 Brown Road Thread MI Bay City In permitting process as of late March 2016; plans approved by Planning Commission 7/5; pavement markings 8/9; awaiting transformer & hookup 8/28; transformer installed 9/1; operational 9/16; irregularly non-operational or operating on lower power 10/7; fully operational 11/8TD] 9/16/2016 Meijer, 2980 Wilder Road MI Big Rapids US-131 10 Under construction 10/16/2017; operational 3/8/2018 3/8/2018 Meijer, 15400 Waldron Way Thread MI Cadillac 8 Permit issued 7/13/2015; construction fence up 9/8; construction appears complete with transformer installed but no meter 10/4; reported operational 10/29; temporarily offline 12/9; operational 12/23 12/23/2016 Meijer, 3605 East 34th Road Thread MI Clare US-127/US-10 8 Plan approved by city staff & DDA design committee 10/8/2018; under construction 4/5/2019; transformer installed and power on 5/3, awaiting testing; operational 5/18 5/18/2019 Doherty Hotel, 604 North McEwan Thread MI Gaylord I-75 10 Under construction 10/1/2017; awaiting transformer & hookup 10/17; transformer and meter installed, connected to grid 6/10/2018; operational 6/21 6/21/2018 Meijer, 250 Meijer Drive Thread MI Grand Rapids Permit issued 3/23/2015; construction started 5/21; will be ready for testing the week of 6/22-26; operational 6/24 6/24/2015 Meijer, 5531 28th Street SE Thread MI Hudsonville I-196 8 Special land use permit granted by planning commission 2/9/2018; under construction 4/10/2019; operational 8/16 8/16/2019 Meijer, 4075 32nd Avenue Thread MI Lansing I-94 8 Site plan approved 4/19/2017; Marshall MI contractor says Lansing to break ground 6/26; under construction 7/4; transformer installed 8/18; operational 9/11 9/1/2017 2505 Showtime Drive Thread MI Livonia I-96 10 Under construction 9/30; transformer installed 12/1, awaiting meter; operational 1/20/2018 1/20/2018 Meijer, 13000 Middlebelt Road Thread MI Ludington US-10 8 Operational 6/23/2017 6/23/2016 Meijer, 3900 W US Highway 10 Thread MI Marshall I-94 8 Construction to begin ~5/15/2017; construction well underway 6/24; awaiting transformer 7/3; operational 7/6 7/6/2017 15252 US Highway 27 North Thread MI Muskegon I-96/US-31 10 Under construction 10/18/2017; operational 2/26/2018 2/26/2018 Meijer, 5300 Harvey Street Thread MI Port Huron I-94/I-69 8 Permit issued 5/16/2016; Under construction 5/18; transformer & meter installed 7/22; operational 8/18 8/18/2016 Double Tree, 800 Harker Street Thread MI Roseville I-94 8 Under construction 10/2; awaiting transformer & hookup 10/30; transformer installed 11/19, awaiting meter; operational 11/23 11/23/2017 Meijer, 30800 Little Mack Avenue Thread MI Traverse City US-31 10 Reportedly coming as of 2/17/2017; permits for fence and charging station dated 6/23 & 6/27; under construction 7/21; transformer installed 8/31; operational 9/8 9/8/2017 Meijer, 3955 US-31 Thread MI Walker I-96 8 In planning 9/18/2018; under construction 12/1; operational 12/23 12/23/2018 Meijer, 2988 Walker Avenue NW Grand Rapids Thread MN Albert Lea - Happy Trails Lane I-94 Under construction 5/3/2019; awaiting power on / testing 8/7; operational 8/15 8/15/2019 820 Happy Trails Lane Thread MN Baxter 8 Source reports coming soon as of 7/29/2015; found under construction 9/26; operational 10/21 10/21/2015 Arrowwood Lodge, 6967 Lake Forest Road Thread MN Clearwater I-94 8 Tesla says coming before end of 2016 as of 10/10/2016; Permit ELE1610-03417 issued 10/12; operational 12/22 12/22/2016 Clearwater Travel Plaza, 950 Highway 24 Thread MN Duluth I-35 4 Tesla reports under construction as of 6/26/2015 and due to open in early July; permit BELEC1506-007; operational 7/17 7/17/2015 210-212 West 1st Street, 4th level Thread MN Hinckley I-35 Under construction 9/24/2015; operational 10/21 10/21/2015 Tobie's, 404 Fire Monument Road Thread MN Oakdale I-94 Site discussed with Economic Development Commission 2/3/2016; Tesla says nearing construction phase as of 5/30; under construction 6/24; awaiting transformer & hookup 7/22; transformer installed 8/8; operational 8/16 8/16/2016 Hy-Vee, 7180 10th Street North MN Robbinsdale MN-100 Call for pavement markings 4/8/2019; fenced for construction 4/27; under construction with utility transformer installed 5/1; operational 6/18 6/18/2019 3435 West Broadway Thread MN Rochester US-14/US-52 8 Plans submitted to the city as of 8/4/2017; notification of digging submitted 9/11; under construction 9/16; transformer installed 10/17; operational 10/20 10/20/2017 Thread MN Sherburn I-90 8 Contractor asked utilities to mark site 6/16/2017; under construction 10/9; transformer installed 10/21; operational 11/20 11/20/2017 Kum & Go, 600 State Highway 4 Thread MO Bethany I-35 8 City says construction ready to start 3/8/2018; transformer installed as of 10/1, lease to be signed early October, under construction 11/20; operational 12/6 12/6/2018 Kum and Go, 3807 Miller Street Thread MO Columbia I-70 6 Source reports permit approved 11/7/2014; site reportedly blocked 12/9; in permitting as of 7/13/2015, permit processing (#15-2398) should be done by 7/17; permit issued 7/31; under construction 8/13; operational 9/10 9/10/2015 Holiday Inn East, 910 Port Way Thread MO Joplin I-44 8 In site negotiations as of 4/25/2016; discovered mostly complete with transformer installed 11/16; operational 11/30 11/30/2016 Hotel Joplin, 3132 Hammons Blvd Thread MO Kansas City I-35 8 Under construction 5/3/2018; operational 5/25 5/25/2018 8301 North St Clair Avenue Thread MO Mehlville I-55/I-270 12 Under construction 5/4/2018; awaiting transformer 5/10; transformer installed 5/30; operational 6/23 6/23/2018 18 South County Center Way, St Louis Thread MO Miner I-55/I-57 8 Under construction as of 5/13/2016, operational 6/1 6/1/2016 Ruby Tuesday, 2612 East Malone Avenue Thread MO Osage Beach US-54 Under construction 5/8/2017; transformer installed 6/1, awaiting power on / testing; power connected 6/8; operational 6/14 6/14/2017 Hy-Vee, 919 Highway D Thread MO Rolla I-44 8 Site identified in news article 10/28/2015; permit EL2016-00210 ready 1/4/2016; construction began 7/18; transformer installed but construction continues 8/8; initial construction out of specifications and ripped out 9/2; operational 9/27 9/27/2016 Bandana's Bar-B-Q, 1705 Martin Spring Drive Thread MO Springfield I-44 8 Out for contractor bid 4/26, in permitting process 5/23; permit ELE2016-00991 issued 10/5, under construction; operational 11/16 11/16/2016 3070 North Kentwood Thread MO St. Charles I-70 5 on Coming Soon map released 12/18/2014; permit number CU-2014-32 approved by city council 1/6/2015; utility markings noticed 2/11; equipment staged at site 2/20; construction began 2/23; transformer installed 4/1; to be tested 4/3; operational 4/14 4/14/2015 Bogey Hills Shopping Plaza / 2021 Zumbehl Road Thread MO St. Charles - Streets of St. Charles I-70 Under construction 4/13/2019; awaiting transformer 5/7; operational 5/15 5/15/2019 Parking garage, 1650 Beale Street Thread MO St Joseph I-29 8 Under construction 10/14/2018; awaiting testing 10/31; operational 11/20 11/20/2018 201 North Belt Highway Thread MS Grenada I-55 8 Tesla says they are installing a supercharger here as of 2/21/2017; operational 7/8 7/8/2017 Thread MS Hattiesburg I-59 8 Under construction 9/23/2019; operational 11/24 11/24/2019 6109 US Highway 98 Thread MS McComb I-55 8 Mall management reports superchargers coming as of 7/2/2019; under construction 9/26; awaiting pedestals 11/6; operational 11/24 11/24/2019 6Southwest Mall, 1436 Delaware Avenue Thread MS Meridian I-20/I-59 8 Permitting in process or complete as of 4/30/2016; construction began 8/13; construction mostly complete with transformer in place 9/20; operational 10/7 10/7/2016 Bonita Lakes Mall Thread MS Pearl I-20 8 sources say construction to begin by spring 2016; operational 3/31 3/31/2016 200 Bass Pro Drive Thread MS Tupelo I-22 8 Found under construction 4/24/2017; operational 5/11 5/11/2017 1001 Barnes Crossing Road Thread MT Lima I-15 Mentioned in city council meeting 12/14/2015; utility markings found 8/14/2016; construction in progress 9/14; awaiting transformer & hookup 11/30; transformer installed 12/7; operational 1/9/2017 1/9/2017 Jan's Cafe, 108 Bailey Street Thread MT West Yellowstone US-20/US-191 8 Tesla technician to go to site 5/24/2016; operational 5/25 5/25/2016 201 South Canyon Street Thread NC Asheville I-26/I-40 8 Permit applications 15-10934, 15-10937, 15-10938 found 8/22/2015 being processed by city; permit approved 10/13; permit issued 10/16, reissued 10/23; under construction 10/30; transformer installed 11/23; awaiting power on/testing 12/9; operational 12/16 12/16/2015 800 Brevard Road Thread NC Cary NC-540 12 Permit application WAKE-414277 submitted 4/3/2019; under construction 6/22; transformer installed while construction continues 7/2; pedestals installed 10/29; awaiting power on / testing 11/5; operational 11/22 11/22/2019 7119 O'Kelly Chapel Road Thread NC Charlotte - Toringdon Way I-485 8 Permit application 396662 submitted 5/14/2019; under construction 8/5; transformer installed but awaiting pedestals 8/29; pedestals installed 10/25; awaiting power on / testing 11/6; operational 11/9 11/9/2019 3429 Toringdon Way Thread NC Fayetteville I-95 16 Found under construction 11/2/2017; operational 11/6 11/6/2017 1965 Cedar Creek Road Thread NC Greensboro I-40 8 Permit applied for 8/2/2017; permit near approval 9/11; under construction 10/4; transformer installed while construction continues 12/1; construction complete 12/7; meter installed and connected to the grid 12/13; operational 12/17 12/17/2017 Sheetz, 5421 Hornaday Road Thread NC Henderson I-85 8 Operational 6/21/2019 6/21/2019 619 Ruin Creek Road Thread NC Hickory I-40 8 In permitting as of 9/26/2017; plan review began 10/12; plans approved 11/22; under construction 2/22/2018; transformer installed 3/26; meter installed and energized 3/29, awaiting testing; operational 4/3 4/3/2018 Sheetz, 2191 13 Avenue Drive SE Thread NC Kill Devil Hills NC-12 8 Under construction 5/25/2019; operational 5/30 5/30/2019 2012 South Croatan Highway Thread NC Mount Airy I-74 8 Construction complete, awaiting transformer 6/7/2019; oeprational 6/22 6/22/2019 Sheetz, 2905 Rockford Street Thread NC Raleigh I-440 14 Site reportedly selected as of 8/28/2017; awaiting power on / testing 10/28; operational 11/2 11/2/2017 4191 The Circle At North Hills Street Thread NC Smithfield I-95 8 Under construction 6/10/2019; pedestals installed 9/27; operational 10/4 10/4/2019 Sheetz, 1700 East Market Street Thread NC Wallace I-40 8 Under construction 6/1/2018; operational 6/14 6/14/2018 River Village Place Thread NC Warsaw I-40 6 Under construction as of 2/23/2016; operational 3/11 3/11/2016 Quality Inn, 2676 NC 24 Thread NC Wilmington I-40 10 Under construction 4/5/2017; operational 5/16 5/17/2017 Mayfaire Town Center Thread NE Gothenburg I-80 8 Tesla looking for site as of 7/6/2016; equipment staged at site 11/3; transformer installed with construction continuing 11/19; to be tested 11/30; operational 12/2 12/2/2016 Nebraska Barn & Grill, 318 Platte River Road Thread NE Grand Island I-80 8 Reportedly under construction 11/2/2016; in early stage of construction 11/27; transformer installed while construction continues 12/24; operational 1/5/2017 1/5/2017 Bosselman Travel Center, 3335 West Wood River Road Thread NE Lincoln I-80 8 Tesla looking for site as of 7/6/2016; application AA16055 filed with Planning Commission 8/1; construction started 11/3; awaiting transformer & hookup 12/4; transformer installed 12/24; operational 1/5/2017 1/5/2017 Hy-Vee, 5020 North 27th Street Thread NE Ogallala I-80 6 Tesla looking for site as of 5/20/2016; construction well underway 11/2; construction complete, transformer installed 12/1; operational 12/2 12/2/2016 Holiday Inn Express, 501 Stagecoach Trail Thread NE Sidney I-80 8 Construction complete with transformer installed as of 5/2/2017; power connected 5/4, awaiting testing; operational 5/10 5/10/2017 Best Western, 645 Cabela Drive Thread NH Lincoln I-93 6 Discussed at Lincoln Planning Board meeting 9/14/2016, to be followed up at 9/28 meeting; reported under construction 11/15; operational 11/24 11/24/2016 RiverWalk Resort, 22 South Mountain Drive Thread NH Seabrook I-95 8 Up for planning board approval 5/19/2015 and approved with conditions; construction began 8/22; waiting for transformer 9/25; transformer installed 10/5; operational 10/9 10/9/2015 near Panera, 700 Lafayette Road Thread NH West Lebanon I-89 8 Permit approved 2/19/2015; construction began 5/11; construction mostly complete and waiting for transformer 6/20; transformer installed 6/25; operational 7/17 7/17/2015 Price Chopper, 285 North Plainfield Thread NJ Barnegat Township GSP 8 Under construction 3/29/2019; transformer installed 5/11; operational 5/22 5/22/2019 Wawa, 945 West Bay Avenue Thread NJ Basking Ridge I-78 8 Site plan submitted 4/10/2018; before the Zoning Board of Adjustment 5/9/2018 and determined not to be complete; plan approved 10/9; permit application submitted 1/15/2019; permit approved 3/1; under construction 3/19; transformer installed 6/20; operational 7/13 7/13/2019 403 King George Road Thread NJ Burlington I-95 8 Found under construction 8/9/2017; operational 9/9 9/9/2017 Thread NJ Cape May Court House GSP 12 Under construction 4/8/2019; operational 7/25 7/25/2019 11 Court House South Dennis Road Thread NJ East Brunswick - Brunswick Square Mall I-95/NJ-18 18 Under construction 1/24/2019; transformer installed 4/2, awaiting power on / testing; operational 6/21 6/21/2019 755 State Route 18 Thread NJ Egg Harbor Township IGSP/ACE 8 Found under construction 5/26/2016, transformer installed 6/16; operational 6/22 6/22/2016 3121 Fire Road Thread NJ Jersey City I-95 6 operational 2/15/2018 2/15/2018 160 First Street Thread NJ Jersey City - Mall Drive West I-95 20 Supercharger crates being delivered 11/12/2017; construction mostly done 11/23; awaiting transformer & hookup 12/15; operational 2/23 2/23/2018 Newport Centre Mall Thread NJ Joyce Kilmer Service Area I-95 4 Turnpike authority approved agreement 9/23/2014; equipment on site 3/13/2015; construction began 4/29, apparently complete and waiting for transformer 5/26 5/26/2015 NB I-95 in East Brunswick Thread NJ Kearney NJ-42/NJ-55 8 Construction complete 10/21/2018, awaiting transformer / hookup; transformer installed 1/3/2019; operational 2/15 2/15/2019 Wawa, 200 Harrison Avenue Thread NJ Marlton NJ-73 8 Construction mostly complete 2/9/2019; transformer installed 4/2, awaiting power on / testing; operational 4/26 4/26/2019 500 Route 73 South Thread NJ Molly Pitcher Service Area I-95 4 Turnpike authority approved agreement 9/23/2014; construction started 5/15/2015; construction complete and awaiting transformer 6/20; operational 7/8/2015 7/8/2015 SB I-95 in Cranbury Thread NJ North Brunswick US-1 10 Under construction 3/1/2018; awaiting transformer 5/7; transformer installed 6/21; operational 7/19 7/19/2018 301 Grand Avenue Thread NJ Parsippany I-280 8 Site plan before the Board of Adjustment 4/4/2018; under construction 12/4; awaiting transformer / hookup 1/4/2019; transformer installed, awaiting meter 1/22; operational 3/5 3/5/2019 Wawa, 350 New Road Thread NJ Paulsboro I-295 8 Under construction 12/4/2018; operational 1/11/2019 1/11/2019 Wawa, 51 Berkley Road Thread NJ Robbinsville NJ-73 8 Construction mostly complete 2/9/2019; transformer installed 4/2, awaiting power on / testing; operational 4/26 4/26/2019 500 Route 73 South Thread NJ Rockaway I-80 12 Under construction 10/24/2018; awaiting transformer / hookup 1/4/2019; transformer installed 1/17; meter installed 1/30; operational 3/2 3/2/2019 395 Mount Hope Avenue Thread NJ Tinton Falls GSP 8 Found with construction complete and transformer installed 7/28/2015, awaiting inspection/power on/testing; operational 9/19 9/19/2015 Jersey Shore Premium Outlets Thread NJ Toms River GSP 8 Under construction 6/2/2019; operational 10/18 10/18/2019 Wawa, 379 Dover Road Thread NJ Woodbridge US-9/I-95/GSP 8 Found under construction 10/29/2017; awaiting transformer & hookup 11/27; transformer installed 1/11/2018; operational 3/10 3/10/2018 Wawa, 440 King Georges Road Thread NM Albuquerque I-40 6 Site selected but permit application not yet filed 3/5/2015; construction began 5/1, to be complete by ~5/22; testing 6/1?; mysterious fence needed as of 8/3; fence line chalked on 8/18; fence construction started 8/24, operational 9/4 9/4/2015 Holiday Inn Express, 2500 Menaul Blvd NE Thread NM Deming I-10 in planning / permitting as of 7/19/2017; permit application submitted 9/21; permit issued 9/25; under construction 10/6; operational 11/18 11/18/2017 5R Travel Center, 1695 US-180 Thread NM Las Vegas I-25 Site selected, in planning stage working with local utility 3/20/2015; contract award expected by 5/8; equipment staged on site 6/27; construction well underway 8/4; construction complete, awaiting meter and power on 8/30; meter and transformer installed 9/4, awaiting power on and testing; operational 9/11 9/11/2015 Comfort Inn, 2500 North Grand Avenue Thread NM Santa Fe I-25 10 In permitting as of 10/28/2016; construction began 1/18/2017; construction appears complete, awaiting transformer / hookup 3/10; transformer installed 4/1; operational 4/13 4/13/2017 Fashion Outlets of Santa Fe, Cerritos Road at I-25 Thread NM Santa Rosa I-40 6 Under construction 3/4/2015, construction expected to be complete ~3/20; operational 3/13 3/13/2015 Holiday Inn Express, 2516 Route 66 Thread NM Truth or Consequences I-25 Permit application ELEC_2017017432 dated 6/23/2017, awaiting power on / testing 7/4; operational 7/8 7/8/2017 Holiday Inn Express, 2201 F.G. Amin Street Thread NM Tucumcari I-40 Media report of upcoming supercharger 2/3/2015; in early stages of construction 3/27; operational 4/19 4/19/2015 Holiday Inn Express, 2624 South Adams Street Thread NV Beatty US-95 8 Tesla working with site owners as of 9/14/2015 - hope to be operational by end of 2015; no construction as of 10/17; under construction 10/31; transformer installed 1/25/2016; operational 2/8 2/8/2016 Eddie World, US-95 North Thread NV Gardnerville US-395 6 Permit issued 8/24/2015; under construction 9/24; operational 10/22/2015 10/22/2015 Topaz Lodge, 1979 S Highway 395 Thread NV Hawthorne US-95 8 Under construction 4/23/2016; awaiting hookup & testing 5/2; operational 5/3 5/3/2016 Port o Subs, Freedom Road near Bonanza Road Thread NV Henderson I-11/I-515 12 Construction mostly complete 4/23/2018; operational 6/23 6/23/2018 Railroad Pass Casino, 2820 South Boulder Highway Thread NV Incline Village NV-28 12 Permit WBLD17-103153 submitted 10/17/2017; permit issued 4/11/2018; Under construction 6/8; operational 8/29/2019 8/29/2019 930 Tahoe Blvd. Thread NV Las Vegas 2 I-15 10 Under construction 11/24/2016; transformer installed but no meter 12/30; operational 3/9/2017 3/9/2017 Town Square, 6509 S Las Vegas Blvd Thread NV Las Vegas - LINQ Hotel I-15 24 Permit B19-11759 approved and awaiting final inspection 7/16/2019; operational 7/19 7/19/2019 3545 South Las Vegas Blvd Thread NV Las Vegas - South Rampart Blvd NV-613 6 Operational 5/23/2019 5/23/2019 400 South Rampart Blvd. Thread NV Reno US-395 8 Under construction 5/4/2016; operational 5/5 5/5/2016 Atlantis Hotel / Casino, 3800 S Virginia St Thread NV Reno - Sierra Street I-80 10 Permit B19-02996 submitted 9/28/2018, issued 9/24/2019; under construction 11/4; awaiting transformer / hookup 12/12; operational 12/23 12/23/2019 El Dorado Casino, 375 North Sierra Street Thread NV Stateline US-50 14 Tesla in negotiations to nail down a site for over a year as of 10/13/2015; construction mostly complete 7/23/2017; operational 8/25 8/25/2017 Hard Rock Hotel, 50 US-50 Thread NV Tonopah US-95 Tesla in negotiations with City of Tonopah as of 10/14/2015; town board approved contract, sent to Tesla for signature 12/23; design finalized as of 2/29/2016, under construction 5/21; operational 6/2 6/2/2016 Pocket Park, 201 North Main St Thread NY Binghamton I-81/I-88 Site selected and in design phase as of 7/8/2015; near construction phase as of 8/31; one permit remaining as of 10/2, in early stage of construction 10/15; transformer installed 10/30; testing 10/30; operational 10/31 10/31/2015 The Spot Restaurant, 1062 Front Street Thread NY Bronx - Bay Plaza I-95 12 Construction complete, awaiting transformer 3/10/2019; operational 4/10 4/10/2019 270 Baychester Avenue Thread NY Brooklyn I-278 4 Operational 10/9/2017 10/9/2017 1133 North 12th Street Thread NY Brooklyn - Atlantic Avenue Urban 12 Operational 6/16/2019 6/16/2019 625 Atlantic Avenue Thread NY Brooklyn - Brooklyn Museum Urban 10 Construction mostly done 7/31/2018; awaiting power on / testing 8/6; operational 9/29 9/29/2018 878 Washington Avenue Thread NY Clarence I-90 8 Tesla of Canada says lease negotiations almost complete as of 7/1/2014; special exemption use permit on agenda of 11/5 Town board meeting; passed by Town Board; pavement markings 4/9/2015; construction began 4/13; awaiting transformer 5/5; transformer installed 6/4; operational 6/11 6/11/2015 4455 Transit Road Thread NY Clinton Corners TSP 8 Under construction 11/6/2017; operational 1/16/2018 1/16/2018 2300 Salt Point Turnpike Thread NY Erwin I-86 10 Planning Board considered presented plan to be incomplete on 2/6/2017; under construction 6/3; transformer installed 7/23; unofficially operational 7/25 7/25/2017 125 Victory Highway Thread NY Glendale - Cooper Avenue Urban 10 Operational 6/16/2019 6/16/2019 8000 Cooper Avenue Thread NY Guilderland I-90/I-87 20 Under construction 7/8/2017; operational 8/16 8/16/2017 Crossgates Mall Thread NY Islandia I-495 10 Under construction 4/1/2018; meter installed 7/25; operational 8/10 8/10/2018 1750 Veterans Highway Thread NY Ithaca NY-13/34/96 8 Under construction 7/19/2019; transformer and meter installed, awaiting testing 7/21; operational 7/25 7/25/2019 744 South Meadow Street Thread NY Kingston I-87 8 Found under construction 9/27/2016; operational 10/17 10/17/2016 660 Washington Avenue Thread NY Newburgh I-84/I-87 6 Construction began 4/9/2015, fixing construction issues and awaiting transformer and power hookup 5/9; ripped up and needing extensive work because of contractor error 5/28; work expected to be complete 6/5; operational 6/9 6/9/2015 Cosimo's Restaurant, 1217 Route 300 Thread NY New Rochelle I-95 8 City Council authorized City Manager to execute contract with Tesla 2/14/2017; under construction 12/14; awaiting transformer / hookup 4/29; operational 6/4 6/4/2018 New Roc Garage, on Hueguenot Street between Harrison Street and Lecount Place Thread NY New York - Allen Street Urban 4 Operational 7/24/2018 7/24/2018 59 Allen Street Thread NY New York - East 47th Street Urban 4 Operational 4/23/2018 212 East 47th Street Thread NY New York - Mott Street Urban 2 Operational 2/21/2018 2/21/2018 106 Mott Street Thread NY New York - West 75th Street Urban 4 Operational 4/23/2018 201 West 75th Street Thread NY Ossining I-87 10 Construction mostly complete 10/29/2018; transformer installed 5/11/2019; operational 6/14 6/14/2019 214 South Highland Avenue Thread NY Plainview I-495 16 Under construction 4/18/2018; operational 6/28 6/28/2018 1528 Old Country Road Thread NY Plattsburgh I-87 Design complete as of 4/9/2016; under construction 4/22; construction complete 5/20, awaiting transformer & hookup by 5/27, operational 6/9 6/9/2016 Champlain Centre Thread NY Queens - Queens Central Urban 10 Operational 10/2/2018 10/2/2018 90-15 Queens Boulevard Thread NY Queensbury I-87 Sources say coming soon as of 2/27/2016; under construction 7/10; operational 7/15 7/15/2016 near Friendly's, Aviation Mall Thread NY Roscoe NY-17 8 Construction began 10/22/2018; operational 2/11/2019 2/11/2019 1908 Old Route 17 Thread NY Salamanca I-86 8 Under construction 12/29/2018; operational 1/31/2019 1/31/2019 777 Seneca Allegany Blvd Thread NY Southampton NY-27 6 Under construction 3/31//2016; awaiting transformer & hookup 5/26; operational 6/2 6/2/2016 850 Southampton Bypass Thread NY Syracuse I-90 6 Permitting process will start by end of November 2014; Charlotte crew says they will be doing this site and Utica; Under construction 2/5/2015; to be tested 4/16; operational 4/16 4/16/2015 Holiday Inn, 441 Electronics Parkway, Liverpool NY Thread NY Tarrytown I-87 12 Permit process started 5/18/2016; under construction 10/6; transformer installed while construction continues 10/29; meter installed 11/29; operational 12/2 12/2/2016 Sheraton, 600 White Plains Road Thread NY Valley Stream NY-27 16 Under construction 4/18/2018; transformer installed 5/10; meter installed 5/16; operational 5/22 5/22/2018 Green Acres Mall, 23 Green Acres Road W Thread NY Victor I-90 8 On Planning Board agenda 1/24/2017; approved 1/24; construction complete and awaiting transformer 5/13; operational 6/1 6/1/2017 Eastview Mall, 7979 Pittsford Thread NY Waterloo I-90 8 Construction appears complete 2/1/2017; operational 3/10 3/10/2017 Del Lago Casino, 1133 NY-414 Thread NY Watertown I-81 Sources say coming soon as of 2/25/2016; operational 6/24 6/24/2016 21182 Salmon Run Mall Thread NY West Nyack I-287 20 Construction mostly complete 12/10/2018; awaiting transformer / hookup 1/9/2019; transformer installed 4/30; connected to grid 5/30; operational 7/15 7/15/2019 1920 Palisades Center Drive Thread NY Yonkers I-87 16 Under construction 12/26/2017; operational but inaccessible 3/30/2018; open 7/2/2018 7/2/2018 Archer Street Garage, Ridge Hill Thread NY Yorktown Heights TSP 10 Construction mostly complete 12/30/2018; transformer installed 4/11/2019; operational 6/13 6/13/2019 3303 Crompond Road Thread OH Cambridge I-40 8 Tesla says scouting for a site as of 4/13/2017; construction well underway 6/24; operational 7/26 7/26/2017 Sheetz, 2101 Southgate Parkway Thread OH Cincinnati 6 Tesla representative said supercharger would be coming here in presentation to Grove City city council 10/6/2014; under construction on 4/21/2015; awaiting transformer & hookup 5/10; operational 6/5 6/5/2015 Service Center, 9111 Blue Ash Road Thread OH Cincinnati - Marburg Avenue I-71 10 Under construction 10/19/2018; operational 12/22 12/22/2018 Meijer, 4825 Marburg Avenue Thread OH Columbus I-670 10 Franklin County Convention Facilities Authority considering Tesla proposal as of 2/27/2018; under construction 1/1/2019; transformer and meter installed 2/5; operational 2/14 2/14/2019 70 East Goodale Street Thread OH Columbus - Polaris Parkway I-71 10 Construction starting 4/5/2019; transformer installed 5/1; meter installed 6/14; operational 6/21 6/21/2019 1177 Polaris Parkway Thread OH Dublin I-270 8 Under construction 4/2/2018; awaiting transformer / hookup 7/5; transformer installed 8/8, awaiting power on / testing; tested 9/13, awaiting voltage adjustment from AEP; operational 9/15 9/15/2018 6175 Sawmill Road Thread OH Mount Gilead I-71 8 operational 12/16/2016 12/16/2016 6200 State Route 95 Thread OH Sandusky OH-2 10 Under construction 6/20/2018; transformer installed while construction continues 6/25; operational 7/3 7/3/2018 4702 Milan Road Thread OH Sheffield I-90 8 Site agreement reportedly in place as of 12/5/2017; construction well underway 12/14; transformer installed 12/22; operational 2/9 2/9/2018 Sheetz, 5295 Detroit Road Thread OH Strongsville I-80 8 Planning application under review October 2017; under construction 12/4; transformer installed 1/25/2018; operational 2/9 2/9/2018 Sheetz, 9037 Pearl Road Thread OH Toledo I-75 10 Building permit and certificate of zoning approved 6/28/2017; construction imminent 9/22; under construction 9/23; awaiting transformer & hookup 11/2; transformer installed 11/4, awaiting meter installation; meter installed 11/9, awaiting power on / testing; operational 11/24 11/24/2017 Meijer, 1500 East Alexis Road Thread OH West Cincinnati I-74 12 Permit application submitted 10/27/2017; under construction 1/17/2018; transformer installed while construction continues 2/18; meter installed, awaiting testing 4/11; operational 4/13 4/13/2018 Meijer, 6550 Harrison Road, Cincinnati Thread OK Ardmore I-35 Sources says this is coming "in the first two months of 2015"; Ardmore city official confirms it is in permitting 12/23/2014; permit issued 2/2/2015; pavement markings found 2/7; under construction 2/24; testing 3/11; operational 3/13 3/13/2015 Interurban Classic Grill, 322 Holiday Drive Thread OK Catoosa I-44 8 Lease approved 10/28/2015; under construction 5/16/2016; awaiting transformer & hookup 6/22; transformer installed 7/12; operational 7/20 7/20/2016 Cherokee Hard Rock Hotel & Casino, 777 West Cherokee Street Thread OK Oklahoma City I-40 8 Perry OK contractor reported that they will build Oklahoma City supercharger next, permit pending as of 3/13/2015; permit BLDC-2015-01023 issued 3/24/2015; construction began 6/2; awaiting transformer and hookup 7/14; transformer installed 7/26, waiting for meter and hookup; operational 7/31 7/31/2015 Outlet Shoppes, 322 Outlet Shoppes Drive Thread OK Perry I-35 6 Supercharger permit approved by city council 12/15/2014; construction began 3/6/2015; transformer installed 4/8; operational 4/15 4/15/2015 west of Mobil station, 2812 Fir Street Thread OK Weatherford I-40 Under construction 2/24/2015; construction mostly complete 3/6; testing 3/11; operational 3/11 3/11/2015 Lucille's Roadhouse, 1301 North Airport Road Thread OR Baker City I-84 8 In permitting as of 5/15/2015; under construction 5/31; transformer in place 6/7 but construction still continuing; construction nearly complete 6/21; operational 6/25 6/25/2015 Best Western, 1 Sunridge Lane Thread OR Bandon US-101 8 Tesla planning site as of 6/27/2016; permits 194-16-001441-STR and 194-16-001442-ELEC submitted for review 7/26; permits issued 9/13, 9/15; construction underway 9/20; awaiting transformer & hookup 10/29; operational 11/4 11/4/2016 44 Michigan Avenue NE Thread OR Bend US-97 8 construction well underway 5/19/2016, awaiting transformer 6/7; transformer delivered 6/13; operational 6/17 6/17/2016 Fred Meyer, 61535 S Hwy 97 Thread OR Klamath Falls US-97 8 Permits 483-16-003505-ELEC-01 and 483-16-003505-STR submitted for review 11/15/2016; permits ready to issue 12/16; permits issued 1/10/2017; construction confirmed by inspection 2/9; operational 3/18 3/18/2017 1401 Washburn Way Thread OR Lincoln City US-101 8 Permit 519-16-001698-ELEC ready to issue 6/27/2016; construction began 7/13, passed final inspections 8/3; operational 8/18 8/18/2016 1500 SE East Devils Lake Road Thread OR Pendleton I-84 Sources say this is coming as of 3/25/2015; under construction 4/24; construction nearly complete 5/10; waiting for transformer 5/18; operational 5/28 5/28/2015 Wildhorse Resort & Casino, 46510 Wildhorse Blvd. Thread OR Sandy US-26 8 Construction well underway 10/1; waiting for transformer / hookup 10/21; operational 11/4 11/4/2015 Fred Meyer, 16625 SE 362nd Avenue Thread OR Seaside US-101 8 Permit issued 5/31/2016; construction mostly complete 6/27; operational 7/1 7/1/2016 Seaside Factory Outlet Mall, 1111 North Roosevelt Drive Thread OR Tigard I-5 10 Under construction 4/18/2018; operational 5/7 5/7/2018 9585 SW Washington Square Road Thread PA Altoona I-99 8 Under construction 10/25/2018; awaiting transformer & hookup 12/11; operational 12/31 12/31/2018 Super Sheetz, 1915 Pleasant Valley Blvd Thread PA Bellefonte I-99 8 Construction beginning 9/28/2017; awaiting transformer & hookup 10/24; transformer installed 12/8; meter installed 12/9; operational 12/14 12/14/2017 Weis Market, 170 Buckaroo Lane Thread PA Bloomsburg I-80 8 Construction appears complete 9/22/2016; not operational 9/26; operational 10/14 10/14/2016 Ruby Tuesday, 11 Ricky Street Thread PA Breezewood I-76/I-70 8 Under construction 5/29/2017; awaiting transformer & hookup 6/28; transformer installed 7/13; connected and tested 8/2 but utility needs to fix power quality problems; operational 8/25 8/25/2017 Sheetz, 16417 Lincoln Highway Thread PA Carlisle I-81 8 Under construction with transformer installed 9/1/2017; operational 9/30 9/30/2017 Sheetz, 1720 Harrisburg Pike Thread PA Erie I-90 8 Tesla says that a location has been chosen 12/6/2014; on Coming Soon map released 12/18/2014; Tesla says actively working on a site as of 10/26/2015; building permits in process as of 1/21/2016; construction started 4/18; transformer installed 5/18; operational 6/3 6/3/2016 Hilton Garden Inn, 2225 Downs Drive Thread PA Falls Creek I-80 8 Under construction 6/28/2017; transformer installed 7/15, connected to grid 7/18, awaiting testing; operational 8/2 8/2/2017 Sheetz, 1867 Rich Highway Thread PA Harrisburg I-83 8 Tesla says actively working on a site as of 10/26/2015; found under construction 4/10/2016; transformer installed 4/21; construction mostly complete 4/29; testing 5/4; operational 5/9 5/9/2016 near Weis Market, 3915 Union Deposit Road Thread PA Hermitage I-80 8 Construction mostly complete 8/4/2017; operational 9/5 9/5/2017 Sheetz, 2381 South Hermitage Road Thread PA Irwin I-76 8 Construction beginning 7/15/2017; operational 9/21 9/21/2017 Sheetz, 7821 US-30 Thread PA Moosic I-81 8 Under construction 12/1/2016; operational 1/5/2017 1/5/2017 Shoppes at Montage, 1035 Shoppes Blvd Thread PA Philadelphia I-676 10 Construction mostly complete 12/9/2018, awaiting transformer & hookup; operational 12/20 12/20/2018 420 North 20th Street Thread PA Philadelphia - East Market Urban 6 Under construction 5/19/2019; operational 5/26 5/26/2019 1118 Market Street Thread PA South Whitehall (Allen Town) 8 in contractor bidding process 3/1/2014; permit changes 4/4/2014; Planning Board recommended for approval 7/16; preliminarily approved 8/4; Board of Commissioners approval 8/11; site apparently scrapped by Tesla because of utility connection issues 12/4; in zoning appeals process at new site 8/14/2015; zoning hearing delayed because finalized lease agreement needed 8/26; Tesla cleared to proceed because no zoning relief required 9/23; construction started 12/4; transformers installed as of 1/3/2016 but construction work remains; connecting to grid 1/19; operational 1/21 1/21/2016 4650 Broadway, Allentown Thread PA Tannersville 8 Tesla spokesperson claims ground breaking soon as of 9/25/2015; Simon Premium Outlets confirmed superchargers are coming 10/10, said they hope to have them open in November; construction appears complete 12/5; operational 12/14 12/14/2015 The Crossings Premium Outlets Thread PA Wexford I-79 8 Early stage of construction 8/16/2017; operational 9/20 9/20/2017 Sheetz, Nicholson Road at Wexford Bayne Road Thread PA York I-83 8 Equipment staged at potental site 6/4/2018; operational 7/31 7/31/2018 Sheetz, 160 Leader Heights Road Thread SC Columbia I-77 8 On "Coming Soon" map updated 12/18/2014; Tesla says to break ground mid-August 2016; operational 11/15 11/15/2016 Hilton Garden Inn, 8910 Farrow Road Thread SC Florence I-95 18 Operational 10/21/2017 10/21/2017 2701 David H. McLeod Blvd Thread SC Greenville I-85/I-385 8 in permitting as of 4/10/2014; contractor bids due 5/2/2014; permit approved 5/6/2014; construction began 5/12/2014; lawsuit halted construction - hearing in October; alternate site selected as of 11/21 and is in permitting process; lawsuit trial scheduled for August 24 2015; construction to begin soon at alternate site as of 7/13/2015; remaining equipment at old site removed 7/20; in permitting process as of 9/2; permit 15-2189 issued 9/4; construction equipment staged on site 9/23; under construction 9/26; construction complete with transformer installed 10/20, awaiting hookup & testing; connected to the grid 11/3; operational 11/9 11/9/2015 106 Carolina Point Parkway Thread SC Myrtle Beach US-17 5 Permit application on 9/15/2016 agenda of Community Appearance Board; permit approved by Board with minor modifications 9/15; contractor waiting for approval from Tesla to begin construction 1/19/2017; construction started 2/21; construction appears complete with transformer installed 3/10; passed inspection, awaiting power on / testing 3/15; operational 3/24 3/24/2017 Coastal Grand Mall, 2000 Coastal Grand Circle Thread SD Custer US-16 8 Permit reportedly issued as of 1/8/2018; under construction 3/22; operational 5/11 5/11/2018 Lynn's Dakota Mart, 800 Mount Rushmore Road Thread SD Oacoma I-90 8 Under construction 9/25; operational 10/16 10/16/2017 Al's Oasis, 1000 East South Dakota Highway 16 Thread SD Sioux Falls I-29 8 Permit application submitted 7/26/2017; under construction 9/2; awaiting transformer & hookup 10/13; operational 10/30 10/30/2017 Hy-Vee, 1900 South Marion Road Thread SD Spearfish I-90 6 Construction complete 10/24/2017; operational 10/29 10/29/2017 3275 Old Belle Road Thread SD Wall I-90 8 To be built after tourist season as of 7/30/2018; under construction 5/14/2019; operational 6/5 6/5/2019 407 Main Street Thread TN Bristol I-70/I-77 8 In early stages of construction 5/27/2017; transformer and meter installed and connected to the grid 6/3; operational 6/17 6/17/2017 Sheetz, 2101 Southgate Parkway Thread TN Cookeville I-40 8 Under construction 7/15/2017' operational 10/23 10/23/2017 Jackson Plaza Mall Thread TN Dickson I-40 8 Under construction 8/10/2017; transformer installed while construction continues 9/1; awaiting power on / testing 9/17; operational 9/20 9/20/2017 Holiday Inn Express, 100 Barzani Blvd Thread TN Jackson I-40 8 Reported to be coming after Memphis as of 8/4/2016; contruction reportedly mostly done 11/6; transformer & meter installed 11/13, awaiting testing; operational 11/30 11/30/2016 Casey Jones Village, 50-56 Casey Jones Lane Thread TN Knoxville I-75/I-40 Under construction as of 5/1/2015; transformer in place 5/16; awaiting testing 5/22; operational 5/27 5/27/2015 11038 Parkside Drive Thread TN Manchester I-24 10 Construction mostly complete 3/24/2018; operational 7/2 7/2/2018 2224 Hillsboro Blvd Thread TN Memphis I-40 8 Encroachment variance applied for 7/25/2016; utility markings at site 9/12; equipment staged at site 10/4; under construction 10/6; awaiting transformer & hookup 10/28; transformer installed 11/8; operational 11/30 11/30/2016 1203 Ridgeway Road Thread TN Nashville I-65 looking for site as of 9/3/2014; on Coming Soon map released 12/18/2014; construction apparently complete 6/26/2015; operational 7/8/2015 7/8/2015 1641 Westgate Circle Thread TN Nashville - Thompson Lane I-24 12 Under construction 9/24/2019; pedestals and transformer installed 11/21; operational 11/22 11/22/2019 61 Thompson Lane Thread TX Amarillo I-40 8 site may have been misunderstanding between HPWC and superchargers - no permit activity as of 8/23/2015; permit found 9/23; construction began 9/29; waiting for transformer and hookup 10/20; transformer installed 10/30; meter installed 11/3, waiting for inspection / power on; operational 11/5 11/5/2015 Holiday Inn, 8271 West Amarillo Boulevard Thread TX Arlington I-30 10 Agreement with Tesla approved by city council 6/7/2016; pavement markings at site 9/17; construction began 2/15; transformer installed (but no meter) while construction continues 3/13; meter installed 4/18; operational 4/22 4/22/2017 Convention Center, 1200 Ballpark Way Thread TX Austin I-35 Exemption review completed 11/7/2016; site plan approved 2/8/2017; pavement markings & flags on site 3/31; construction began 4/13; construction resumed 8/2 after hiatus; awaiting transformer & hookup 9/6; transformer installed 9/25; meter installed 11/7; awaiting power on / testing 11/14; operational 11/30 11/30/2017 HEB, 6406 N Interstate Highway 35 Service Road Southbound Thread TX Austin - Stonelake Blvd I-35 18 Permit applications submitted 11/19/2018; permits issued 4/15; under construction 4/22; transformer installed, awaiting power on / testing 8/20; operational 8/28 8/28/2019 9800 1/2 Stonelake Blvd Thread TX Burleson I-35W Tesla called for pavement markings 3/13/2018; call for pavement markings because of imminent digging 5/20/2019; under construction 5/18; transformer installed while awaiting pedestals 9/7; pedestals installed 10/27; testing 12/12; operational 12/15 12/15/2019 3313 Interstate 35W Thread TX Childress US-287 8 Under construction 10/17/2016; operational 10/19 10/19/2016 1300 Avenue F NW Thread TX Cisco I-20 8 On 1/18/2016 Tesla said coming in the first half of 2016; lease agreement signed as of 3/21; construction starting 5/19; transformer installed 7/17, awaiting testing; operational 8/19 8/19/2016 Flying J, 16851 Interstate Highway 20 Thread TX Dallas US-75 10 Superchargers part of The Hill shopping center redevelopment as of 2/2/2017; under construction 1/23/2018; transformer installed 4/3; operational 4/18 4/18/2018 Treehouse, N Central Expressway at Walnut Hill Lane (NE corner) Thread TX Denton I-35 6 All permitting reviews except planning completed by 11/13/2014; planning review completed 11/20; next step is pre-application conference; out for contractor bid as of 5/6/2015; permit processing due to be complete 6/26; will be out for contractor bids 6/29; permit approved 7/31; construction began 10/2; awaiting testing 10/30; operational 11/3 11/3/2015 2710 West University Drive Thread TX El Paso I-10 8 Permit BCSN17-00002 under review as of 1/14/2017; under construction 3/16; transformer installed while construction continues 4/6; operational 4/22 4/22/2017 6401 Desert Blvd Thread TX Flatonia I-10 8 Site agreement signed as of 1/2/2017; under construction 4/22/2017; awaiting power on / testing 4/30/2017; operational 5/13 5/13/2017 Amigo's Travel Center, NE corner of FM609 and I-10 Thread TX Fort Stockton I-10 8 Sources say coming soon as of 11/22/2016; permit found 12/1; call for utility markings 10/24/2017; permit cancelled; permit ready to issue at a new location 4/17/2018; call for pavement markings at two locations 5/17/2018; permit issued as of 8/13, construction started 9/4; transformer installed while construction continues 9/13; awaiting power on / testing 9/22; operational 10/14 10/14/2018 Flying J, 2571 North Front Street Thread TX Fort Worth - Whitmore Street I-30 16 Permit application submitted 3/26/2018; under construction 10/14; awaiting transformer & hookup 12/2; operational 12/10 12/10/2018 2616 Whitmore Street Thread TX Giddings US-290/US-77 Tesla called for pavement markings 6/25/2018; TDLR filing 4/25/2019; under construction 6/25; pedestals installed with transformer energized 10/1, awaiting testing; operational 10/19 10/19/2019 CEFCO, 3025 East Austin Street Thread TX Henrietta US-287 8 Tesla has discussed sites with Planning Department as of 10/25/2016; Under construction 5/20/2019; transformer installed 7/22; pedestals installed 9/25; awaiting testing 10/3; operational 10/5 10/5/2019 237 US-287 Frontage Road Thread TX Houston I-45 Found under construction 6/22/2015; operational 7/9 7/9/2015 Service Center, 14810 North Freeway Thread TX Houston - Northwest Freeway US-290 8 Building permit submitted 2/14/2018; under construction 4/18; transformer installed 7/24; connected to grid 8/14; operational 8/18 8/18/2018 14620 Northwest Freeway Thread TX Italy I-35 8 Under construction 9/2/2017; operational 9/24 9/24/2017 1021 Dale Evans Drive Thread TX Junction I-10 8 Construction complete 11/3/2016; transformer installed 11/22; power connected 12/16, awaiting testing; operational 1/5/2017 1/5/2017 Chevron, 2415 North Main Street Thread TX Kingsville US-77 8 construction complete, awaiting transformer & hookup 10/20/2016; operational 11/15 11/15/2016 Holiday Inn Express, 2400 South Highway 77 Thread TX Laredo I-35 8 Operational 12/11/2017 12/11/2017 Embassy Suites, 110 Calle del Norte Drive Thread TX Lindale I-20 Site selected as of 11/20/2015; construction to begin March or April 2016; under construction 4/2; transformer installed, awaiting power on and testing 4/21; operational 6/8 6/8/2016 Collin Street Bakery, 17044 I-20 Thread TX McAllen US-83 8 Plans submitted for review 3/30/2017; plans approved 4/11; permit CMM2017-01891 issued 5/5, passed foundation inspection 5/18; transformer installed 7/22; operational 7/27 7/27/2017 Fairfield Inn & Suites, 2571 I-10 Service Read Thread TX Midland I-20 Owner of truckstop says supercharger agreement in place as of 3/21/2016; operational 12/24 12/24/2016 3001 Antelope Trail Thread TX Nacogdoches US-59 8 Under construction 9/11/2017; transformer installed while construction continues 9/17; awaiting power on / testing 9/21; operational 9/22 9/22/2017 2615 North Stallings Drive Thread TX Ozona I-10 8 Rumors say this will be a site as of 11/17/2016; confirmed under construction 11/22; construction mostly complete with transformer & meter installed 1/2/2017; operational 1/19 1/19/2017 Best Western, 1307 Avenue A Thread TX Pecos I-20 8 Call for utility markings 10/24/2017; construction well underway 10/1/2018; transformer installed 10/5, awaiting meter; operational 10/14 10/14/2018 Flying J, 100 East Pinehurst Street Thread TX Plano I-35 12 Permit BLD17-18194 applied for 11/2/2017; under construction 1/26/2018; operational 3/30 3/30/2018 Shops at Town Center, 5725 Legacy Drive Thread TX Richmond I-69 8 Under construction 9/30/2018; transformer installed, awaiting power on / testing 12/13; operational 12/17 12/17/2018 20500 Southwest Freeway Thread TX San Antonio I-10 10 Permit 2454033 applied for 2/7/2019; all but tree review approved 3/7; under construction 7/9; transformer installed 8/13; meter installed 8/20; operational 8/22 8/22/2019 Huebner Oaks, 11745 Interstate Highway 10 West Thread TX Shamrock I-40 6 On Coming Soon map released 12/18/2014; lease signed November 2014; reported under construction 2/9/2015; construction complete 2/18; operational 2/20 2/20/2015 U-Drop Inn Thread TX Southlake TX-114 10 Special use permit is on Planning & Zoning Commission agenda for 8/17/2017 (detailed plans here); approved by Planning & Zoning Commission 9/21; approved by City Council 10/3; permit issued 11/21; utilities marked 12/4; construction began 1/9/2018; transformer installed 2/26; meter installed 4/16; operational 4/18 4/18/2018 Southlake Town Square, 1240 Main Street Thread TX Sulfur Springs I-30 8 City council passed lease agreement 1/5/2016; construction under way 5/6; awaiting transformer & hookup 6/17; operational 6/29 6/29/2016 300 block of Tomlinson Thread TX Sweetwater I-20 8 On 2015 map released 12/18/2014; on 1/18/2016 Tesla said coming in the first half of 2016; site selected and approaching construction phase as of 2/27; permitting in progress as of 4/3; permitting process apparently complete 4/12; construction started 6/11; construction complete 8/1, awaiting transformer & hookup; operational 8/19 8/19/2016 Holiday Inn Express, 300 SE Georgia Avenue Thread TX Texarkana I-30 8 Permit application reportedly under review 9/21/2016; under construction 12/5; operational 12/21 12/21/2016 Olive Garden, 3101 Mall Drive Thread TX Three Rivers I-37 Mentioned in article dated 8/10/2016; awaiting transformer & hookup 8/21; transformer & meter installed 9/15, awaiting testing & power on; operational 9/30 9/30/2016 Love's Travel Center, 2645 S. Hwy 37, I-37 Exit 72 Thread TX Van Horn I-10 8 Sources say coming soon as of 11/20/2016; City confirms that permit has been applied for 12/2; under construction 12/27; complete and awaiting testing 1/29/2017; operational 2/17 2/17/2017 Hampton Inn, 1921 Frontage Road Thread TX Victoria US-59/US-87 Site on September building report dated 9/21/2015; construction well underway 12/12; operational 12/30 12/30/2015 3107 South Laurent St Thread TX Webster I-45 Under construction 4/18/2019; awaiting testing 9/12; operational 9/19 9/19/2019 1141 South Kobayashi Drive Thread UT Price US-191 8 Reportedly out for contractor bid 3/6/2015; contractor award delayed as of 4/20; conditional use permit approved ~6/26; construction to begin soon as of 9/16; operational 10/16 10/16/2015 Holiday Inn Express, 925 Westwood Boulevard Thread UT Salt Lake City I-80/I-15 10 Construction started 2/18/2015; operational 3/6 3/6/2015 Tesla Service Center, 2312 South State Street Thread UT Tremonton I-15/I-84 Bid awarded to contractor 2/10/2015; operational 4/1/2015 4/1/2015 Hampton Inn, 2145 West Main Street Thread UT Tooele I-80 6 County official said supercharger was coming as of November 2014; approved by county planning & zoning 12/16; under construction 2/4/2015; mostly complete 2/18; operational 2/24 2/24/2015 1568 East Saddleback Blvd. Thread VA Arlington I-66 16 Permit application ZADM180559 approved 7/27/2018; under construction 12/5; operational 4/18/2019 4/18/2019 Market Commons, 2800 Clarendon Blvd, 5th floor of garage Thread VA Charlottesville I-64 8 Tesla says coming within the next year as of 3/16/2015; permit B201700323NC applied for 2/9/2017; under construction 6/6; awaiting meter and power on 6/29; meter installed 9/2; operational 9/7 9/7/2017 Hyatt Place, 2100 Bond Street Thread VA Chester I-95/VA-288 8 Construction mostly complete as of 9/7/2017; transformer installed 9/13; operational 9/20 9/20/2017 Wawa, 11701 Jefferson Davis Highway Thread VA Fredericksburg I-95 8 Permit application ST17-0033 submitted for review 9/25; clearing & grading permit approved as of 12/2; under construction 2/10/2018; transformer installed 4/6; operational 4/11 4/11/2018 Wawa, 10060 Jefferson Davis Highway Thread VA Haymarket I-66 8 Permit issued as of 10/18/2018; awaiting transfomer / hookup 12/14; operational 12/19 12/19/2018 Sheetz, 15315 Washington Street Thread VA Leesburg VA-7 12 Under construction 2/19/2019; transformer installed 7/3; operational 7/19 7/19/2019 1602 Village Market Blvd Thread VA Lexington I-81/I-64 Tesla says coming within the next year as of 3/16/2015; plans submitted for permitting ~11/9; permit issued 11/23; under construction 11/29; operational 12/16 12/16/2015 Holiday Inn Express, 880 North Lee Highway Thread VA Mount Jackson I-81 8 Construction mostly complete 10/16/2017; awaiting transformer & hookup 11/8; operational 12/4 12/4/2017 Sheetz, 227 Conicville Road Thread VA Newport News I-64 12 Under construction 8/1/2019; pedestals installed 10/23; operational 11/14 11/14/2019 12300 Jefferson Avenue Thread VA Norfolk I-64 6 In permitting as of 4/23/2015; Nashville installation crew to go here ~7/1; construction began 7/8; construction complete 7/29 but awaiting 450 foot connection to the grid; connecting to the grid 8/4; planned power outage needed to complete grid connection as of 8/11; operational 8/13; temporarily closed 8/14; will likely remain closed "for at least a few more weeks" as of 8/27; transformer turned on but chargers still off 9/28; operational 10/17 10/17/2015 5900 East Virginia Beach Boulevard Thread VA Richmond I-64 8 Sources say coming soon as of 10/12/2017; under construction 10/30; operational 12/19 12/19/2017 Hyatt, 4401 South Laburnum Avenue? Thread VA Salem I-81 8 Under construction 5/13/2019; transformer installed 6/26; pedestals installed 10/26; awaiting testing 11/7; operational 11/15 11/15/2019 Sheetz, 1340 West Main Street Thread VA Springfield I-95 18 Permit 173030246 submitted for review 10/30/2017, approved 4/3/2018; under construction 4/17; awaiting transformer 5/10; transformer installed 6/7; operational 6/21 6/21/2018 Springfield Town Center, 6500 Springfield Mall Thread VA Staunton I-64/I-81 8 Under construction 12/20/2018; operational 1/30/2019 1/30/2019 1250 Richmond Avenue Thread VA Strasburg I-81 6 Approved by planning commission 4/29/2015; construction started ~7/7; transformer installed 8/19; to be tested 9/1; operational 9/2 9/2/2015 Denny's, 119 Hite Lane Thread VA Wytheville I-81/I-77 Tesla says coming within the next year as of 3/16/2015; Tesla says will be permitted soon and started in 2015 as of 9/25; plans submitted for permitting ~11/9; permit issued 11/24; reportedly under construction 12/14; energized and ready for testing 12/23; operational 12/30 12/30/2015 Holiday Inn Express, 165 Malin Drive Thread VT Berlin I-89 8 Approved by Development Review Board 6/21/2016; Under construction 8/30/2016 10/3/2016 159 Paine Turnpike NorthThread VT Brattleboro I-91 8 Tesla reportedly looking for site 7/7/2014; construction well underway 11/29; awaiting transformer and hookup 12/23; transformer to be installed ~1/12/2015; operational 1/16 1/16/2015 Price Chopper Plaza, 499 Canal Street Thread VT South Burlington I-89 8 Reportedly coming as of 12/12/2014; in permitting 6/2/2015; approved by Development Review Board 7/14; waiting for one more permit approval, construction began 9/29; transformer in place 10/22; operational 11/4 11/4/2015 222 Dorset Street Thread WA Aberdeen US-101 Superchargers to be part of upcoming Gateway Center development as of 9/6/2016; construction well underway 10/18; transformer installed while construction continues 11/5; operational 12/21 12/21/2016 107 South F Street Thread WA Arlington I-5 16 Construction complete 6/17/2017, awaiting transformer; transformer installed 6/22, awaiting testing, operational 6/27 6/27/2017 Angel of the Winds Casino, 3438 Stoluckquamish Lane Thread WA Auburn WA-18/WA-167 8 Permit application TEN19-0006 submitted 1/17/2019; permit approved 3/12, issued 5/13; under construction 5/28; pedestals installed 10/10; operational 10/22 10/22/2019 1101 Outlet Collection Way SW Thread WA Blaine I-5 12 Under construction 5/15/2019; pedestals installed 10/2, awaiting transformer; operational 10/11 10/11/2019 81 Birch Bay Square Street Thread WA Cle Elum I-90 12 Construction mostly complete 11/20/2018; operational 12/8 12/8/2018 811 WA-970 Thread WA Issaquah I-90 8 Construction starting 11/5/2017; site abandoned 3/27/2018; construction restarted 8/20; awaiting transformer 9/22; operational 10/19 10/19/2018 Fred Meyer, 6100 East Lake Sammamish Parkway Thread WA Kennewick I-82 8 Found under construction 8/4/2015; mostly complete and awaiting testing and power on 8/25; operational 9/4 9/4/2015 Fred Meyer, 2811 West 10th Avenue Thread WA Leavenworth US-2 8 Tesla says a site is planned here as of 3/31/2017; permit 3033128E application submitted 6/1/2018; under construction 6/7; transformer installed while construction continues 6/25; awaiting power on / testing 6/29; operational 7/28 7/28/2018 Dan's Market, 1329 US-2 Thread WA Lynnwood I-5/I-405 10 Construction starting 11/4/2017; transformer installed 1/9/2018; operational 1/19 1/19/2018 Fred Meyer, 2902 164th Street SW Thread WA Monroe US-2 12 Under construction 3/21/2017; awaiting transformer 3/28; transformer installed 4/13; operational 4/25 4/25/2017 Fred Meyer, 18805 US-2 Thread WA Seattle I-5 20 Permit 6685741-EL applied for as of 1/3/2019; permit issued 4/5; under construction 5/12; operational 7/8 7/8/2019 601 Union Street Thread WA Sequim US-101 8 Beginning construction 6/8/2017; awaiting power on / testing 6/30; operational 7/4 7/4/2017 Holiday Inn Express, 1441 East Washington Street Thread WA Vancouver I-5 12 Under construction 10/27/2017; transformer & meter installed 12/5, awaiting testing; operational 2/12/2018 2/12/2018 Fred Meyer, 800 NE Tenney Road Thread WI Howard I-41 8 Site selected as of 2/20/2017; under construction 6/26; awaiting testing 8/29; operational 9/8 9/8/2017 Meijer, SE corner of Shawano Ave & I-41 Thread WI Lake Geneva US-12 6 Under construction 7/2/2019; awaiting transformer 8/20; transformer installed, awaiting pedestals 9/13; operational 9/26 9/26/2019 7035 Grand Geneva Way Thread WI Madison II I-90/I-94 Plans submitted for review as of 9/25/2017; under construction 10/21; transformer installed 11/22, awaiting power on / testing; operational 12/19 12/19/2017 Hy-Vee, 3801 East Washington Avenue Thread WI Oak Creek Plans submitted to Plan Commission for approval 8/8/2017; equipment staged at site 9/27; under construction 9/30; awaiting transformer 11/15; operational 1/25/2018 1/25/2018 Meijer, 171 West Town Square Way Thread WI Oshkosh I-41 6 Plans presented to council with recommendation to approve 10/10/2017; operational 12/20 12/20/2017 Festival Foods, 2415 Westowne Avenue Thread WI Sheboygan I-43 8 Conditional use permit application submitted, under review 4/28/2015; construction began 8/17; construction appears complete with transformer installed 10/4; operational 10/7 10/7/2015 Festival Foods Market, 595 South Taylor Drive Thread WI Wausau 4 Tesla says site will be selected soon as of 8/2/2016; Stettin Town Board set to approve 2-year temporary site 8/22; temporary site operational 11/24 11/24/2016 S 22nd Avenue and Corporate Drive Thread WI Wausau Construction mostly complete with transformer installed as of 9/4/2017; operational 10/6 10/6/2017 Hilton Garden Inn, 2101 North Mountain Road Thread WV Charleston I-64/I-77 Tesla in discussions with site owner(s) as of 2/26/2017; site agreement completed 4/4; under construction 4/13; awaiting transformer & hookup 5/14; transformer installed 5/23; operational 6/8 6/8/2017 Courtyard by Marriott, 100 Kanawha Blvd. East Thread WV Huntington I-64 8 Construction started 11/5/2017; transformer installed 12/26; operational 1/11/2018 1/11/2018 Sheetz, 432 18th Street W Thread WV Martinsburg I-81 8 Under construction 8/17/2017; transformer installed 9/21; operational 9/29 9/29/2017 Sheetz, 1465 Edwin Miller Blvd Thread WV Morgantown I-68 8 Reportedly coming as of 10/26/2016; lease agreement signed 12/6; in permitting review 4/3/2017; construction began 5/22; transformer installed 9/2; meter installed 9/6; operational 9/8 9/8/2017 Sheetz, 21 Asturias Lane Thread WV Mount Hope I-64 8 Construction plans have been developed as of 6/29/2017; construction started 8/28; transformer and meter installed 11/15; operational 2/20/2018 2/20/2018 Sheetz, 5481 Robert C. Byrd Drive, Mt Hope WV Thread WV Parkersburg US-50 6 Construction well underway with transformer installed 1/26/2019; operational 3/5 3/5/2019 Sheetz, 1102 7th Street Thread WV Weston I-79 8 In initial stage of construction 6/15/2017; operational 10/2 10/2/2017 Sheetz, 39 Berlin Road Thread WY Evanston I-80 6 City has seen preliminary plans; site agreement not necessarily finalized as of 4/1/2017; permit has been issued as of 5/23; construction complete 6/23, awaiting transformer; transformer installed 7/14, awaiting power on / testing; operational 7/18 7/18/2017 Hampton Inn Thread WY Gillette I-90 4 agreement with Hampton Inn completed 5/28/2015; construction reported begun 8/29; operational 9/24/2015 9/24/2015 Hampton Inn, 211 Decker Court Thread WY Jackson Permit application submitted 4/8/2016; construction started 9/13; awaiting power on and testing 10/7; operational 10/18 10/18/2016 Jackson Whole Grocer & Cafe, 1155 South US Highway 89 Thread WY Laramie I-80 8 Tesla says in early stages of deployment as of 4/13/2017; plans submitted to Planning Division in April; plans approved in June; construction well underway 7/11; construction complete 7/19, awaiting transformer & hookup; operational 8/31 8/31/2017 Fairfield Inn & Suites, 1673 Centennial Drive Thread WY Rawlins I-80 6 Tesla says in early stages of deployment as of 4/13/2017; construction started 7/12; awaiting transformer and hookup 8/12; operational 9/1 9/1/2017 Fairfield Inn & Suites, 2370 East Cedar Street Thread WY Rock Springs I-80 Mall manager says construction should start in spring 2017 as of 1/30/2017; construction almost done as of 6/23; awaiting power on / testing 6/28; connected and tested 7/14 but utility needs to fix power quality problems; operational 8/8 8/8/2017 White Mountain Mall, between Applebee's and Sapporo Restaurant Thread WY Sheridan I-90 4 site selected as of 4/20/2015; construction began 6/15; transformer installation 6/26; ready for inspection 7/1; testing expected week of 7/6-7/10; operational 7/15 7/15/2015 Best Western, 612 North Main Street Thread WY Wheatland I-25 8 Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016; construction reportedly imminent as of 10/11/2017; under construction 4/15/2018; transformer installed 5/14; operational 5/27 5/27/2018 Heartland Inn & Suites, 1556 Sherard Drive Thread AB Canmore 4 summer 2014? Instead of Lake Louise Site selected as of 7/11/2014; permit submitted to city 9/16; construction began 11/6; expected complete 12/15; operational 3/11/2015 3/11/2015 Canmore Rocky Mountain Inn, 1719 Bow Valley Trail AB Edmonton 2/14 8 Construction mostly complete 7/27/2017; operational 8/12 8/12/2017 Southgate Centre Thread AB Fort McLeod Found under construction 8/30/2016; transformer installed, construction continues 9/24; construction complete 10/1, awaiting power on/testing; testing ~11/23; operational 11/24 11/24/2016 569 23 Street AB Red Deer summer 2014? Site selected as of 7/11; city planning department told Tesla no permit is required (reported 10/3). Operational 1/22/2015 1/22/2015 Sheraton Red Deer Hotel, 3310 50 Avenue AB Rocky View 2 8 Construction mostly complete 2/15/2017; transformer installed 2/28; operational 3/14 3/14/2017 CrossIron Mills Outlet Mall Thread BC Golden 4 Instead of Lake Louise Site selected as of 7/11; permitting in progress 9/22; permit has been issued 11/12; construction underway 12/5; operational 2/4/2015 2/4/2014 Golden Travelodge, 1200 12th Street North BC Kelowna On Tesla's 2015 list? Location confirmed by hotel 10/15, under construction 10/28; construction complete and waiting for transformer 11/13; transformer installed 12/16; transformer energized, awaiting testing 12/24; operational 12/20 12/30/2015 Best Western, 2402 Highway 97 Thread BC Merritt 5 8 On Tesla's 2015 list? Under construction 9/30/2016 1/27/2017 Best Western Plus near Husky Travel Centre Thread BC Nanaimo BC-19 6 On Tesla's 2015 list? Found with construction mostly complete 6/2/2017; operational 7/20 7/20/2017 Woodgrove Centre Thread BC Revelstoke 4 summer 2014? Site selected as of 7/11; approved by city council 9/16; construction started ~11/21; operational 12/30 12/30/2014 Best Western Plus, 1925 Laforme Blvd BC Surrey 1 12 construction well underway 9/24/2018; awaiting transformer / hookup 10/2; operational 10/6 10/6/2018 10520 150 Street Thread BC Tsawwasen 17 16 Under construction 11/19/2017; operational 12/1 12/1/2017 5000 Canoe Pass Way, Delta Thread BC Vancouver - Howe Street 1 22 construction well underway 11/2/2018; operational 4/27/2019 4/27/2019 799 Robson Street Thread BC Victoria 1 16 construction well underway 11/2/2018; operational 12/9 12/9/2018 3625 Douglas Street Thread BC Whistler 99 10 Operational 1/28/2018 1/28/2018 Fairmont Château, 4599 Chateau Blvd Thread NB Aulac 2 6 Construction began 5/30/2018; awaiting transformer 7/27; testing 8/8; operational 8/10 8/10/2018 Irving, 170 Aulac Road Thread NB Lincoln 2 8 Under construction 11/6/2018; operational 12/21 12/21/2018 415 Nevers Road Thread NB Quispamsis 1 6 Site agreement reportedly in place as of 7/25/2018; under construction 5/22/2019; pedestals installed 10/1; operational 10/7 10/7/2019 Irving, 8 Millennium Drive Thread NB Saint Leonard 1 8 Operational 2/20/2019 2/20/2019 415 Nevers Road Thread NB Salisbury 2 6 Site agreement reportedly in place as of 7/25/2018; under construction 5/4/2019; pedestals installed 9/24; connected to grid 10/3, awaiting testing; operational 10/7 10/7/2019 Irving, 2986 Fredericton Road? Thread NB Woodstock 1 6 Site agreement reportedly in place as of 7/25/2018; under construction 5/24/2019; transformer installed 6/26; pedestals installed 9/19; operational 10/9 10/9/2019 Irving Big Stop Thread NS Enfield 1 6 Contractor said they have the contract to build the superchargers as of 5/30/2018; construction starting 5/8/2019; awaiting transformer / hookup 6/22; transformer installed 7/2; operational 7/4 7/4/2019 Irving, 6757 Highway 2 Thread ON Barrie 8 summer 2014? Awaiting approval of amendment to site plan 11/14; Tesla says construction started 12/15; construction mostly complete 1/3, awaiting utility transformer; now operational 20 South Village Way - Target parking lot ? Post ON Barrie II 400 20 Construction well underway 10/22/2017; awaiting transformer & hookup 11/24; operational 12/7 12/7/2017 456 Bayfield Street Thread ON Belleville 401 20 Under construction 4/6/2018; transformer installed 5/20; testing 6/6; operational 6/8 6/8/2018 Quinte Mall, 390 North Front Street Thread ON Burlington 407 16 Under construction 5/9/2018; operational 6/17 6/17/2018 Mapleview Mall, 900 Maple Avenue Thread ON Cambridge 401 14 Construction mostly complete 1/4/2018; awaiting transformer & hookup 1/28; operational 2/1/2018 2/1/2018 SmartCentre, 22 Pinebush Road Thread ON Casselman 417 10 Under construction 11/29/2017; operational 1/19/2018 1/19/2018 Metro, 21 Richer Close Thread ON Comber Tesla says lease negotiations nearly finished 7/1/2014; in permitting process 11/14 and awaiting approval by Ministry of Transportation; Tesla says to break ground soon as of 12/15; under construction 1/17/2015; operational 3/24 3/24/2015 7016-7036 Industrial Drive ON Concord 400 20 Under construction 11/10/2017; awaiting transformer & hookup 12/20; operational 12/21 12/21/2017 Vaughan Mills, 1 Bass Pro Mills Drive Thread ON Etobicoke 407 10 Under construction 11/11/2017; awaiting transformer / hookup 2/3/2018; operational 3/6 3/6/2018 CF Sherway Gardens, 25 The West Mall Thread ON Grimsby Tesla says approaching contruction phase as of 2/21/2016; construction starting 4/18; operational 5/13 5/13/2016 Casablanca Winery Inn, 4 Windward Drive ON Hamilton 403 20 Under construction 11/21/2017; awaiting power on / testing 2/21/2018; operational 4/2 4/2/2018 CF Lime Ridge, 999 Upper Wentworth Street Thread ON Huntsville construction began 7/15/2016; transformer installed 7/29, awaiting power on & testing; operational 9/30 9/30/2016 70 King William Street Thread ON Markham 407 8 Construction started 10/18/2017; transformer installed while construction continues 12/12; operational 1/31/2018 1/31/2018 CF Markville Mall Thread ON Markham (Woodside) I-85 20 Under construction 5/5/2018; operational 6/27 6/27/2018 Smartcentre, 3075 Highway 7 Thread ON Mississauga 401/407 12 SmartCentre spokesperson says coming isoon as of 3/14/2018; city employee says Meadowvale Town Centre and Erin Mills Town Centre as of 5/13; under construction 12/1; operational 1/24/2019 1/24/2019 Smartcentre, 3155 Argentina Road Thread ON North York 401/404 20 Under construction 1/13/2019; transformer installed 4/11; testing 5/1; operational 5/7 5/7/2019 1800 Sheppard Avenue East Thread ON Ottawa Urban Construction mostly done 11/15/2017; operational 11/18 11/18/2017 Rideau Center, 50 Rideau Street Thread ON Owen Sound Sources say coming soon as of 10/12/2017; under construction 10/27; awaiting transformer & hookup 2/27/2018; transformer installed 3/17; operational 3/22 3/22/2018 1555 18th Avenue Thread ON Parry Sound 6 Tesla says will be built summer 2016; Tesla says about to break ground as of 6/27/2016; under construction 7/21; operational 9/2 9/2/2016 292 Louisa Street Thread ON Pickering 401 16 Under construction 10/23/2017; operational 1/12/2018 1/12/2018 SmartCentre, 1899 Brock Road Thread ON Port Hope Tesla says near construction stage as of 10/22/2015; found under construction 12/14; operational 12/20 12/20/2015 Harvey's, Northunberland County Road 28 at 401 ON Sudbury 80 8 Under construction 10/23/2017; transformer installed 12/5; operational 12/20 12/20/2017 SmartCentre Sudbury South near A&W Thread ON Toronto - Bay Street Urban 16 Operational 3/23/2018 3/23/2018 220 Yonge Street Thread QC Baie-St-Paul 362 12 Under construction 11/10/2017; awaiting transformer & hookup 12/2; operational 12/21 12/21/2017 Hotel Germain Charlevoix, 50 Rue de la Ferme Thread QC Brossard 10/30 12 Construction beginning 8/16/2017; operational 10/6 10/6/2017 Alt Hotel, 6000 Boulevard Rome Thread QC Drummondville 20 exit #177 8 Lease finalized, permitting starting as of 6/19/2014; construction began 11/15 (blog post with lots of details in French here); work seems stalled as of 12/13/2014; work resumed as of 01/12 French details here (pics included)... endless waiting... stay tuned... awaiting transformer installation 3/12/2015; opening is near 03/27/2015 details here (in French); operational as of april 8th 4/8/2015 755 BOUL. RENÉ-LÉVESQUE TM coming soon page QC Laval 15/440 20 Plans under review as of 9/29/2017; under construction 10/3' operational 12/31 12/31/2017 Carrefour Laval, 3035 Boulevard le Carrefour Thread QC Lévis 20 10 In Tesla's book for 2015 (probably by the summer); Tesla says will be ready for construction ~8/8/2016; under construction 6/29/2017; awaiting transformer & hookup 8/15; transformer installed 9/26; operational 10/4 10/4/2017 IGA, 1060 Boulevard Guillaume-Couture, Saint-Romuald Thread QC Magog 10 8 Minor zoning approval needed as of 4/6/2016, construction begun 5/4; construction complete 6/6; connected to grid 6/13; operational 6/22 6/22/2016 Avril Magog, 2381 rue Principale Ouest Thread QC Mascouche 25/640 16 Plans under review as of 9/29/2017; under construction 10/3; transformer installed 12/22; operational 12/29 12/29/2017 Smartcentre Mascouche, 65 Montée Masson Thread QC Mont Tremblant 117 8 Under construction 12/5/2017; awaiting power on / testing 12/22; operational 12/27 12/27/2017 Super C, 420 Route 117 Thread QC Pointe Claire 40 20 Coming as of 12/2/2017; under construction 4/24/2018; transformer installed 6/27; operational 6/30 CF Fairview, 6815 Route Transcanadienne Thread QC Rivière-du-Loup 20/132 8 in Tesla's book for 2015; apparently the lease is finalized... Stay tuned; now stated as Permit status on supercharge.info, the site chosen is at the Hôtel Universel (which has already a Sun Country Highway charger) 4/21, pavement markings 6/9/2016, construction began 8/10; operational 9/20 9/20/2016 Hôtel Universel, 311 boul de l'Hôtel de Ville, Rivière-du-Loup, Qc Thread QC Saint-Laurent 10 12 Found under construction 5/3/2016; awaiting transformer & hookup 5/26; transformer installed 6/2; testing 7/11; operational 7/12 7/13/2016 3131 Boulevard de la Côte-Vertu QC Saint-Léonard-d'Aston 1 8 Under construction 12/8/2018; awaiting transformer / hookup 12/18; operational 12/19 12/19/2018 Madrid 2.0, 180 Rang du Moulin Rouge Thread QC Yamachiche 40 8 In permitting as of 8/17/2018; awaiting transformer 10/19; operational 10/30 10/30/2018 La Porte de la Mauricie, 14 Route Sainte-Anne W Thread There is a list of confirmed and completed Supercharger at supercharge.info
Not sure we can really say San Juan Capistrano is permitted. There's an architectural control project in the city's database, but no building permit (that I can find), and I think there needs to be before construction starts.
I just edited and added several stations to the other thread. Hope I didn't mess the protocol up. One in FL shows to be open, but was not on the list. I was led to believe Freemont is open.
Is the "other thread" a wiki of operating Superchargers? If so, I suggest adding a link to it. Also link this thread from the "other" one. GSP
The Yuma, AZ location has been announced. But no news of any work on it yet. This post links to the published article: Yuma AZ Supercharger Here's the link to the article from 8/3/13 in the Yuma Sun. States that Yuma's Design and Historic Review Commission has approved the location: , yuma, new, stations - Business - YumaSun
It might be simpler to have one Supercharger Wiki thread. Once an exact address is confirmed, they can be added as 'under construction'. Rumors of sites can go in various regional forums.
The "other thread" is a wiki of ALL OPERATING and THOSE WITH SIGNIFICANT CONSTRUCTION (verified via photos and addresses). Mod: If you would please link the two threads, that would be great.
The city of Madison, Wisconsin has posted 31 pages of engineering drawings, apparently a permit application for a 6 supercharger station in East Towne Mall. http://www.cityofmadison.com/planning/projects/reports/89etm_site2.pdf It's actually part of a conditional use permit, the comment period for which expires September 18th. City of Madison, Wisconsin - Welcome to the Planning Development Department
Port Orange Florida has 6 stations. Should be officially open early next week. And yea, that's a real rainbow!
Strange to see the charge ports perpendicular to the parking spaces. Usually they are parallel for easier connection. Are the cables here longer?
Cable is the same. It is supposedly for ADA parking but the drivers side would be at the curb. The construction guy said he has to build it per the drawing even if it does not make sense. BTW, this SC is now operational even though it is not officially opened.