StateLocationHwy (Exit)ChargersStatusExpected Open DateNotesThread Link
ARLowellI-498Under construction 1/29/2020
898 West Monroe AvenueThread
AZEhrenbergI-108Tesla sign says coming soon as of 11/11/2019; under construction 11/19; operational 11/2711/27/2019
Flying J, 14320 Frontage Road NorthThread
AZNew RiverI-1710Under construction 12/5/2019; operational 12/2412/24/2019
3906 West New River RoadThread
CAAnaheimI-58Permit application BLD2018-04056 submitted 9/7/2018; permit issued 2/11/2019
440 North Euclid StreetThread
CAAnaheim - Katella StreetI-5/CA-5716Permit BLD2019-03822 issued 10/25/2019; operational 12/2312/23/2019
2404 East Katella AvenueThread
CABerkeleyI-8016Under construction 2/1/2020
3288 Pierce StreetThread
CABishopUS-39512Proposal presented to City Council 8/26/2019; City Council ratified agreement 9/23; permit approved 10/30
151 South Warren StreetThread
CABlytheI-1012Lease agreement in place 10/24/2019
160 South Lovekin BlvdThread
CABuena Park - Beach BlvdI-524Under construction 12/21/2019
6911 Brenner AvenueThread
CACalabasasUS-10124Permit approved 10/2/2017, ready to issue 11/26; crates removed from site 5/20/2019
4799 Commons WayThread
CAChula Vista12512Under construction 10/30/2019
Target, 910 Eastlake ParkwayThread
CADublin - Dublin BlvdI-58010Permit application BLDG-2018-02182 submitted 10/11/2018; permit issued 5/22/2019; under construction 6/1; some pedestals installed 1/26/2020
Target, 2800 Dublin BlvdThread
CAEl CerritoI-8012Under construction 1/20/2020
180 El Cerrito PlazaThread
CAElk GroveI-8012Under construction 1/30/2020
8469 Elk Grove BlvdThread
CAEmeryvilleI-8012Tesla in negotiations with City and mall management as of 4/19/2018; design review approved 5/10; minor design review for new site approved 9/12; under construction 8/11/2019; pedestals installed 1/24/2020
5795 Christie AvenueThread
CAGilroy - Gilroy CrossingUS-10120In permitting as of 7/30/2019
6705 Camino ArroyoThread
CAGoletaUS-10112Under construction 12/28/2019
6975 Marketplace DriveThread
CAHawthorne - El Segundo BlvdI-40518Under construction 11/3/2019; operational 11/2111/21/2019
4427 West El Segundo BlvdThread
CAHuntington BeachI-40512Permit C2017007180 applied for 10/30/2017
7777 Edinger AvenueThread
CAIrvine - Main StreetI-40512Permit 00793338-CPKM applied for 7/23/2019
1970 Main StreetThread
CALarkspurUS-1018Permit issued late December 2019
Bon Air Center, Sir Francis Drake BlvdThread
CALincolnCA-658Under construction 10/3/2019
Target, 950 Groveland LaneThread
CALos AltosUrban16Under construction 2/1/2020
Target, 950 Groveland LaneThread
CALos Angeles - Alameda StreetI-1016Electrical permit 19041-10000-40333 approved 11/26/2019; building permit 19016-10000-31930 approved 12/10
787 South Alameda StreetThread
CAManteca - Spreckels AvenueCA-9912Under construction 10/15/2019; awaiting pedestals 11/7; transformer installed 11/26; cabinets installed 2/8/2020
Target, 280 Spreckels AvenueThread
CAMarin CityUS-10112Permit application filed 3/1/2018; planning commission approved loss of parking spaces 3/25/2019, Board of Supervisors approved 4/17
190 Donahue StreetThread
CAMission ViejoI-510Minor modification MM2019-475 on agenda of Planning and Transportation Committee 9/9/2019
555 Shops BlvdThread
CAMontecitoCA-1018Permit 19ELE-00000-00247 applied for 6/20/2019; permit application resubmitted 11/13; permit approved & ready to issue 12/23
1595 South Jameson LaneThread
CAMoreno ValleyI-215/CA-6020Under construction 10/24/2019; cabinets delivered 1/15/2020; transformer installed 2/5
2755 Canyon Springs ParkwayThread
CANovatoCA-10120Permit B2019-0918 applied for 4/22/2019, approved 6/6/2019, issued 7/2/2019; under construction 10/4; awaiting transformer 12/26
208 Vintage WayThread
CAOakland - Hegenberger RoadI-88016Building permit B1904077 issued, electrical permit E1902050 issued, planning exemption DRX191780 approved as of 10/24/2019
640 Hegenberger RoadThread
CAOakland - Jack London SquareI-88012Building permit B1904081 and electrical permit E1902522 issued 10/1/2019
255 Second StreetThread
CAOlemaCA-16Plans in permit review as of 7/8/2019
10005 Coastal HighwayThread
CAPalmdaleCA-1412On Tesla coming soon sign at Mojave supercharger 12/2/2019; construction started 2/5/2020
Antelope Valley Mall, 1233 Racho Vista BlvdThread
CAPaso RoblesUS-10112Permit application B19-0934 submitted for review December 2019
2449 Golden Hill RoadThread
CARoseville - Roseville ParkwayI-808Under construction 11/4/2019; awaiting power on / testing 1/15/2020; operational 2/152/15/2020
1112 Galleria BlvdThread
CASacramento - Freeport BlvdCA-99/I-58Permit application submitted for review 10/21/2019
4700 Freeport BlvdThread
CASan DimasCA-21016Site reportedly selected as of 9/18/2017
Costco, 520 North Lone Hill Avenue?Thread
CASan FranciscoUS-10116Permit application 1810032159 submitted 10/3/2018; permit approved 7/16/2019
601 Van Ness AvenueThread
CASan Jose - Cottle RoadCA-85/US-10114Permit AD18-957 applied for 12/6/2018
5630 Cottle RoadThread
CASan Jose - Holger WayCA-23718Permit AD19-429 submitted for review 5/6/2019; under construction 11/16; pedestals installed 2/2
95 Holger WayThread
CASan Jose - Tuers RoadUS-10120Under construction 1/1/2020; cabinets installed 2/2
3096 Tuers RoadThread
CASanta BarbaraUS-1018Planning application PLN2019-00551 to screen superchargers approved 11/7/2019; electrical permit BLD2019-06787 ready to issue as of 12/27/2019
3943 State StreetThread
CASanta MonicaCA-124Planning submittal 18PRE-0005 for restaurant & supercharger station in process as of 3/5/2018
1401 Santa Monica BlvdThread
CASanta RosaUS-10120Permit B19-1548 issued as of 7/11/2019; awaiting transformer 9/7/2019; transformer installed 10/3; operational 11/2111/21/2019
380 Coddington CenterThread
CAScotts ValleyCA-1712Under construction 10/4/2019; awaiting testing 1/23/2020; operational 1/301/30/2020
230 Mount Hermon RoadThread
CASouth San FranciscoUS-10116Permit B19-0319 submitted 3/4/2019; permit resubmitted 5/28; permit approved 6/10; under construction 9/4; operational 2/14/20202/14/2020
Embassy Suites, 250 Gateway BlvdThread
CAStocktonI-512Permit BP19-06217 submitted 8/26/2019; plans resubmitted 10/15; permit ready to issue 10/29; under construction 12/16
Hilton, 2323 Grand Canal BlvdThread
CATurlockCA-998Permit created as of 1/16/2020
Target, 3000 Countryside DriveThread
CAVisaliaCA-9924In plans for new hotel / truck stop; permit application A1903809 under review 12/12
Comfort Inn, 6670 Betty DriveThread
CAWilliamsI-512Building official says permit has been approved as of 7/8/2019; under construction with transformer installed 11/17, awaiting pedestals; awaiting power on / testing 11/27; operational 12/1812/18/2019
Granzella'sThread
CAWindsorUS-10112Permit application B18-0481 submitted 10/29/2018; permit approved 5/29
8852 Lakewood DriveThread
CAWoodlandI-512In permitting 12/26/2019
Target, 2185 Bronze Star DriveThread
COBrightonI-768Under construction 1/20/2020
5112 East Bromley LaneThread
COIdaho SpringsI-708Discussed at city council public hearing 6/5/2019; under construction 11/8; operational 2/6/20202/6/2020
Kum & Go, 1319 Miner StreetThread
COLakewoodI-708Under construction 1/29/2020
14500 West Colfax AvenueThread
COThorntonI-258Under construction 1/20/2020
237 East 120th AvenueThread
COWheat RidgeI-708Tesla discussed potential site with city planner in February 2018
Applewood Village, 3500 West Youngfield Street?Thread
CTFairfield - NorthboundI-9512Under construction 7/7/2019; transformer installed but awaiting pedestals 9/7; pedestals installed 11/19; operational 12/2312/23/2019
165 Round Hill RoadThread
CTFairfield - SouthboundI-958Under construction 7/7/2019; transformer installed but awaiting pedestals 9/7; pedestals installed 11/19; operational 12/2012/20/2019
267 Round Hill RoadThread
CTLisbonI-39512Zoning permit application submitted as of 1/29/2019
160 River RoadThread
CTMadisonI-956Under construction 8/17/2019; awaiting pedestals 11/19; pedestals installed 1/2/2020; Northbound operational 1/29, Southbound operational 1/301/29/2020
I-95 Rest Areas, Northbound and SouthboundThread
CTMeridenI-918Tesla in talks about siting with city 5/14/2018; plan before Planning Commission 8/14/2019; construction starting 10/7; awaiting pedestals 11/19; pedestals delivered 1/23/2020; awaiting testing 2/5
Dunkin Donuts, 875 East Main Street?Thread
CTNew LondonI-9512Under construction 1/23/2020
New London Mall, 351 North Frontage RoadThread
CTOld LymeI-9512Site Development Plan/Special Exception Modification Application received 12/11/2017; public hearing to be held 1/8/2018; hearing continued until 2/12; application denied 4/9
90 Halls RoadThread
CTHartford - Liebert RoadI-9112Under construction 2/9/2019; transformer installed 11/14, awaiting power on / testing
Pride Travel Center, 195 Liebert RoadThread
DCWashington - NEUS-5012Utility survey called for 7/17/2019; permit B2000417 applied for 10/10 and approved 10/28
2438 Market Street NEThread
DCWashington - Wisconsin Avenue NWUrban8Permit B1911377 issued 7/17/2019; construction mostly complete 10/30
1855 Wisconsin Avenue NWThread
FLClearwaterUS-198In permitting 9/23/2019; under construction 11/5; awaiting cabinets and transformer 11/14; transformer installed 1/23/2020; operational 2/172/17/2020
Wawa, 26508 US Highway 19Thread
FLDeerfield BeachUS-198Construction mostly complete 12/23
Wawa, 20 SW 12th AvenueThread
FLFort LauderdaleI-958Permit issued 8/27/2019
2620 West Broward BlvdThread
FLKissimmeeUS-1928Permit P19-001977 submitted for review 2/14/2019; permit issued 6/6; transformer installed while construction continues 9/5; cabinets delivered 12/7; pedestals installed 12/27; operational 1/13/20201/13/2020
Wawa, 7940 West Irlo Bronson Memorial HighwayThread
FLMiami - SW 24th StreetFL-8268Construction complete and meter energized 10/17/2019, awaiting testing; operational 1/30/20201/30/2020
Wawa, 6971 SW 24th StreetThread
FLMiami - WynwoodI-9510Tesla reportedly negotiating lease as of 7/25/2017
Midtown Mall, 3401 N Miami Avenue?Thread
FLOchopeeI-758Under construction as of 10/29/2019; transformer installed 1/5/2020; pedestals installed 2/3; operational 2/142/14/2020
I-75 Miccosukee Service PlazaThread
FLPalm CoastI-958Superchargers to be installed at new Wawa as of 1/31/2020
Bulldog Drive & State Road 100Thread
GASandy SpringsI-28512Reportedly coming as of 9/14/2018
Prado Shopping Center, 5600 Roswell Road?Thread
IASioux CityI-298Project approved by city as of 7/19/2019
Hy-Vee, 4500 Sergeant RoadThread
IAWaterlooI-380/US-208Store manager says construction will start soon as of 2/16/2020
Hy-Vee, 1422 Flamang DriveThread
IDBurleyI-848Tesla in site selection talks with mall management as of 10/31/2018
near Rue 21, 5th St east of Overland AveThread
ILChicago - Lincoln ParkUS-416Site has apparently been chosen as of 6/18/2017
near North and ClyburnThread
ILChicago - O'HareI-9014Under construction 11/19/2019; awaiting transformer 1/13/2020
10909 West Higgins RoadThread
ILFlossmoorI-5710Conditionally approved by Plan Commission 3/21/2019
Meijer, 2301 Markland AvenueThread
ILNorthbrookI-948Under construction 2/2/2020
840 Willow RoadThread
INBloomingtonI-698Under construction 11/26/2019; transformer installed while construction continues 12/27
3600 West Third StreetThread
INKokomoUS-3110Under construction 11/19/2019
Meijer, 3800 Vollmer RoadThread
INMichigan CityI-948Under construction 11/27/2019
Meijer, 5150 Franklin StreetThread
INRichmondI-708Under construction 2/2/2020
2507 Chester BlvdThread
KSEmporiaI-358Agreement in place with site as of 6/6/2017; permit approved at new site 9/30/2019; under construction 11/11
1330 Industrial RoadThread
KYFlorenceI-71/I-758Under construction 12/5/2019
4990 Houston RoadThread
LACovingtonLA-218Utility survey requested as of 12/30/2018
River Chase Shopping CenterThread
LALafayetteI-108Utility survey requested as of 12/30/2018; plans reportedly confirmed from Tesla document 4/1/2019; under construction 10/11; cabinets delivered 1/15/2020
Stirling Center, I-10 at Louisiana AvenueThread
MABeverlyYDH10Approved by Planning Board 12/19/2017; Permit submitted 7/16/2018, issued 8/19
55 Dodge StreetThread
MAChestnut HillMA-98Under construction 8/25/2019; pedestals delivered 11/28; transformer installed 12/8; awaiting power on / testing 12/19; semi-operational 1/12/20201/12/2020
55 Boylston StreetThread
MAHyannisUS-612Permit issued 4/8/2019
Stop & Shop, 425 Attucks LaneThread
MAOrleansUS-68Orleans Conservation Commission approved administrative review 1/8/2019; under construction 7/4; pedestals installed 11/21; operational 12/712/7/2019
Stop & Shop, 10 Route 6AThread
MASeekonkI-19512Application filed with Planning Board 11/1/2017
101 Commerce WayThread
MAWarehamI-19512Plans submitted to planning department as of 12/25/2017; approved by zoning board 2/17/2018; under construction 10/3/2019; transformer installed while construction continues 12/7; operational 1/15/20201/15/2020
Wareham Crossing, 2421 Cranberry HighwayThread
MAWoburnI-95/I-938Petition to city council 10/17/2017; referred to public hearing 11/21;
369 Washington StreetThread
MDBaltimore - Canton CrossingI-9512Request for pavement markings submitted as of 7/16/2019
3779 Boston Street
Thread
MDBeltsvilleI-958Variance sought with planning board as of 10/28/2018
Wawa, 2324, 10515 Baltimore AvenueThread
MDBethesda - Montgomery Mall EastI-495/I-27012Plans to build 2 supercharger sites within the mall as of 2/5/2018
Montgomery Mall Nordstrom GarageThread
MDBethesda - Montgomery Mall WestI-495/I-27012Plans to build 2 supercharger sites within the mall as of 2/5/2018
Montgomery Mall Arc Light Cinema GarageThread
MDEastonUS-508Request for pavement markings submitted as of 7/16/2019
7655 Ocean Gateway
Thread
MDHalethorpeI-95/I-6958Development Review Committee approved B-2 exception 11/28/2017
Wawa, 3716 Washington Blvd
Thread
MDNorth BethesdaI-2708Permit 879072 applied for 6/12/2019; under construction 11/23; operational 1/28/2020
Parking Garage, 11860 Trade StreetThread
MDOcean CityUS-508Operational 1/25/2020
30 Maryland AvenueThread
MDRockvilleI-2708Call for pre-construction pavement markings 9/13/2019; under construction 9/27; awaiting pedestals 11/6; equipment delivered 1/23/2020
12826 Ocean GatewayThread
MEBethelUS-26Plan approved by Planning Board 9/26/2018
211 Mayville Road
Thread
MESkowheganUS-2
8
Proposal discussed at Selectmen's meeting 10/9/2018; discussed at Planning Meeting 5/1/2019; under construction 10/12; awaiting power on / testing 11/19; operational 12/31/201912/31/2019
Hannaford, 496 Madison Avenue
Thread
MIEscanabaUS-2
10
Special land use permit granted by planning commission 2/9/2018; building permit issued 9/24
Meijer, 505 North 26th Street
Thread
MIMackinaw CityI-75
8
Permit for "Tesla charging station" dated 5/9/2019; under construction 10/8/2019
Meijer, 505 North 26th Street
Thread
MIMarquetteUS-41
8
Plan before Planning Commission 6/26/2019; confirmed in permitting 12/19
Meijer, 3630 US-41
Thread
MISault Sainte MarieI-75
8
Tesla property tax records found for supercharger site at Meijer gas station address 2/2019
Meijer, 1138 West 3 Mile Road
Thread
MISwartz CreekI-69
10
City manager says the location has been chosen. as of 3/16/2018; under construction 4/13; transformer installed 5/7; pedestals installed 11/12, awaiting power on / testing; operational 1/28/20201/29/2020
Meijer, 4141 Morrish Road
Thread
MNAlexandriaI-94

Tesla says coming in 2017 as of 10/10/2016; utility markings requested 3/20/2018; conditional use permit approved 9/24; pre-construction call for pavement markings 9/19/2019; under construction 9/22; pedestals installed 2/4/2020; operational 2/142/14/2020
Target, 4404 MN-29
Thread
MNMinneapolisI-35W
6
Approved permit for soil disturbance 01/11/2019
Target, 1600 New Brighton Blvd.
Thread
MNSt. Louis ParkMN-100
6
Call for pre-construction pavement markings 9/19/2019, under construction 10/3; transformer installed while construction continues 11/11; awaiting pedestals 12/28
Target, 3601 State Highway 100
Thread
MTGlendiveI-94
8
Permit 2019-ECON-00681 issued 6/4/2019; under construction 10/5
1919 North Merrill Avenue
Thread
MTGreat FallsI-15
8
Call for pre-construction pavement markings 7/16/2019; awaiting pedestals and cabinets 12/27
2301 14th Street SW
Thread
MTHelenaI-15
8
Under construction 10/27/2019; transformer installed 12/1
3120 Queen Anns Street
Thread
MTMiles CityI-94
8
Call for pre-construction pavement markings 10/8/2019; under construction 10/28; transformer installed while construction continues 11/18
1815 South Haynes Avenue
Thread
MTShelbyI-15
8
Agreement with city to install supercharger on City lot 11/4/2019
441 11th Avenue N
Thread
NDBismarckI-946In permitting 2/22/2019; under construction 9/9; transformer installed while construction continues 9/25
999 West Century Avenue
Thread
NDDickinsonI-948Site agreement in progress as of 12/12/2017; permit approved ~5/8/2018; construction starting 8/29; awaiting pedestals and cabinets 9/11

Thread
NDFargoI-948Tesla reportedly looking for site as of 6/30/2016; request for pavement markings 3/30/2018; ; request for pavement markings for design purpose at new site 6/19/2019; pre-construction call for pavement markings 10/2; construction beginning 10/17; transformer installed but awaitin pedestals 11/14
West Acres Regional Shopping Center, 3903 13th Avenue S? 5680 23rd Avenue South
Thread
NDGrand ForksI-298Utility survey requested for design purposes as of 7/17/2019
3601 32nd Avenue SouthThread
NDJamestownI-948Tesla in negotiations with mall management for several months as of 4/10/2019; under constructon 11/23
Buffalo Mall, 2400 8th Avenue SW
Thread
NDPembinaI-298request for pavement markings 3/30/2018
700 West Stutsman Street
Thread
NHNorth ConwayUS-3028In presentation from Irving on upcoming superchargers 8/10/2019
Irving, 1500 White Mountain Highway
Thread
NHRochesterUS-2028in permitting 11/30/2018; approved by Planning Board 12/3; construction starting 8/29/2019; transformer installed while construction continues 10/10; pedestals installed 10/28; awaiting testing 11/6; operational 12/2612/26/2019
Hannaford, 290 North Main Street
Thread
NJBoontonI-2878Under construction 5/30/2019; transformer installed while awaiting pedestals 9/7; pedestals installed 10/18
550 Myrtle Avenue
Thread
NJDeptfordNJ-42/NJ-5512Plans presented to Planning Board 4/4/2018; under construction 6/16/2019; awaiting pedestals 11/7; pedestals installed, awaiting transformer / hookup 12/4
1750 Deptford Center Road
Thread
NJElizabethNJTP20On agenda of Planning Board meeting 5/2/2019;p under construction 2/7/2020
Jersey Gardens Mall, 651 Kapkowski Road
Thread
NJFreeholdNJ-338On agenda of Planning Board meeting seeking minor site plan approval 8/15/2019
Wawa, 909 NJ-33
Thread
NJMaple ShadeI-958Public notice of planned supercharger 6/13/2019; under construction 10/26
2801 Route 73 South
Thread
NJPhillipsburgI-788Tesla to present plans to Land Use Board 2/13/2018
Wawa, 1300 Route 22
Thread
NJSpringfieldI-788Approved by planning board 1/2/2020
Wawa, 697 Morris TurnpikeThread
NJWall TownshipNJ-338Site plan approved by Board of Adjustments 9/2018
Wawa, 1310 NJ-34Thread
NVLas Vegas - North Premium OutletsI-15
8
Permit B19-00185 submitted 2/5/2019, revised submission 6/27; submission revised for V3 9/17; permit issued 10/10, re?issued 12/9
Las Vegas North Premium Outlets
Thread
NYCheektowagaI-90
8
Under construction 1/18/2020; operational 2/82/8/2020
525 Duke Road
Thread
NYCopiagueNY-27
12
Pre-construction call for utility markings 9/5/2019; under construction 9/27; awaiting pedestals 11/7
1147 Sunrise Highway
Thread
NYFlushingI-678
2
operational 1/28/2020
136-20 38th Avenue
Thread
NYManhattan - Vesey StreetI-84
2
Operational 1/28/20201/28/2020
250 Vesey Street
Thread
NYFishkillI-84
12
Announced in Hudson Valley Towne Center press release 12/15/2019; under construction with transformer installed 1/31/2020
18 Westage Drive
Thread
NYManorvilleI-495
10
Site reportedly chosen as of 8/31/2017
Route 111 between CVS and Cumberland Farms?
Thread
NYMiddletownI-84
8
Under construction 4/19/2019; awaiting power on / testing 9/26; operational 9/289/28/2019
601 East Main Street
Thread
NYOneontaI-87
8
Approved by Planning Board 9/17/2018; under construction 7/19/2019; cabinets delivered 1/15/2020; energized and awaiting testing 1/26/2020; operational 2/72/7/2020
Mirabito Fuel Stop, 4968 NY-23
Thread
NYStaten IslandNY-440
8
Under construction 6/30/2019; transformer installed 8/29; awaiting power on / testing 10/8; operational 12/31
12/31/2019
2925 Veterans Road West
Thread
PABensalemI-276
6
Under construction 10/30/2019; transformer installed 11/16; cabinets and pedestals installed 1/15/2020
3620 Street Road
Thread
PAGrove CityI-79
8
Under construction 12/20/2019; operational 2/6/20202/6/2020
1931 Butler Pike
Thread
PAKing of PrussiaI-76
8
Site agreement in place as of 12/5/2017
King of Prussia Mall, 160 N Gulph Road
Thread
PALancasterUS-30
8
Under construction 2/1/2020
518 Greenfield Road
Thread
PAPittsburghUrban
8
Under construction 12/6/2019; awaiting transformer 12/26
5550 Center Avenue
Thread
PAWilliamsportI-180
8
City zoning administrator has seen plans as of 7/21/2019; under construction 10/30
Sheetz, 105 Maynard Street
Thread
TNNashvilleI-40/I-65
12
Permit issued 6/19/2018
1033 Demonbreun StreetThread
TXBoerneI-10

Owner says new Valero station will have superchargers as of 3/19/2018; Tesla called for pavement markings at a different site 6/25/2018
28295 Frontage Road or HEB, 420 West Bandera Road
Thread
TXEastlandI-20

Tesla called for pavement markings 6/8/2018
Walmart, 1410 East Main Stgreet
Thread
TXFairviewUS-95

Tesla called for pavement markings 12/28/2018
Whole Foods, 101 East Stacy Road
Thread
TXFort Worth - Monahans AvenueI-30/I-20
10
Permit application PB18-14402 submitted 11/29/2018
5128 Monahans AvenueThread
TXHouston - DowntownI-10
8
Call for pavement markings 4/11/2018
111 Yale StreetThread
TXKatyI-10

Tesla called for pavement markings 6/7/2018; Texas DLR notification says construction to start 9/23/2019; survey stakes in place 1/25/2020
HEB, 25675 Nelson Way
Thread
TXLeon SpringsI-10
10
Tesla called for pavement markings 11/14/2019; under construction 1/8/2020
24165 I-10, San Antonio
Thread
TXMesquiteI-635/I-30

Tesla called for pavement markings 4/9/2018
Town East Mall?
Thread
TXMount PleasantI-30

Tesla called for pavement markings 4/9/2018
602 South Jefferson Avenue
Thread
TXRound RockI-35

Tesla called for pavement markings 4/9/2018
Round Rock Premium Outlets, 4401 North Interstate 35
Thread
TXSchertz/SelmaI-35

Construction to begin ~9/23/2019
17460 IH 35 N
Thread
TXSealyI-10

Site registered for accessibility compliance 11/13
6701 US Highway 90
Thread
TXStaffordI-69

Tesla called for pavement markings 4/9/2018
Walmart, 11210 West Airport Blvd
Thread
TXVidorI-10

Tesla called for pavement markings 6/13/2018
Walmart, 1360 North Main Street?
Thread
VAAshburnVA-267
8
Under construction 12/4/2019
43300 Southern Walk PlazaThread
VAFairfaxI-66
12
Deciding where in parking lot to put site as of 10/4/2017
Fairfax Corner Shopping Center, 11945 Grand Commons AvenueThread
VAFarmvilleUS-460
8
Call for pavement markings 2/18/2020
Sheetz, 2016 South Main StreetThread
VALynchburgUS-29
8
Permit B19-438 approved 6/25/2019; under construction 7/15; transformer installed while construction continues 11/5; operational 2/6/20202/6/2020
Sheetz, 14480 Wards RoadThread
VAMadisonUS-29
8
Under construction 7/23/2019; operational 2/7/20202/7/2020
Sheetz, 2902 South Seminole TrailThread
VATysonsI-495
10
Permit application 181630209 submitted 6/12/2018; permit approved 6/26
1961 Chain Bridge RoadThread
VAViennaI-66
8
Permit 191690390 applied for 6/18/2019; under construction 9/26
465 Maple Avenue WestThread
WABellevueI-405
20
Permit applications 17-125829-BG and 17-125683-BZ submitted 10/10/2017; permit abandoned 4/9/2018; new permit application submitted for new location as of 5/8; permit ready to issue 3/22/2019; permit cancelled 5/8
523 Bellevue Way NEThread
WABothellI-405
10
In permitting as of 12/11/2019; under construction 1/28/2020
19128 112th Avenue NEThread
WAChelanUS-97
7
Tesla in discussions with city on site selection as of 9/18/2018
Safeway or behind little corner park?Thread
WAForksUS-101
8
Permit 3268195E applied for 9/6/2019; under construction 9/19; awaiting pedestals and cabinets 11/3; pedestals installed and cabinets delievered 1/21/2020
Dew Drop Inn, 100 Fern Hill RoadThread
WAKelsoI-5
12
Call for pavement markings 1/8/2020, construction to begin 1/11; under construction 2/16
205 Three Rivers DriveThread
WAMoses LakeI-90
12
Under construction 8/19/2019; awaiting transformer 12/26; operational 1/3/20201/3/2020
2709 West Broadway AvenueThread
WANorth BendUS-97
7
Tesla in discussions with city on site selection as of 9/18/2018; under construction 9/5/2019; transformer installed while construction continues 10/2; pedestals installed 11/26; passed inspection 12/9; semi-operational 12/12; operational 12/1812/18/2019
461 South Fork AveThread
WAOkanoganUS-97
8
Tesla says a site is planned here as of 3/31/2017
unknownThread
WASeattle - NorthgateI-5
8
Permit 6722428-CN submitted for review 10/25/2019
401 NE Northgate WayThread
WASpokaneI-90
8
Under construction 7/23/2019; pedestals installed 11/26; operational 12/2012/20/2019
10506 West Aero RoadThread
WASnoqualmieI-90
8
Mayor said where the location will be 6/26/2017
Safeway?Thread
WATumwaterI-5
12
Permit TUM-18-1347 for equipment enclosure submitted for review 10/30/2018; under construction 10/27/2019; awaiting power on / testing 2/8/2020
2430 93rd Avenue SWThread
WAVancouver - Vancouver MallI-5
12
Call for pavement markings 1/8/2020, construction began 1/11
8700 NE Vancouver Mall DriveThread
WIHudsonI-94
8
Reportedly in plan for new Hy-Vee as of 11/3/2019
2351 Coulee RoadThread
WYCasperI-25
8
Owner reported signing contract with Tesla for superchargers as of 4/29/2019
Hat Six Travel CenterThread
ABBassano1
8
Under construction 8/23/2019; cabinets installed 10/10; operational 12/2012/20/2019
621 12th Street
Thread
ABCalgary - South17
12
Reportedly coming as of 12/21/2017
6455 McLeod Trail
Thread
ABJasper17
8
Proposal to use city lot for superchargers before council 12/17/2019
Connaught Drive opposite Robinson's
Thread
ABMedicine Hat1
8
Public notice posted for development permit approval of charging station 4/6.2019; public notice of development permit for different site published 5/3 is likely to be supercharger site; City planning department says permit has been issued as of 5/21; under construction 9/5; pedestals installed 10/24; operational 12/2012/20/2019
1941 Strachan Road SE
Thread
ABRed Deer - Leva Avenue2
8
Under construction 10/12/2019; operational 12/2012/20/2019
179 Leva Avenue
Thread
ABStrathmore1
6
Under construction 10/11/2019; transformer installed but no meter while construction continues 10/28; power on, awaiting testing 11/22; operational 12/2012/20/2019
125F Ranch Market
Thread
BCAbbotsford1
12
Under construction 11/27/2019; awaiting pedestals 1/26/2020; pedestals installed 1/31
3122 Mount Lehman Road
Thread
BCCache Creek3
8
City council approved signing contract with Tesla 9/16/2019
1270 Stage Road
Thread
BCCastlegar3
9
Canadian Tire announced upcoming superchargers at this site 1/15/2020
2000 Columbia Avenue
Thread
BCNakusp6/238Tesla assessing sites as of 8/26/2019;
200 8th Avenue NWThread
BCOsoyoos3/978Tesla presented plan to City Council 7/3/2019
8502 74th AvenueThread
BCRichmondUrban20Under construction 9/4/2019; awaiting transformer 12/19; operational 1/28/20201/28/2020
6060 Minoru BlvdThread
BCSalmon Arm18SmartCentre spokesperson says coming soon as of 3/14/2018
Smartcentre, 2991 10 Avenue SW?Thread
MBBrandon16Shindico says supercharger construction to begin in fall as of 3/27/2018; under construction 7/19/2019; pedestals delivered 11/7; testing 12/12; operational 12/2312/23/2019
Corral Centre, 921 18th Street NThread
MBPortage la Prairie16Shindico says supercharger construction to begin in August as of 3/27/2018; under construction 7/21/2019; transformer installed while construction continues 8/19; pedestals installed 10/27; operational 12/1212/12/2019
2100 Saskatchewan AvenueThread
MBPrawda16Special accessory use approved by Reynolds council 5/22/2018; under construction 7/29/2019; transformer installed while awaiting Tesla equipment 9/24; operational 12/2012/20/2019
Shell, Trans-Canada HighwayThread
MBWinnipeg112Site located 11/6/2018; under construction 8/11/2019; transformer installed while construction continues 8/19; awaiting power on / testing 11/7; testing 12/12; semi-operational 12/13
1485 Portage AvenueThread
ONBatchawana Bay174Under construction 9/3/2019
11028 Highway 17 NThread
ONBlind River16On September 2017 city council agenda; under construction 9/3/2019; pedestals installed 10/16; transformer installed 11/21; tested 12/7; operational 12/1212/12/2019
Tourist Information Centre, 453 Trans-Canada HighwayThread
ONBrockville40112SmartCentre spokesperson says coming soon as of 3/14/2018
Smartcentre, 1942 Parkedale Avenue W?Thread
ONDeep River16Under construction 6/10/2019; transformer installed 10/28, awaiting power on / testing; operational 12/2312/23/2019
Canadian Tire, 33277 Highway 17Thread
ONDryden176Red River Co-op says agreement with Tesla in place as of 8/8/2019; under construction 10/18; operational 12/2012/20/2019
Red River Co-op, 640 Government StreetThread
ONBaldwin176Under construction 6/29/2019; awaiting transformer 11/1; operational 12/12
329 Highway 17Thread
ONBancroft62
8
Canadian Tire announced upcoming superchargers at this site 1/15/2020
Canadian TireThread
ONIgnace16Lease agreement with City began 4/15/2018; under construction 10/18/2019; operational 12/1812/18/2019
304 Main StreetThread
ONKenora216Approved by Planning Committee as of 9/5/2019; equipment staged at site 9/26; under construction 10/2; pedestals and equipment delivered 10/23; awaiting transformer / hookup 11/14; transformer/power connected 12/12, undergoing testing; operational 12/2012/20/2019
Canadian Tire, 1201 Highway 17 EThread
ONKitchener858Under construction 10/18/2019
Service Center, 663 Vicgtoria Street NThread
ONKincardine21/96Owner of site says Tesla will put superchargers there as of 4/27/2019; construction of some sort at site 9/7; Canadian Tire announced upcoming superchargers at this site 1/15/2020
Canadian Tire, 811 Durham Street?Thread
ONLondon40112Under construction 10/3/2019; awaiting pedestals 11/21
4350 Wellington Road SouthThread
ONNepean3
9
Canadian Tire announced upcoming superchargers at this site 1/15/2020
Canadian TireTD] [TD]Thread
ONNiagara FallsQEW12Under construction 12/26/2019
3770 Montrose RoadThread
ONNipigon16City council authorized lease agreement with Tesla 2/6/2018; under construction 9/7/2019; operational 12/2012/20/2019
Tourist Information Centre, 453 Trans-Canada HighwayThread
ONNorth Bay1/118Under construction 4/16/2019; transformer installed, awaiting pedestals 9/9; pedestals installed 10/12; testing 11/17; semi-operational 12/12; operational 12/1812/18/2019
unknownThread
ONRenfrew16On city council agenda 2/2/2018
Tourist Information Centre, 453 Trans-Canada HighwayThread
ONSault Ste Marie176Under construction 7/9/2019; pedestals delivered 10/5, installed 10/18; tested 12/4; semi-operational 12/12
673 Second Line EThread
ONTerrace Bay16Lease agreement signed as of 11/26/2018, to go into effect 3/15/2019; under construction 9/3; pedestals installed 10/18; semi-operational 12/17; operational 12/2012/20/2019
43 Simcoe PlazaThread
ONThunder Bay176Awaiting power on / testing 11/3/2019; tested and semi-operational 12/9; operational 12/2012/20/2019
Canadian Tire, 1221 Arthur Street WestThread
ONUpsala11/176Under construction 11/11/2019; operational 12/2112/21/2019
Shell, 4810 Highway 17Thread
ONVaughan4008Minor zoning variance approved 11/1/2018
3600 Major MacKenzie Drive WestThread
ONWawa17/1014Sault Ste Marie contractor says this site is next as of 7/12/2019; under construction 9/3; testing 11/21; operational 12/2012/20/2019
Swipe, Pump, & Go, 95 Mission StreetThread
ONWhite River176Under construction 9/3/2019; pedestals installed 10/12, awaiting transformer / hookup; operational 12/2012/20/2019
XTR, 17 Highway 17Thread
ONWoodbridge712SmartCentre spokesperson says coming isoon as of 3/14/2018
Smartcentre, 3900 Windflower Gate?Thread
QCChicoutimi/Saguenay1758Under construction 11/13/2019; operational 2/8/20202/8/2020
1562 Boulevard Talbot
Thread
QCSaint-Liboire1168In presentation from Irving on upcoming superchargers 8/10/2019
Irving, 1144 Rang Saint-Édouard
Thread
QCTerrebonne40/6408City council member says will be installed as of 6/21/2019
1115 Montée des PionniersThread
SKDavidson116Tesla has lease agreement as of 8/6/2019; under construction 8/13; transformer installed while construction continues 8/19; pedestals installed 10/20; operational 12/1912/19/2019
Co-op Gas Bar, 100 North Service RoadThread
SKMaple Creek2106Under construction 6/29/2019; pedestals installed 10/12; awaiting power on / testing 11/11; operational 12/1912/19/2019
106 Sidney StreetThread
SKMoose Jaw16Under construction 6/12/2019; awaiting power on / testing 10/18; operational 12/1712/17/2019
1251 Main Street NThread
SKMoosomin15Building permit approved by city council 3/13/2019
Smartcentre, 2150 Prince of Wales DriveThread
SKRegina18Tesla in site selection process as of 11/3/2017; SmartCentre spokesperson says coming soon as of 3/14/2018; under construction 8/29/2019; pedestals installed 10/3; awaiting transformer / hookup 10/15; operational 12/2012/20/2019
Canadian Tire, 2325 Prince of Wales DriveThread
SKSwift Current18Under construction 9/3/2019; pedestals installed 10/19; operational 12/2012/20/2019
1601 North Service RoadThread
SKWhitewood18Under construction 8/3/2019; awaiting pedestals and cabinets 9/26; pedestals and cabinets installed, awaiting transformer 10/3; semi-operational 12/19; operational 12/2012/20/2019
1206 Highway 1Thread
[/TD] [TD]

[/td]
[TD]

Following is an archive of the progress of sites which are now operational:
ALAthensI-6510Construction complete with transformer installed 5/28/2017; operational 5/315/31/2017
Fairfield Inn & Suites, 21282 Athens-Limestone LaneThread
ALBirminghamI-208Sources say coming soon as of 9/1/2016; Permit BLD2016-02367 submitted for review 9/14; Tesla says approaching construction phase 9/26; construction well underway 10/28; awaiting transformer & hookup 11/5; operational 11/1611/16/2016
Uptown, 2221 Richard Arrington Jr Blvd NThread
ALMobileI-10/I-658On Coming Soon map released 12/18/2014; permit application submitted 1/26/2015; 1 permit condition still requiring resolution 2/24; under construction 3/20; transformer in place 4/6, power on 4/8; operational 4/164/16/20153201 Airport BlvdThread
ALOxfordI-2012Construction mostly complete 9/22/2017; operational 10/1510/15/2017
552 Oxford Exchange BlvdThread
ALSteeleI-598Under construction 7/8/2017; transformer & meter installed 7/16; operational 8/98/9/2017
905 Steele Station RoadThread
ARLittle RockI-2010Plans submitted for permitting as of 3/2/2017; plans approved and construction out to bid as of 3/15; construction began 4/6; awaiting transformer & hookup 5/9; operational 5/195/19/2017
11231 Bass Pro ParkwayThread
AZPageUS-898Tesla says under construction as of 9/2/2016; operational 9/109/10/2016
Courtyard, 600 Clubhouse DriveThread
AZPaysonAZ-260/AZ-8712Permit PY1803-037 applied for 3/21/2018; under construction 11/8; operational 12/2812/28/2018
201 North Beeline HighwayThread
AZPhoenixI-17/10116Permit SE 17029532 issued 10/17/2017; awaiting transformer & hookup 12/17; transformer installed 1/9/2018; operational 3/203/20/2018
2805 W Agua Fria FwyThread
AZPhoenix-BiltmoreAz-5120Mall management says construction is imminent as of 1/9/2018; pavement markings 1/21; under construction 2/13; transformer installed 3/22; operational 3/263/26/2018
Biltmore Fashion Park, 2442 East Camelback RoadThread
AZScottsdaleUrban16Operational 11/21/2017
Scottsdale Quarter parking garageThread
AZSedonaUrban14Under construction 2/10/2018; transformer installed 4/3; testing 4/18; operational 4/224/22/2018
7000 AZ-179Thread
AZTucsonI-1010Permit T17CM04231 issued 8/7/2017; under construction 8/20; transformer installed 10/10; power on, awaiting testing 10/13; operational 10/1410/14/2017
Minute Mart, 9255 South Rita RoadThread
AZTucson - La EncantadaAZ-7712Permit application P17BP06312 submitted 10/11/2017; under construction 2/12/2018; transformer installed 4/17; connected to grid 4/26, awaiting testing; operational 4/284/28/2018
La Encantada Mall, 2905 East Skyline DriveThread
AZTusayanAS-6412Construction mostly complete 7/1/2019; operational 10/2410/24/2019
Grand Hotel, 149 AZ-64Thread
AZWillcoxI-108Site selected as of 7/19/2017; plans approved and construction imminent as of 9/29; under construction 10/14; transformer installed 12/612/13/2017
Holiday Inn Express, 1251 Virginia AvenueThread
CAAlamedaUrban12Permit E18-0211 submitted for review 5/14/2018 Construction started on 10/8/18; transformer installed while construction continues 11/26; operational 12/1412/14/2018
523 South Shore CenterThread
CAAnaheim HillsCA-9114Permit BLD2018-03898 applied for 8/24/2018; permit issued & construction began 3/4/2019; transformer installed 5/1; operational 5/155/15/2019
8148 East Santa Ana Canyon RoadThread
CAAntiochCA-412Permit application under review 9/18/2018; construction starting 2/11/2019; awaiting transformer 2/26; operational 3/203/20/2019
Target, 5769 Lone Tree WayThread
CABakerI-1540Permits B201705449 through B201705453 applied for 7/13/2017; under construction 9/1; operational 11/2111/21/2017
71808 Baker BlvdThread
CABakersfieldI-510Permit applications for electrical and enclosure submitted 3/2/2016; found under construction 8/14; operational 9/299/29/2016
Shell, 29541 Stockdale HighwayThread
CABig SurCA-18Permit application 18CP02080 submitted 8/15/2018, approved and ready to issue 11/26; permit issued 3/28/2019; under construction 4/4; awaiting transformer 5/7; operational 5/245/24/2019
Ventana Big Sur Resort, 48123 Highway 1Thread
CABuena ParkI-5/CA-918Under construction 5/16/2016; transformer installed 10/15; operational 10/1910/19/2016
Service Center, 6692 Auto Center DriveThread
CABurbankI-56Under construction 8/19/2015; operational 12/1512/15/2015Service Center, 811 South San Fernando Blvd.Thread
CABurbank #2I-520Under construction 6/29/2017; operational 9/149/14/2017
501 North Third StreetThread
CAButtonwillowI-510Sources say coming as of 10/12/2015; Kern County permit #K201508122 applied for 10/21; permits issued 12/15; under construction 12/28; awating transformer and hookup 1/22/2016; transformer installed 1/24; connected to grid 1/27; operational 1/291/29/2016Starbucks / Subway, 20673 Tracy AvenueThread
CACarlsbad - La CostaI-526permit CBC2017-0600 applied for 11/14; construction began 4/18/2018; operational 9/289/28/2018
7710 El Camino RealThread
CAChicoCA-9914Permit 18-02934 applied for 8/29/2018; under construction 2/20/2019; transformer installed 5/29; operational 6/196/19/2019
1951 East 20th StreetThread
CAConcordI-68019Permit B172071 applied for 6/23/2017, building review approved 6/30, planning still under review (?) as of 8/26; under construction 10/16; awaitng testing 2/23; operational 3/13/1/2018
Veranda Shopping Center, 2001 Diamond BlvdThread
CACoronaI-1514Permit 18-01949 applied for 6/25/2018; permit approved & issued 1/16/2019; construction complete 3/29, awaiting transformer / hookup; operational 3/303/30/2019
Target, 2615 Tuscany StreetThread
CACorte MaderaUS-10110Planning application filed January 2015, approved 4/30/2018; building permit BL-2018-0167 applied for 4/6/2018, approved 9/19, issued 10/1; under construction 10/21; operational 2/12/2019
1618 Redwood HighwayThread
CACrescent CityUS-1018Lease agreement on city council agenda for 4/6/2015; application 118-070-25 / projects UP15-10 & AR15-11 approved by planning commission 12/10; construction began 7/25/2016; construction complete with transformer in place 9/5; operational 9/89/8/2016
Front & K StreetsThread
CACupertinoI-28010Permit B-2017-1539 applied for 9/11/2017, issued by 10/31; operational 3/28/20183/28/2018
19500 Vallco ParkwayThread
CADaly CityI-28040Construction starting 8/14/2018; operational 10/510/5/2018
Serramonte CenterThread
CADowney - Lakewood BlvdI-510Under construction 1/21/2018; transformer installed 5/23; operational 5/245/24/2018
9588 Lakewood BlvdThread
CADowney - Stonewood StreetI-510Construction mostly done, awaiting transformer 6/12/2018
251 Stonewood StreetThread
CADublinI-580/I-68010In permitting with the City of Dublin 5/29/2015; under construction 7/18; supercharger can't open until mid-Sept because of 30-day notice required to neighbors of scheduled power outage to connect transformer to the grid; transformer installed 10/5; operational 10/1610/16/2015Service Center, 6701 Amador Plaza RoadThread
CAEast Palo AltoUS-10116Tesla reportedly in discussions for a site as of 4/19/2018; under construction 5/19; awaiting transformer & hookup 6/5; transformer installed 6/21; provisionally operational 6/29
Ravenswood Shopping CenterThread
CAEurekaUS-1018Permit application submitted ~10/30; coastal development permit under review as of 11/9; building permit B15-0852 submitted for review 11/23; permit B15-0852 approved 1/25/2016; construction underway 6/30/2016; transformer installed 7/24; power to be connected 8/9; operational 8/168/16/2016
Bayshore Mall, 3300 BroadwayThread
CAFairfieldI-8012Permit BLD2017-02121 applied for 11/7/2017; construction well underway 3/6/2018; operational 5/55/5/2018
Solano Town Center, 1350 Travis Blvd.Thread
CAFairfield - Holiday LaneI-8010Permit BLD17-02330 applied for 12/17/2017; permit approved 2/6/2019; under construction 4/1/2019; awaiting transformer & hookup 4/17; operational 5/105/10/2019
1350 Holiday LaneThread
CAFish CampCA-418Found with construction complete 11/21/2016, awaiting transformer & hookup; operational 12/1512/15/2016
Tenaya Lodge, 1122 California Highway 41Thread
CAFolsom #2US-5010Under construction 6/24/2016; awaiting transformer & hookup 7/12; operational 8/118/11/2016
Parking Garage, 370 Palladio ParkwayThread
CAFontanaI-21023Construction mostly done 4/13/2018; transformer installed 3/26/2019; operational 3/293/29/2019
Falcon Ridge Town Center, 15234 Summit AvenueThread
CAFountain ValleyI-4058Discovered under construction 7/7/2015; transformer installed 8/10; operational 8/25; temporarily closed 8/26; operational 8/288/28/201517940 Newhope StreetThread
CAFremont (Fremont Hub)I-88012Under construction 11/19/2017; transformer installed 12/20; operational 4/27/20184/27/2018
39201 Fremont BlvdThread
CAFremont (Kato Road)I-88020Under construction 10/22/2015, later abandoned47400 Kato RoadThread
CAFresnoCA-9910Tesla is "Coming Soon" to the Marketplace at El Paseo - footprint indicates that it is likely the supercharger; construction started ~11/20/2015; awaiting transformer / hookup 1/5/2016; transformer installed 1/9; operational 1/291/29/2016The Marketplace at El Paseo (~6611 North Riverside Ave)Thread
CAGlendaleI-5/CA-134/CA-220Mall manager claims one is being installed here as of 1/8/2018; construction well underway 3/20/2018; operational 3/293/29/2018
889 Americana WayThread
CAGrovelandCA-1207Tuolumne County board of supervisors voted 3-0 to pursue a lease agreement with Tesla 3/1/2016; building permit application B2016-00814 submitted 7/20; Planning review approved 7/25 with Building review still pending; equipment staged on site 9/22; under construction 9/24; operational 12/15
11880 Ponderosa LaneThread
CAGustineI-512Permit BP2016-0990 applied for 5/12/2016; permit approved 8/5; permit issued 9/9, found under construction 10/4; awaiting transformer & hookup 10/17; transformer installed 11/2; meter installed 11/10; operational 11/1511/15/2016
Andersen's Split Pea Soup, 12411 CA Highway 33, GustineThread
CAHaywardI-88014Under construction 4/9/2019; awaiting transformer & hookup 4/27; transformer installed 5/30; operational 6/226/22/2019
Target, 19661 Hesperian BlvdThread
CAHollisterCA-15218Construction mostly complete as of 12/13/2017; awaiting transformer & hookup 12/20; transformer installed 1/26/2018; operational 3/123/12/2018
Casa de Fruta, 10021 Pacheco Pass HighwayThread
CAInyokernUS-3954Kern County permit K2014-06075 approved 12/19/2014; permit issued 12/30; under construction 1/7/2015; operational 3/20/20153/20/20151353 Brown RoadThread
CAIrvine - Michelson Drive StreetI-40524Permit 00787714-CPKM applied for 5/31/2019, issued 7/23; under construction 8/7; awaiting transformer / hookup 9/24; operational 10/1910/19/2019
3021 Michelson DriveThread
CAKettleman CityI-540Plans revealed 7/11/2017; under construction 9/17; operational 11/1511/15/2017
33360 Powers DriveThread
CALake ElsinoreI-1516Under construction 11/11/2017; operational 2/28/20182/28/2018
Outlets, 17600 Collier AvenueThread
CALaytonvilleUS-1018Permit applied for 10/18/2017; under construction 1/30/2019; operational 6/296/29/2019
45020 Highway 101Thread
CALivermoreI-58020Permit CM180049 applied for as of 5/27/2018; under construction 10/5; operational 11/2211/22/2018
2774 Livermore Outlets DriveThread
CALos Angeles - Francisco StreetCA-11010operational 3/6/20193/6/2019
899 Francisco StreetThread
CALos GatosCA-178Staff report approved by town council 12/19/2017; permit E18-013 application submitted 1/29/2018; permit approved 4/3; under construction 4/27; awaiting transformer 5/25; transformer installed 9/17; testing 9/19; open9/24/2018
142 Saratoga-Los Gatos RoadThread
CAMalibuCA-15Operational 6/13/20196/13/2019
23401 Civic Center WayThread
CAMammoth LakesUS-3958Approved by town council 9/16/2015; under construction 12/10; operational 1/20/20161/20/2016Park-and-Ride Lot, 106 Old Mammoth RoadThread
CAManhattan BeachI-40512Construction mostly done 12/1/2018; operational 12/612/6/2018
3200 North Sepulveda BlvdThread
CAMenifeeI-1514Plan approved as of 6/14/2019; under construction 6/25; transformer installed but awaiting pedestals; pedestals installed 9/16; operational 9/30 9/30/2019
Target, 30340 Haun RoadThread
CAMenlo ParkI-28010Permit 2018-0562 issued 4/3/2019; under construction 5/25; transformer installed 8/18; operational 11/2111/21/2019
325 Sharon Park DriveThread
CAMilpitasI-68016Permit B-EL 18-0032 application submitted 1/19/2018; issued 2/1; transformer installed while construction continues 9/14; operational 11/1511/15/2018
Embassy Suites, 901 East Calaveras BlvdThread
CAMilpitas - Great MallI-88020Permit B-BP18-0351 application filed 7/18/2018, approved 12/11/2018, issued 1/25/2019; construction well underway 3/18; transformer installed 7/21; operational 9/209/20/2019
1234 Great Mall DriveThread
CAMojaveCA-146Permit recommended for conditional approval by Kern County Planning Department 12/18/2014; pavement markings seen 2/4/2015; to be tested 3/27; operational 3/273/27/2015near Anthony's Grill, 16940 California 14Thread
CAMontereyCA-110Under construction mid-June 2017; mostly complete 7/11; transformer installed 7/29; operational 8/108/10/2017
1410 Del Monte CenterThread
CAMorgan HillCA-10114Permit BCOM2018-0150 applied for 9/14/2018, approved 9/25, issued 7/17/2019; under construction 7/24; transformer installed 9/26; operational 10/2410/24/2019
1061 Cochrane RoadThread
CAMountain ViewUS-10112Construction mostly complete 5/25/2015; transformer installed 5/26; failed inspection 5/29; passed inspection 6/3; operational 6/96/9/2015Computer History Museum, 1401 North Shoreline BlvdThread
CAMount Shasta III-516Under construction 10/9/2017; operational 1/4/20181/4/2018
134 Morgan WayThread
CANapa
8Napa County permit P14-00339 in process as of 12/21/2014; part of larger development to be completed by end of 2015; Lake Charles / West Wendover contractor won bid for construction as of 1/18/2015; construction in general area began late June; supercharger under construction 9/17; awaiting paving and transformer 11/30; operational 7/97/9/2016
Devlin Road & Airport BlvdThread
CANapa - Factory Stores DriveCA-2916Under construction 7/9/2019; operational 11/1611/16/2019
Premium Outlets, 629 Factory Stores DriveThread
CANewarkI-88016Construction complete, awaiting transformer 11/10/2018; transformer installed 7/29/2019; operational 9/199/19/2019
Lazy Dog, 3100 Newpark MallThread
CAOjaiCA-33/CA-15012Approved by city council 12/5; building permit OJ19-053 issued 4/4/2019; construction starting 5/1; operational 7/227/22/2019
987 West Ojai AvenueThread
CAPalm SpringsCA-11112Plan approved by city council 9/20/2018; operational 6/19/20196/19/2019
North Museum Drive at North Belardo RoadThread
CAPalo AltoUS-101/I-28020Under construction 7/1/2019; operational 11/511/5/2019
660 Stanford Shopping CenterThread
CAPasadenaI-21024Municipal Service Committee recommended plan to City Council on 2/26/2019, Council voted to proceed; approved by city council 3/11; permit approved 7/15; construction starting 9/4; operational 11/2611/26/2019
155 East Green Street, top levelThread
CAPlacervilleUS-506Tesla in negotiations for a site as of 10/13/2015; lease contract signed as of 11/3; plans abandoned as of 7/8/2016; operational 8/31/20198/31/2019
3093 Spanish Ravine RoadThread
CAPleasantonI-580/I-68010Permit application B18-2778 submitted 10/11/2018; permit issued 1/23/2019; under construction 2/25; awaiting transformer & hookup 4/27; operational 4/304/30/2019
North Museum Drive at North Belardo RoadThread
CARancho MirageI-1022Reported to be in process by the planning department as of 4/9/2019; under construction 6/11; operational 9/189/18/2019
The River Shopping CenterThread
CARed BluffI-58Operational 11/26/201911/26/2019
94 Belle Mill RoadThread
CARichmondI-58011Permit B18-03359 applied for 12/6/2018; under construction 4/25; awaiting transformer 9/7; operational 9/169/16/2019
2157 Meeker AvenueThread
CARiversideI-215/CA-60/CA-9124Permit issued 10/27/2017; construction beginning 11/4; transformer installed 12/20; operational 12/2812/28/2017
3878 Market StreetThread
CARohnert ParkUS-10112Under construction 3/10/2019; awating transformer / hookup 4/30/2019; operational 5/95/9/2019
Target, 475 Rohnert Park ExpwyThread
CASacramentoI-510Tesla says in site selection as of 3/1/2017; permit application DR17-143 submitted for plan review 4/11; under construction 7/27; operational 10/1310/13/2017
Promenade Shopping Center, 3668 North Freeway BlvdThread
CASacramento - Arden FairI-80 Business20Plans seen 2/9/2018; permit issued 4/11; awaiting transformer 6/18; transformer installed 6/26; operational 8/118/11/2018
Arden Fair Mall, 1689 Arden WayThread
CASalinasUS-10116Construction started 8/11/2017; transformer installed and connected to the grid 10/9; operational 10/1310/13/2017
Harden Ranch Mall, east of North Main St. at San Juan Grade RoadThread
CASan BernardinoI-21512Construction mostly complete 4/19/2018; transformer installed 6/5; operational 6/66/6/2018
400 Inland Center DriveThread
CASan ClementeI-510Permit B17-1210 applied for 7/20/2017; permit approved 9/18; equipment staged on site 9/23; final inspection 11/16, awaiting power on / testing; operational 11/1711/17/2017
Parking garage at Outlets at San Clemente, 99 West Avenida Vista HermosaThread
CASan DiegoI-5/I-80512Tesla reported that "permits have been pulled" 10/23/2014; construction site found 12/15/2014 in early stages; construction complete with transformer installed 5/11; energized 5/22 but access is blocked; accessible for charging 6/86/8/201510105 Pacific Heights Blvd.Thread
CASan Diego - Camino del SurI-1515Permit application for Project 581515 submitted 10/26/2017; permit approved 1/22/2018; under construction 10/4; awaiting transformer & hookup 12/4; transformer installed 1/3/2019; operational 1/111/11/2019
17170 Camino del SurThread
CASan Diego - Del Mar Heights RoadI-512In permitting 12/13/2018; permit issued 1/10/2019; under construction 1/21; transformer installed 5/7; operational 5/195/19/2019
Del Mar Heights RoadThread
CASan Francisco - Letterman DriveUS-1016Operational 5/22/20195/22/2019
Truby StreetThread
CASan Jose - Blossom Hill RoadCA-8518Under construction 1/21/2019; awaiting transformer & hookup 1/30; operational 5/165/16/2019
1375 Blossom Hill RoadThread
CASan Jose - Cherry AveCA-8524Permit AD18-561 applied for 6/7/2018; under construction 8/31; awaiting transformer / hookup 10/2; transformer installed 10/26; operational 12/2112/21/2018
5160 Cherry AvenueThread
CASan Luis ObispoUS-10110Tesla says coming in early 2018 as of 11/29/2017; under construction 2/12/2018; operational 5/55/5/2018
Madonna Inn, 100 Madonna RoadThread
CASan MateoUS-1018Sources say a supercharger is coming here as of 2/18/2015; equipment on site 5/18; testing 6/25; operational 7/97/9/20151200 Park PlaceThread
CASan Mateo (Bridgepointe)US-101/CA-9210Construction mostly complete 10/29/2017; awaiting inspection & power on 10/31; operational 11/111/1/2017
Target, 2220 Bridgepointe ParkwayThread
CASan Ramon - Diablo PlazaI-68020Architectural Review application AR 18 200-037 submitted 7/10/2018; under construction 12/6; awaiting transformer & hookup 1/30/2019; transformer installed 3/24; operational 4/54/5/2019
2415 San Ramon Valley BlvdThread
CASanta AnaI-512Permit application submitted 2/16/2016; construction began 8/5; awaiting transformer & hookup 10/4; transformer installed 11/19; operational 12/512/5/2016
Mainplace Mall, 2800 North MainThread
CASan CarlosUS-10112Permit MEP2017-00147 applied for 3/28/2018, approved 4/4; permit issued 5/3; under construction 6/4; transformer to be installed 6/21; provisionally open 6/296/29/2018
1127 Industrial RoadThread
CASanta ClaritaI-524Plans submitted for review 8/3/2017; under construction 1/20/2018; operational 4/54/5/2018
Bridgeport Marketplace, 23975 Newhall Ranch RoadThread
CASan Diego - DowntownI-516Project 581651 building and electrical permits application submitted 10/26/2017; under construction 3/31/2018; transformer installed 4/15; operational 6/276/27/2018
Parking Palace, 1350 6th AvenueThread
CASan Diego - Friars RoadI-824Permit application submitted 9/28/2018; permit approved 10/22; under construction 12/1; transformer installed 12/13; operational 1/31/20191/31/2019
7007 Friars RoadThread
CASan Jose - Coleman AveCA-8710Planning application AD17-1270 submited 12/19/2017; building permit application 2017 036784 CI pending as of 3/3/2018; under construction 6/4; operational 8/318/31/2018
Target, 533 Coleman AvenueThread
CASan Jose - Santana RowCA-8528Under construction 11/8/2018; operational 2/1/20192/1/2019
Parking garage, 330 Winchester BlvdThread
CASan RamonI-68010Development Plan amendment requested 1/29/2018; planning approved 4/30; under construction 6/29; transformer installed 8/22, awaiting power on / testing; operational 8/308/30/2018
Target, 2610 Bishop DriveThread
CASanta Monica - Santa Monica PlaceCA-1/I-1010Permit application 18BLD-6064 submitted for review 5/14/2018; under construction 11/21; operational 2/192/19/2019
395 Santa Monica PlaceThread
CASeasideCA-16Store / service center / superchargers under construction as of 6/11/2015; testing 8/11; operational 8/138/13/2015Store / Service Center, 1901 Del Monte BlvdThread
CASunnyvaleUS-101/CA-85/CA-23724Construction beginning 11/11/2017; transformer installed 1/30/2018; connected to power 2/5; operational 3/123/12/2018
Target, 1298 West McKinley AvenueThread
CATahoe CityCA-896Permit BP18-1883 submitted 12/2/2018, approved 12/9/2018, issued 7/11/2019; under construction 7/29; awaiting transformer / hookup 10/7; transformer installed 10/10; meter installed 10/17, awaiting power on / testing; operational 11/1511/15/2019
140 North Lake BlvdThread
CATemeculaI-1510
Sources say coming soon as of 11/2/2015; under construction 3/21/2016; awaiting transformer and hookup 4/12; operational 5/105/10/2016
40780 Ring Road
Thread
CAThousand Oaks - EastUS-10118under construction 11/19/2017; transformer installed 3/3/2018; testing 3/20; operational 3/213/21/2018
Promenade, 180 Promenade WayThread
CAThousand Oaks - West Hillcrest DriveUS-10120Permit 17-00004489 submitted 11/13/2017, approved and issued 1/19/2018; under construction 2/24; awaiting transformer 6/13/2018; operational 8/88/8/2018
The Oaks, 350 West Hillcrest DriveThread
CATruckee IICA-2678Found under construction 10/7; Commercial Remodel permit #TI 2015-00000785; operational 10/23/201510/23/2015Fifty Fifty Brewery, 11197 Brockway BlvdThread
CATwentynine PalmsCA-628Operational 12/8/201612/8/2016
73829 Baseline Road
CAUkiahUS-1018Approved by city council 8/7/2015; Construction started ~12/8; operational 1/13/20161/13/2016
Thread
CAVallejoI-8016Permit BP18-1883 submitted 12/2/2018, approved 12/9/2018; construction starting 4/4/2019; operational 6/216/21/2019
Target, 904 Admiral Callaghan LaneThread
CAWalnut CreekI-68012Construction complete, awaiting transformer 10/12/2019; transformer installed 10/16; operational 10/2410/24/2019
Top level of parking garage, 1250 South California BlvdThread
CAWatsonvilleCA-114Under construction 5/11/2019; awaiting transformer 5/29; operational 7/257/25/2019
`415 Main StreetThread
CAYermoI-1518San Bernardino County permit application B201703979 filed 5/31/2017; under construction 8/21; operational 11/2211/22/2017
Eddie World, 36017 Calico RoadThread
CAYuba CityCA-9910Permit BLD18-01391 ready to issue as of 11/25/2018; under construction 12/6; awaiting transformer 1/29/2019; operational 2/52/5/2019
1475 Tharp RoadThread
COAspenCO-828Operational 7/2/20187/2/2018
38750 Highway 82Thread
COBoulderUS-3610In permitting 12/10/2017; initial review required changes 2/2/2018; permit approved 3/8; under construction 3/29; transformer installed 5/24; operational 5/305/30/2018
1805 29th StreetThread
COBrushI-768Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016, Tesla says proceeding with site 11/9; under construction 12/10; construction mostly complete with transformer installed 12/22; operational 12/3112/31/2016
Tomahawk Brush Travel Stop, 1156 Colorado AvenueThread
COColorado SpringsI-258Sources say coming soon as of 10/12/2015; suspected supercharger plans sumitted for review 10/14; under construction 12/7; energized and testing 12/23; operational 12/2912/29/2015215 North Cascade AveThread
COEstes ParkUS-347Construction complete, awaiting transformer 4/29/2018; transformer installed 5/12; operational 5/155/15/2018
Stanley Hotel, 333 East Wonderview AvenueThread
COLone Tree III-2516Under construction 10//2017; operational 11/17
Park Meadows Center DriveThread
COLovelandI-258Found in early stage of construction 10/30/2016, transformer installed 12/14; operational 12/2812/28/2016
Embassy Suites, 4705 Clydesdale ParkwayThread
COPoncha SpringsUS-285/US-506Plans submitted for review 10/3/2017; under construction 11/3; awaiting transformer & hookup 1/22/2018; transformer installed 1/26/2018; awaiting testing 1/31; operational 2/22/2/2018
High Valley Center, 6250 US-285Thread
COTrinidadI-256On "Coming Soon" map updated 12/18/2014; permit application being processed 2/17/2015; permit process to be restarted as of 5/15; construction reportedly underway 7/13; operational 7/297/28/20159700 Santa Fe TrailThread
CTDanburyI-8420Contractor says coming soon as of 2/28/2017; under construction 7/21/2017; awaiting transformer and meter 9/15; transformer installed 9/21; operational 5/14/20185/14/2018
7 Backus AvenueThread
CTHartfordI-846Under construction 4/5/2018; operational 5/95/9/2018 42 Asylum StreetThread
CTManchesterI-8416Under construction 10/1/2017; awaiting transformer & hookup 10/24; transformer installed, awaiting power on / testing 11/4; operational 12/1712/17/2017
Plaza at Buckland HillsThread
CTMilford III-9514Under construction 12/19/2016; construction complete with transformer installed 3/18; operational 4/28
Connecticut Post Mall, 1201 Post RoadThread
CTStamford - Summer StreetUrban10Under construction 3/5/2019; operational 8/98/9/2019
1250 Summer StreetThread
CTStamford - High Ridge RoadCT-1512Construction complete 5/21/2019; operational 8/98/9/2019
1115 High Ridge RoadThread
CTWaterburyI-848Under construction 10/13/2018; awaiting transformer & hookup 12/2; transformer installed 12/13; operational 12/1912/19/2018
160 Kukas LaneThread
DEClaymontI-958Construction well underway 3/17/2018; transformer installed but no meter 5/14; operational 6/66/6/2018
Wawa, 691 Naamans RoadThread
DEDoverUS-138In permitting 9/17/2018; construction starting 11/14; transformer installed 12/22; operational 1/11/20191/11/2019
Wawa, 2800 North DuPont HighwayThread
DELewesUS-9/DE-18County says plans revised in May 2017; call for utilities to mark before digging 9/14/2017; construction started 10/18; awaiting transformer & hookup 11/23; operational 12/1612/16/2017
Wawa, 17663 Dartmouth DriveThread
FLAventuraI-9540Site reportedly chosen as of 8/10/2017; under construction 3/15/2018; operational 5/165/16/2018
Aventura Mall, new parking garageThread
FLAltamonte SpringsI-410In permitting as of 8/31/2017; under construction 2/28/2018; operational 5/265/26/2018
Renaissance Center, East Altamonte DriveThread
FLCelebrationI-48Permit A19-002086 issued, under construction 4/5/2019; transformer installed 4/30, awaiting meter; connected to grid 5/15, awaiting inspection/testing; operational 5/215/21/2019
6240 West Irlo Bronson Memorial Highway, KissimmeeThread
FLDelray BeachUS-441/FT12Under construction 6/22/2018; operational 7/17/1/2018
Delray Marketplace, 14851 Lyons RoadThread
FLFlorida CityUS-1 / Tpk10Under construction 3/30/2017; awaiting transformer & hookup 4/19; operational 5/225/22/2017
33505 S Dixie HighwayThread
FLFort Myers - Dani DriveI-7513Under construction 6/15/2018; operational 6/296/29/2018
Colonial Square Mall, 9357 6 Mile Cypress ParkwayThread
FLGainesvilleI-7510Permit application BP-18-03738 submitted for review 6/1/2018; under construction 2/11/2019; transformer installed while construction continues 4/8; meter installed 4/16; operational 4/174/17/2019
Butler Plaza, 3217 SW 35th BlvdThread
FLJacksonvilleI-29510Permit E-18-969696.000 issued 6/14/2018; under construction 7/19; operational 8/308/30/2018
Wawa, 4866 Gate ParkwayThread
FLLive OakI-1010Under construction 7/15/2017; operational 8/208/20/2017
Busy Bee Truck Stop, 6886 US-129Thread
FLMarathonUS-14Tesla reports this site is in permitting 7/26/2014; lease agreement signed 11/22; under construction 3/22/2015; operational 5/25/2/2015Florida Keys / Marathon AirportThread
FLMiami - BrickellUrban24Under construction 11/5/2017; operational 3/16/20183/16/2018
Brickell City Center, 701 South Miami AvenueThread
FLMiami - Mary Brickell VillageI-954Operational 5/5/20195/5/2019
71 SW 10th StreetThread
FLMiami - NE 41st StreetI-95/I-19514Operational 6/23/20186/23/2018
90 NE 41st StreetThread
FLMiami - SW 8th StreetI-9510Operational 5/31/20185/31/2018
701 South Miami AvenueThread
FLNaplesUS-418
Plans submitted for review 5/6/2016; variance recommended for approval by Planning Advisory Board 6/8; variance request withdrawn by Tesla 8/4, building permit #161757 under review; under construction 11/12; awaiting power on / testing 1/11/2017; operational 2/232/23/2017
NW corner of parking garage, 499 Bayfront Place
Thread
FLOrlandoI-410Consruction starting 11/13/2017; waiting for transformer & hookup 12/12; transformer installed 1/5/2018; meter installed 2/20; power on 3/1, awaiting testing; operational 3/93/9/2018
Wawa, 6500 West Sand Lake RoadThread
FLOrlando - North Alafaya TrailFL-40812Under construction 11/26/2018; awaiting power on / testing 1/20/2019; operational 2/142/14/2019
435 North Alafaya TrailThread
FLPembroke PinesI-48Permit application 169584 submitted 3/22/2018; permit issued 6/28; operational 10/1110/11/2018
14916 Pines BlvdThread
FLPinellas ParkI-2758Under construction 7/23/2017; operational 8/108/10/2017
Wawa, 3101 Gandy BlvdThread
FLPlantationI-758site negotiations to take place in October 2014; permit B14-04072 filed 12/19; 11 environmental conditions enumerated 12/27; plans resubmitted 2/3/2015; 14 conditions remain to be resolved 3/19; 11 conditions remain 3/20; 7 conditions remain 3/24; 2 conditions remain 3/26; passed engineering review 4/7; construction began 8/12; waiting for transformer 10/2; transformer installed 11/30; power connected and inspections in progress 12/17; operational 12/1912/19/2015near Chili's, 813 South University DriveThread
FLRiverviewFL-40810Under construction 12/24/2018; awaiting power on / testing 2/9/2019; operational 2/142/14/2019
10665 Big Bend RoadThread
FLRiviera Beach
8Found under construction 2/9/2015; operational 3/203/20/2015at Service Center, 4651 Dyer BlvdThread
FLRiviera Beach - Garden RoadI-958Awaiting transformer & hookup 12/9/2018; transformer installed 12/14; operational 12/2012/20/2018
7289 Garden RoadThread
FLSarasotaI-7520Source implied site will be by new Whole Foods store as of 6/15/2017; permit 17 133570 00 BE issued 6/21; under construction 7/15; transformer and meter installed 8/14, awaiting testing; operational 8/198/19/2017
~5288 University ParkwayThread
FLSt JohnsI-9510Minor Commercial Plan Review 20180000012 submitted 4/27/2018, approved 6/12; under construction 11/26; operational 12/1912/19/2018
2220 County Road 210WThread
FLTallahasseeI-105Sources say coming soon as of 7/8/2015; construction recently underway as of 8/29; awaiting transformer & meter 9/12; meter installed 9/199/23/20151400 Village Square BlvdThread
FLTampaI-48Consruction complete, awaiting transformer & hookup 1/4/2018; operational 2/242/24/2018
Wawa, 2502 North 50th StreetThread
FLTampa - West Swann Avenue, FLI-27510Plans approved 3/26/2018; under construction 6/23; transformer installed but no meter 7/12; operational 8/18/1/2018
2100 West Swann AvenueThread
FLWest MelbourneI-9510Florida City construction crew said headed here next as of 4/19/2017; City Manager says Tesla has submitted application as of 7/10; awaiting transformer & hookup 11/23; transformer installed 12/13; operational 12/1612/16/2017
Hammock Landing Shopping CenterThread
GAAcworthI-7514Under construction 7/19/2019; operational 8/188/19/2019
3500 Baker RoadThread
GAAlpharetta - AvalonGA-40012Under construction 10/23/2019; awaiting transformer / hookup 11/30; transformer installed 12/12; operational 1/8/2020
5185 First StreetThread
GAAthensUS-788Under construction 5/5/2018; operational 5/175/17/2018
1791 Oconee ConnectorThread
GAAtlanta - Lenox RoadGA-400/GA-14116Permit application BB-201707708 submitted 10/23/2017; under construction 5/24/2018; operational 8/238/23/2018
1705 Mall of Georgia Blvd.Thread
GAAtlanta - Peachtree RoadGA-400/GA-1415Permit application BB-201707708 submitted 10/23/2017; under construction 5/24/2018; operational 8/318/31/2018
1705 Mall of Georgia Blvd.Thread
GAAugustaI-20
Sources say coming soon as of 2/27/2016; Tesla says approaching construction phase as of 3/25; building permit issued 5/3; transformer installed 6/5; operational 6/116/11/2016
Sheraton, 1069 Stevens Creek Road
Thread
GAAugusta - Bel Air Frontage RoadI-2010Under construction 12/1/2018; transformer installed 12/9, awaiting power on / testing; operational 12/1312/13/2018
4329 Bel Air Frontage RoadThread
GABufordI-8512Tesla reportedly pursuing a site here as of 3/17/2017; permit application submitted 9/28; permit issued 5/22/2018; under construction 9/6; transformer installed 10/9; operational 11/511/5/2018
1705 Mall of Georgia Blvd.Thread
GAKingslandI-956Lease agreement approved 9/14/2015; under construction 10/31; to be tested 11/17; operational 11/1711/17/2015Kingsland Welcome Center, 1190 East Boone AvenueThread
GALithoniaI-2012Under construction 6/15/2019; pedestals installed 10/1, awaiting power on / testing; power on 10/10; operational 10/1610/16/2019
3045 Panola RoadThread
GAMacon III-7512Tesla reportedly plans on building at this site in Fall 2018 as of 6/21/2018; under construction 12/2; transformer installed 12/11, awaiting power on / testing; operational 12/2212/22/2018
265 Tom Hill Sr RoadThread
GAMetterI-168Under construction 10/22/2019; operational 11/2711/27/2019
1118 South Lewis StreetThread
IAAltoonaI-808In permitting 12/19/2018; under construction 12/22; awaiting testing 2/9/2019; operational 2/162/16/2019
Kum 'n Go, 1430 1st Avenue NThread
IACoralvilleI-808
Upcoming supercharger mentioned in Board of Adjustment meeting 3/21/2016; Tesla says approaching construction 7/8; construction began 7/16; awaiting transformer & hookup 8/2; transformer installed 8/13, awaiting testing; operational 9/299/29/2016
Hy-Vee, 2008 8th Avenue
Thread
IACouncil BluffsI-29/I-808Under construction 3/3/2015, near completion; operational 3/10/20153/10/20153815 Metro DriveThread
IADavenportI-808
permit issued 7/25/2016; found under construction 8/30; transformer installed but no meter 9/13; connecting to the grid 10/11; operational 10/2010/20/2016
Hy-Vee, 4070 East 53rd Street
Thread
IADowsI-358Agreement in place with site as of 5/18/2017; under construction with transformer installed 6/17; operational 6/306/30/2017
Dows Junction, 904 Cardinal Ave.Thread
IADubuqueUS-61/US-2012Under construction 3/31/2018; operational 5/25/2/2018
Hy-Vee, 400 South Locust StreetThread
IAShelbyI-808Variance request approved by city council 6/5/2018; under construction 11/28; operational 1/7/20191/7/2019
12 East StreetThread
IAWest Des MoinesI-808
In contract negotiations as of 5/6/2016; construction begun 7/22; awaiting transformer & hookup 8/8, transformer installed 9/30; site energized and awaiting testing 10/6; operational 10/2010/20/2016
Hy-Vee, 1725 Jordan Creek Parkway
Thread
IDBoiseI-848Permit issued 5/22/2015; construction started 6/25; construction apparently complete with transformer in place 7/26; operational 8/58/5/2015Oxfod Suites Hotel, 1426 South Entertainment AveThread
IDCoeur d'AleneI-906Original site (Springhill Suites) had to be scrapped for zoning reasons; looking for new site as of 9/16/2014; permit approved for new site 1/7/2015; pavement markings / survey markers found at site 2/2; construction underway 2/13; waiting for transformer 2/20; transformer in place 2/25; electrical hookup and inspection completed 2/27; operational 3/43/4/2015TM coming soon page 3502 North Fruitland LaneThread
IDIdaho FallsI-15
City council approved cost-sharing plan 12/17/2015; permitting expected complete by end of April 2016; pavement markings 4/25, operational 6/96/9/2016
MacKenzie River Pizza, 1490 Milligan Road
Thread
IDPocatelloI-15/I-86
Sources say coming soon as of 2/1/2016; under construction 4/22; awaiting transformer and hookup 5/6; operational 5/245/24/2016
Clarion Inn, 1399 Bench Road
Thread
IDTwin FallsI-848Tesla says "We are actively working on a site in the Twin Falls area" as of 8/12/2015; construction began 10/5; repaving and restriping 10/26-27, then hookup and testing; operational 10/2810/28/2015Twin Falls Tourist Center, 2015 Nielsen Point PlaceThread
ILBolingbrookI-3558Found under construction 4/21/2017; operational 5/315/31/2017
755 East Boughton RoadThread
ILChampaignI-74/I-578Found in late stage of construction 2/28/2016; transformer and power feed in place 3/12; operational 3/23
3/23/2016
Meijer, 2401 North ProspectThread
ILChicago - Lakeshore EastUS-4110Under construction 6/18/2017; operational 9/119/11/2017
225 North Columbus DriveThread
ILChicago - North BroadwayUS-4112Construction starting 11/28/2017; operational 1/30/20181/30/2018
3030 North BroadwayThread
ILChicago - South Canal StreetI-9012Operational 2/1/20182/1/2018
1100 South Canal StreetThread
ILChicago - West Schiller StreetI-9012Permit 100733296 issued 11/10/2017; operational 8/1/20188/1/2018
1457 North Halsted StreetThread
ILEffinghamI-706Source says coming soon as of November 2014; reported that site selected and permitting process starting 11/18; marking utility locations on site 2/25; construction in early stages 3/4; construction nearly complete 3/23
Jack Flash, 1200 North Keller DriveThread
ILEvergreen ParkI-57/I-946Construction complete, awaiting transformer / hookup 6/1/2019; operational 6/176/17/2019
9200 South Western AvenueThread
ILGlenviewI-29410Under construction 3/11/2018; operational 4/204/20/2018
1200 Noerh Milwaukee AvenueThread
ILMount VernonI-57/I-648
in planning stage 7/16/2016; under construction 9/28; operational 10/2710/27/2016
Holiday Inn, 222 Potomac Blvd
Thread
ILNorth AuroraI-888
operational 10/5/201610/5/2016
151 Hansen Blvd
Thread
ILPeruI-808City council passed parking lot variance 2/8/2016; under construction 5/28; transformer installed 6/13; operational 6/226/22/2016
HyVee, 1651 Midtown RoadThread
ILRolling MeadowsI-9010Plans on Plan Commission agenda 4/4/2017; approved by city council 5/8; pavement markings 6/10; construction started 7/20;awaiting transformer & hookup 8/27; transformer installed 8/28; operational 10/1810/18/2017
Meijer, 1301 Meijer DriveThread
ILRosemontI-29410Operational 11/411/4/2018
5220 Fashion Outlets WayThread
ILSkokieI-9410Under construction 12/31/2017; operational 1/29/20181/29/2018
5507 West Toohy AvenueThread
INCarmelUS-3110Plan approved by city 1/3/2018; under construction 4/27[; operational 6/21/TD] [TD]6/21/2018
Meijer, 1424 West Carmel DriveThread
INFishersUS-6910Lease agreement signed 11/1/2017; under construction 2/2/2018; awaiting transformer & hookup 2/24; operational 3/163/16/2018
9 Municipal DriveThread
INFort WayneI-6910Permit ELE-C-17-008554 applied dated 5/12/2017 & permit ELE-C-17-012640 dated 6/28/2017; construction in early stage 7/20/2017; transformer installed 8/24, awaiting power on / testing; operational 9/89/8/2017
Meijer, 6309 Lima RoadThread
INIndianapolis - Capitol AvenueI-7012operational 3/19/2019
109 South Capitol AvenueThread
INMerrillvilleI-6510Under construction 4/9/2018; operational 5/95/9/2018
Meijer, 611 West Lincoln HighwayThread
INTerre HauteI-708Under construction 3/3/2016; operational 3/303/30/2016
Meijer, 5600 E New Margaret DriveThread
INZionsvilleI-6510under construction 3/29/2019; operational 5/105/10/2019
Meijer, 6650 Whitestown ParkwayThread
KSColbyI-7010Under construction 8/29/2017; transformer installed, awaiting power on / testing 9/17; operational 10/210/2/2017
Oasis Travel Center, 700 East Horton AvenueThread
KSMissionI-358Under construction 3/28/2019; connected to grid, awaiting testing 5/16; tested 5/30; operational 5/315/31/2019
Hy-Vee, 6655 Martway StreetThread
KSOlatheI-358Approved by Planning Commission 2/22/2018; permit issued 5/3/2018; under construction 4/9/2019; transformer installed while construction continues 5/7; operational 6/106/10/2019
Hy-Vee, 18101West 119th StreetThread
KYBowling GreenI-65
4
Tesla says site selected as of 10/28/2015; permit application in process 5/17/2016, under construction 6/1; transformer installed 6/12; operational 6/246/24/2016
Meijer, 1676 Westpark Drive
Thread
KYKuttawaI-24/I-69
8
site reportedly selected as of 10/7/2016; under construction 12/10; construction mostly complete, waiting for transformer & hookup 12/24; operational 1/1/20171/1/2017
Hampton Inn, 62 Days Inn Drive
Thread
KYLouisvilleI-264/I-648On "Coming Soon" map updated 12/18/2014; Tesla says site selected and construction to begin soon as of 10/28/2015; permit EL965556 issued 11/13; construction started ~11/20; energized and testing but with construction unfinished 12/22; operational 12/3012/30/20152120 Gardiner LaneThread
LAAlexandriaI-49
8
Supercharger reported coming to new Holiday Inn as of 4/18/2015; under construction 5/9; awaiting transformer & hookup 5/24; operational 6/76/7/2016
Holiday Inn, 701 4th Street
Thread
LAMonroeI-20
8
site selected as of 4/30/2015; construction mostly complete 7/23; pole-mounted transformers installed 8/14, scheduled for testing/power on; operational 9/159/15/2016
Marriott Hotel, 4915 Pecanland Drive
Thread
LAShreveportI-49/I-20
8
Reported coming soon as of 4/18/2015; agreement with site in place 4/20; under construction 4/21; transformer installed and nearing completion 4/29; operational 5/125/12/2016
Mall St. Vincent
Thread
LASlidellI-108On "Coming Soon" map updated 12/18/2014; Tesla says will not be built in summer 2015 as of 4/26/2015; waiting for other construction at site 7/8; permitting reportedly completed, construction started as of 1/17/2016; transformer installed but construction continuing 1/27; energized and awaiting testing 2/2; operational 2/62/6/2016Fremaux Town Center, 1808 Shortcut HighwayThread
MABostonCity8Operational 9/11/20179/11/2017
800 Boylston StreetThread
MABoston - Richard B Ross WayUrban8Operational 4/27/20194/27/2019
1341 Boylston StreetThread
MABoston - South BayCity10Operational 12/4/201712/4/2017
8 Allstate RoadThread
MABraintreeI-938Minor modification approved by Planning Board 1/15/2019; under construction 6/15; operational 7/247/24/2019
250 Granite Street Street, 2nd floor of garageThread
MADedhamI-958Tesla service center w/superchargers approved by Dedham Board of Selectmen 1/8/2015; under construction 6/22; being connected to grid 7/298/8/2015840 Providence HighwayThread
MAFraminghamI-9012Construction starting 12/7/2017; operational 6/29/20186/29/2018
Shopper's WorldThread
MAHadleyI-9112To be installed with new gas station as of 12/4/2017; awaiting transformer 2/13/2018; operational 4/174/17/2018
25 Russell StreetThread
MAHudsonI-49510Hudson Light & Power says coming soon as of 10/13/2018; under construction 11/28; awaiting meter 1/17/2019; meter installed, testing 1/22; operational 1/291/29/2019
near Panera Bread, Highland CommonThread
MALeeI-908
on minutes of 2/22/2016 Planning Board meeting, continued until public hearing at 3/14 meeting; approved by Conservation Commission 4/6; construction began 6/27; awaiting transformer & hookup 8/5; operational 8/198/19/2016
Big Y, 10 Pleasant Street
Thread
MALeominsterMA-2,I-1908Under construction 6/19/2017; awaiting transformer & hookup 10/23; transformer & meter installed 11/29, awaiting power on & testing; operational 12/1312/13/2017
100 Commercial RoadThread
MALynnfieldI-9512Proposed Tesla charging station on Planning Board agenda for 8/30/2017; approved by Planning Board 10/11/2018; construction starting 5/3/2019; transformer installed 7/7 as construction continues; operational 8/28/2/2019
Market StreetThread
MAMansfieldI-4958On agenda of Planning Board meeting 6/6/2018; under construction 6/12; operational 6/296/29/2018
280 School StreetThread
MAMashpeeMA-2812Under construction 11/26/2018; operational 1/17/20191/17/2019
Mashpee CommonsThread
MDAberdeenI-958Agreement reached with Maryland DOT as of 8/4/2016; contractor requested permission from utilities to dig 4/26/2017; construction began 6/8/2017; operational 9/19/1/2017
Maryland House Travel Plaza on I-95Thread
MDAnnapolisUS-508Under construction 5/27/2018; awaiting transformer 8/25; transformer delivered 10/27; transformer hooked up 11/9; meter box installed 12/2; meter installed 3/15; operational 3/223/22/2019
217 Harker PlaceThread
MDBaltimoreI-958Under construction 7/5/2018; awaiting transformer / hookup 9/14; operational 10/2410/24/2018
1641 Whetstone WayThread
MDFrederickI-27012Building permit 184159 issued 11/28/2018; under construction 6/12/2019; transformer installed but awaiting pedestals 9/3; pedestals installed 11/4; operational 11/2611/26/2019
5500 Buckeystown Pike
Thread
MDGaithersburgI-270/I-37012Plans submitted 5/23/2017, approved 6/28/2017; permit dated 7/3; fencing up around site 9/1; under construction 9/5; transformer installed 11/15; operational 12/1312/13/2017
24 Grand Corner AvenueThread
MDGrasonvilleUS-5012Under construction 7/17/2017; transformer and meter installed 7/31; operational 8/188/18/2017
108 Jackson Creek RoadThread
MDHanoverMD-2958Under construction 5/21/2019; awaiting testing 11/7; operational 11/1411/14/2019
3rd floor of parking garage, 7787 Arundel Mills Blvd.
Thread
MDLaurelI-958Permit application submitted as of 12/18/2015; permit issued and utility markings at site 4/29; equipment staged on site and construction beginning 5/3; transformer installed 7/11, awaiting grid connection & meter installation; connected to grid and meter installed 7/22, awaiting testing; operational 9/239/23/2016
Towne Center at Laurel, 14700 Baltimore AvenueThread
MDLa ValeI-688In discussions with Canal Place Development & Preservation Authority as of 10/21/2016; under construction 6/29/2017; operational 9/19/1/2017
Sheetz, 11601 Winchester Road, Cumberland MDThread
MDNational HarborI-49512Contractor requested permission from utilities to dig on 7/7/2017; construction started 7/12; transformer installed while construction continues 8/30; awaiting power on & testing 9/21; operational 10/210/2/2017
165 Waterfront StreetThread
MDNorth EastI-9510Contractor requested permission from utilities to dig on 4/26/2017; under construction 6/24; awaiting transformer & hookup 8/24; transformer installed 9/2; operational 9/89/8/2017
Chesapeake House Travel Plaza on I-95Thread
MDRiverdale ParkUS-18Under construction 3/10/2019; transformer installed 7/12; operational 7/197/19/2019
6761 45th Street
Thread
MEAugustaI-958source says coming soon as of 12/30/2014; #19587 on October 2015 permit report as issued; construction well underway as of 11/17; operational 12/312/3/2015Marketplace at Augusta, 13 Stephen King Drive near Red RobinThread
MEBaileyvilleUS-1/ME-98Utility markings 4/15/2018; permit application in process 6/18; under construction with transformer installed 6/7; awaiting power on / testing 8/20; operational 9/129/12/2019
Big Stop, 32 Houlton Road
Thread
MEBrewerUS-1A
8
Agreement with Ruby Tuesday as of 7/3/2016; area fenced off 7/10, construction began 7/12; awaiting transformer & hookup 8/2; transformer installed 8/24; operational 9/19/1/2016
Ruby Tuesday, 5 Walton Drive
Thread
MEFreeportI-2958Construction reportedly to begin by 9/30/2017; operational 10/1910/19/2017
Trout Park parking area, Justin's way near Cross StreetThread
MEJackmanUS-2014Construction mostly complete 9/1/2019; operational 10/1910/19/2019
407 Main Street
Thread
MEKennebunk - NorthboundI-958Under construction 5/17/2018; transformer installed 6/7; operational 6/136/13/2018
I-95 Service Plaza
Thread
MEKennebunk - SouthboundI-958Under construction 5/17/2018; operational 6/296/29/2018
I-95 Service Plaza
Thread
MEMedwayI-958Town office says permitting is done as of 8/15/2018; under construction 5/24/2019; pedestals installed 10/1; operational 10/1710/17/2019
Big Stop, 1941 Medway Road
Thread
MEPortland

Tesla opted against a downtown parking garage site as of 3/2/2015 - new site needed; permit BLDC2018-00285 applied for 8/5/2018; under construction 4/24; pedestals installed 10/9; operational 10/1710/17/2019
295 Forest Avenue
Thread
MIAnn ArborI-948Possible building permit applied for 4/7/2015; permit ready to issue 4/29; under construction 6/2; construction complete and waiting for transformer 6/29; transformer installed 8/4; meter installed 8/16; operational 8/208/20/2015Meijer, 3145 Ann Arbor Saline RoadThread
MIAuburn HillsI-94
8
Construction imminent as of 9/12/2017; under construction 10/8; transformer installed 11/29, awaiting meter; meter installed 12/18; operational 3/22/20183/22/2018
Meijer, 800 Brown Road
Thread
MIBay City

In permitting process as of late March 2016; plans approved by Planning Commission 7/5; pavement markings 8/9; awaiting transformer & hookup 8/28; transformer installed 9/1; operational 9/16; irregularly non-operational or operating on lower power 10/7; fully operational 11/8TD] [TD]9/16/2016
Meijer, 2980 Wilder Road

MIBig RapidsUS-131
10
Under construction 10/16/2017; operational 3/8/20183/8/2018
Meijer, 15400 Waldron Way
Thread
MICadillac
8Permit issued 7/13/2015; construction fence up 9/8; construction appears complete with transformer installed but no meter 10/4; reported operational 10/29; temporarily offline 12/9; operational 12/2312/23/2016
Meijer, 3605 East 34th RoadThread
MIClareUS-127/US-10
8
Plan approved by city staff & DDA design committee 10/8/2018; under construction 4/5/2019; transformer installed and power on 5/3, awaiting testing; operational 5/185/18/2019
Doherty Hotel, 604 North McEwan
Thread
MIGaylordI-75
10
Under construction 10/1/2017; awaiting transformer & hookup 10/17; transformer and meter installed, connected to grid 6/10/2018; operational 6/216/21/2018
Meijer, 250 Meijer Drive
Thread
MIGrand Rapids

Permit issued 3/23/2015; construction started 5/21; will be ready for testing the week of 6/22-26; operational 6/246/24/2015Meijer, 5531 28th Street SEThread
MIHudsonvilleI-196
8
Special land use permit granted by planning commission 2/9/2018; under construction 4/10/2019; operational 8/168/16/2019
Meijer, 4075 32nd Avenue
Thread
MILansingI-94
8
Site plan approved 4/19/2017; Marshall MI contractor says Lansing to break ground 6/26; under construction 7/4; transformer installed 8/18; operational 9/119/1/2017
2505 Showtime Drive
Thread
MILivoniaI-96
10
Under construction 9/30; transformer installed 12/1, awaiting meter; operational 1/20/20181/20/2018
Meijer, 13000 Middlebelt Road
Thread
MILudingtonUS-10
8
Operational 6/23/20176/23/2016
Meijer, 3900 W US Highway 10
Thread
MIMarshallI-94
8
Construction to begin ~5/15/2017; construction well underway 6/24; awaiting transformer 7/3; operational 7/67/6/2017
15252 US Highway 27 North
Thread
MIMuskegonI-96/US-31
10
Under construction 10/18/2017; operational 2/26/20182/26/2018
Meijer, 5300 Harvey Street
Thread
MIPort HuronI-94/I-69
8
Permit issued 5/16/2016; Under construction 5/18; transformer & meter installed 7/22; operational 8/188/18/2016
Double Tree, 800 Harker Street
Thread
MIRosevilleI-94
8
Under construction 10/2; awaiting transformer & hookup 10/30; transformer installed 11/19, awaiting meter; operational 11/2311/23/2017
Meijer, 30800 Little Mack Avenue
Thread
MITraverse CityUS-31
10
Reportedly coming as of 2/17/2017; permits for fence and charging station dated 6/23 & 6/27; under construction 7/21; transformer installed 8/31; operational 9/89/8/2017
Meijer, 3955 US-31
Thread
MIWalkerI-96
8
In planning 9/18/2018; under construction 12/1; operational 12/2312/23/2018
Meijer, 2988 Walker Avenue NW Grand Rapids
Thread
MNAlbert Lea - Happy Trails LaneI-94

Under construction 5/3/2019; awaiting power on / testing 8/7; operational 8/158/15/2019
820 Happy Trails Lane
Thread
MNBaxter
8Source reports coming soon as of 7/29/2015; found under construction 9/26; operational 10/2110/21/2015Arrowwood Lodge, 6967 Lake Forest RoadThread
MNClearwaterI-94
8
Tesla says coming before end of 2016 as of 10/10/2016; Permit ELE1610-03417 issued 10/12; operational 12/2212/22/2016
Clearwater Travel Plaza, 950 Highway 24
Thread
MNDuluthI-354Tesla reports under construction as of 6/26/2015 and due to open in early July; permit BELEC1506-007; operational 7/177/17/2015210-212 West 1st Street, 4th levelThread
MNHinckleyI-35
Under construction 9/24/2015; operational 10/2110/21/2015Tobie's, 404 Fire Monument RoadThread
MNOakdaleI-94

Site discussed with Economic Development Commission 2/3/2016; Tesla says nearing construction phase as of 5/30; under construction 6/24; awaiting transformer & hookup 7/22; transformer installed 8/8; operational 8/168/16/2016
Hy-Vee, 7180 10th Street North

MNRobbinsdaleMN-100

Call for pavement markings 4/8/2019; fenced for construction 4/27; under construction with utility transformer installed 5/1; operational 6/186/18/2019
3435 West Broadway
Thread
MNRochesterUS-14/US-52
8
Plans submitted to the city as of 8/4/2017; notification of digging submitted 9/11; under construction 9/16; transformer installed 10/17; operational 10/2010/20/2017

Thread
MNSherburnI-90
8
Contractor asked utilities to mark site 6/16/2017; under construction 10/9; transformer installed 10/21; operational 11/2011/20/2017
Kum & Go, 600 State Highway 4
Thread
MOBethanyI-35
8
City says construction ready to start 3/8/2018; transformer installed as of 10/1, lease to be signed early October, under construction 11/20; operational 12/612/6/2018
Kum and Go, 3807 Miller Street
Thread
MOColumbiaI-706Source reports permit approved 11/7/2014; site reportedly blocked 12/9; in permitting as of 7/13/2015, permit processing (#15-2398) should be done by 7/17; permit issued 7/31; under construction 8/13; operational 9/109/10/2015Holiday Inn East, 910 Port WayThread
MOJoplinI-448In site negotiations as of 4/25/2016; discovered mostly complete with transformer installed 11/16; operational 11/3011/30/2016
Hotel Joplin, 3132 Hammons BlvdThread
MOKansas CityI-35
8
Under construction 5/3/2018; operational 5/255/25/2018
8301 North St Clair Avenue
Thread
MOMehlvilleI-55/I-270
12
Under construction 5/4/2018; awaiting transformer 5/10; transformer installed 5/30; operational 6/236/23/2018
18 South County Center Way, St Louis
Thread
MOMinerI-55/I-578Under construction as of 5/13/2016, operational 6/16/1/2016
Ruby Tuesday, 2612 East Malone AvenueThread
MOOsage BeachUS-54

Under construction 5/8/2017; transformer installed 6/1, awaiting power on / testing; power connected 6/8; operational 6/146/14/2017
Hy-Vee, 919 Highway D
Thread
MORollaI-448Site identified in news article 10/28/2015; permit EL2016-00210 ready 1/4/2016; construction began 7/18; transformer installed but construction continues 8/8; initial construction out of specifications and ripped out 9/2; operational 9/279/27/2016
Bandana's Bar-B-Q, 1705 Martin Spring DriveThread
MOSpringfieldI-448Out for contractor bid 4/26, in permitting process 5/23; permit ELE2016-00991 issued 10/5, under construction; operational 11/1611/16/2016
3070 North KentwoodThread
MOSt. CharlesI-705on Coming Soon map released 12/18/2014; permit number CU-2014-32 approved by city council 1/6/2015; utility markings noticed 2/11; equipment staged at site 2/20; construction began 2/23; transformer installed 4/1; to be tested 4/3; operational 4/144/14/2015Bogey Hills Shopping Plaza / 2021 Zumbehl RoadThread
MOSt. Charles - Streets of St. CharlesI-70

Under construction 4/13/2019; awaiting transformer 5/7; operational 5/155/15/2019
Parking garage, 1650 Beale Street
Thread
MOSt JosephI-29
8
Under construction 10/14/2018; awaiting testing 10/31; operational 11/2011/20/2018
201 North Belt Highway
Thread
MSGrenadaI-55
8
Tesla says they are installing a supercharger here as of 2/21/2017; operational 7/8
7/8/2017
Thread
MSHattiesburgI-59
8
Under construction 9/23/2019; operational 11/2411/24/2019
6109 US Highway 98
Thread
MSMcCombI-55
8
Mall management reports superchargers coming as of 7/2/2019; under construction 9/26; awaiting pedestals 11/6; operational 11/2411/24/2019
6Southwest Mall, 1436 Delaware Avenue
Thread
MSMeridianI-20/I-598Permitting in process or complete as of 4/30/2016; construction began 8/13; construction mostly complete with transformer in place 9/20; operational 10/710/7/2016
Bonita Lakes MallThread
MSPearlI-20
8
sources say construction to begin by spring 2016; operational 3/313/31/2016
200 Bass Pro Drive
Thread
MSTupeloI-22
8
Found under construction 4/24/2017; operational 5/115/11/2017
1001 Barnes Crossing Road
Thread
MTLimaI-15
Mentioned in city council meeting 12/14/2015; utility markings found 8/14/2016; construction in progress 9/14; awaiting transformer & hookup 11/30; transformer installed 12/7; operational 1/9/20171/9/2017
Jan's Cafe, 108 Bailey StreetThread
MTWest YellowstoneUS-20/US-1918
Tesla technician to go to site 5/24/2016; operational 5/255/25/2016
201 South Canyon StreetThread
NCAshevilleI-26/I-408Permit applications 15-10934, 15-10937, 15-10938 found 8/22/2015 being processed by city; permit approved 10/13; permit issued 10/16, reissued 10/23; under construction 10/30; transformer installed 11/23; awaiting power on/testing 12/9; operational 12/1612/16/2015800 Brevard RoadThread
NCCaryNC-54012Permit application WAKE-414277 submitted 4/3/2019; under construction 6/22; transformer installed while construction continues 7/2; pedestals installed 10/29; awaiting power on / testing 11/5; operational 11/2211/22/2019
7119 O'Kelly Chapel Road
Thread
NCCharlotte - Toringdon WayI-4858Permit application 396662 submitted 5/14/2019; under construction 8/5; transformer installed but awaiting pedestals 8/29; pedestals installed 10/25; awaiting power on / testing 11/6; operational 11/911/9/2019
3429 Toringdon Way
Thread
NCFayettevilleI-9516Found under construction 11/2/2017; operational 11/611/6/2017
1965 Cedar Creek Road
Thread
NCGreensboroI-408Permit applied for 8/2/2017; permit near approval 9/11; under construction 10/4; transformer installed while construction continues 12/1; construction complete 12/7; meter installed and connected to the grid 12/13; operational 12/1712/17/2017
Sheetz, 5421 Hornaday Road
Thread
NCHendersonI-858Operational 6/21/20196/21/2019
619 Ruin Creek Road
Thread
NCHickoryI-408In permitting as of 9/26/2017; plan review began 10/12; plans approved 11/22; under construction 2/22/2018; transformer installed 3/26; meter installed and energized 3/29, awaiting testing; operational 4/34/3/2018
Sheetz, 2191 13 Avenue Drive SE
Thread
NCKill Devil HillsNC-128Under construction 5/25/2019; operational 5/305/30/2019
2012 South Croatan Highway
Thread
NCMount AiryI-748Construction complete, awaiting transformer 6/7/2019; oeprational 6/226/22/2019
Sheetz, 2905 Rockford Street
Thread
NCRaleighI-44014Site reportedly selected as of 8/28/2017; awaiting power on / testing 10/28; operational 11/211/2/2017
4191 The Circle At North Hills Street
Thread
NCSmithfieldI-958Under construction 6/10/2019; pedestals installed 9/27; operational 10/410/4/2019
Sheetz, 1700 East Market Street
Thread
NCWallaceI-408Under construction 6/1/2018; operational 6/146/14/2018
River Village Place
Thread
NCWarsawI-406Under construction as of 2/23/2016; operational 3/113/11/2016Quality Inn, 2676 NC 24Thread
NCWilmingtonI-4010Under construction 4/5/2017; operational 5/165/17/2017
Mayfaire Town Center
Thread
NEGothenburgI-808Tesla looking for site as of 7/6/2016; equipment staged at site 11/3; transformer installed with construction continuing 11/19; to be tested 11/30; operational 12/212/2/2016
Nebraska Barn & Grill, 318 Platte River RoadThread
NEGrand IslandI-808Reportedly under construction 11/2/2016; in early stage of construction 11/27; transformer installed while construction continues 12/24; operational 1/5/20171/5/2017
Bosselman Travel Center, 3335 West Wood River RoadThread
NELincolnI-808Tesla looking for site as of 7/6/2016; application AA16055 filed with Planning Commission 8/1; construction started 11/3; awaiting transformer & hookup 12/4; transformer installed 12/24; operational 1/5/20171/5/2017
Hy-Vee, 5020 North 27th Street
Thread
NEOgallalaI-806Tesla looking for site as of 5/20/2016; construction well underway 11/2; construction complete, transformer installed 12/1; operational 12/212/2/2016
Holiday Inn Express, 501 Stagecoach TrailThread
NESidneyI-808Construction complete with transformer installed as of 5/2/2017; power connected 5/4, awaiting testing; operational 5/105/10/2017
Best Western, 645 Cabela Drive
Thread
NHLincolnI-93
6
Discussed at Lincoln Planning Board meeting 9/14/2016, to be followed up at 9/28 meeting; reported under construction 11/15; operational 11/2411/24/2016
RiverWalk Resort, 22 South Mountain Drive
Thread
NHSeabrookI-958Up for planning board approval 5/19/2015 and approved with conditions; construction began 8/22; waiting for transformer 9/25; transformer installed 10/5; operational 10/910/9/2015near Panera, 700 Lafayette RoadThread
NHWest LebanonI-898Permit approved 2/19/2015; construction began 5/11; construction mostly complete and waiting for transformer 6/20; transformer installed 6/25; operational 7/177/17/2015Price Chopper, 285 North PlainfieldThread
NJBarnegat TownshipGSP8Under construction 3/29/2019; transformer installed 5/11; operational 5/225/22/2019
Wawa, 945 West Bay Avenue
Thread
NJBasking RidgeI-788Site plan submitted 4/10/2018; before the Zoning Board of Adjustment 5/9/2018 and determined not to be complete; plan approved 10/9; permit application submitted 1/15/2019; permit approved 3/1; under construction 3/19; transformer installed 6/20; operational 7/137/13/2019
403 King George Road
Thread
NJBurlingtonI-958Found under construction 8/9/2017; operational 9/99/9/2017

Thread
NJCape May Court HouseGSP12Under construction 4/8/2019; operational 7/257/25/2019
11 Court House South Dennis Road
Thread
NJEast Brunswick - Brunswick Square MallI-95/NJ-1818Under construction 1/24/2019; transformer installed 4/2, awaiting power on / testing; operational 6/216/21/2019
755 State Route 18
Thread
NJEgg Harbor TownshipIGSP/ACE8Found under construction 5/26/2016, transformer installed 6/16; operational 6/226/22/2016
3121 Fire RoadThread
NJJersey CityI-956operational 2/15/20182/15/2018
160 First Street
Thread
NJJersey City - Mall Drive WestI-9520Supercharger crates being delivered 11/12/2017; construction mostly done 11/23; awaiting transformer & hookup 12/15; operational 2/232/23/2018
Newport Centre Mall
Thread
NJJoyce Kilmer Service AreaI-954Turnpike authority approved agreement 9/23/2014; equipment on site 3/13/2015; construction began 4/29, apparently complete and waiting for transformer 5/265/26/2015NB I-95 in East BrunswickThread
NJKearneyNJ-42/NJ-558Construction complete 10/21/2018, awaiting transformer / hookup; transformer installed 1/3/2019; operational 2/152/15/2019
Wawa, 200 Harrison Avenue
Thread
NJMarltonNJ-738Construction mostly complete 2/9/2019; transformer installed 4/2, awaiting power on / testing; operational 4/264/26/2019
500 Route 73 South
Thread
NJMolly Pitcher Service AreaI-954Turnpike authority approved agreement 9/23/2014; construction started 5/15/2015; construction complete and awaiting transformer 6/20; operational 7/8/20157/8/2015SB I-95 in CranburyThread
NJNorth BrunswickUS-110Under construction 3/1/2018; awaiting transformer 5/7; transformer installed 6/21; operational 7/197/19/2018
301 Grand Avenue
Thread
NJParsippanyI-2808Site plan before the Board of Adjustment 4/4/2018; under construction 12/4; awaiting transformer / hookup 1/4/2019; transformer installed, awaiting meter 1/22; operational 3/53/5/2019
Wawa, 350 New Road
Thread
NJPaulsboroI-2958Under construction 12/4/2018; operational 1/11/20191/11/2019
Wawa, 51 Berkley Road
Thread
NJRobbinsvilleNJ-738Construction mostly complete 2/9/2019; transformer installed 4/2, awaiting power on / testing; operational 4/264/26/2019
500 Route 73 South
Thread
NJRockawayI-8012Under construction 10/24/2018; awaiting transformer / hookup 1/4/2019; transformer installed 1/17; meter installed 1/30; operational 3/23/2/2019
395 Mount Hope Avenue
Thread
NJTinton FallsGSP8Found with construction complete and transformer installed 7/28/2015, awaiting inspection/power on/testing; operational 9/199/19/2015Jersey Shore Premium OutletsThread
NJToms RiverGSP8Under construction 6/2/2019; operational 10/1810/18/2019
Wawa, 379 Dover RoadThread
NJWoodbridgeUS-9/I-95/GSP8Found under construction 10/29/2017; awaiting transformer & hookup 11/27; transformer installed 1/11/2018; operational 3/103/10/2018
Wawa, 440 King Georges Road
Thread
NMAlbuquerqueI-406Site selected but permit application not yet filed 3/5/2015; construction began 5/1, to be complete by ~5/22; testing 6/1?; mysterious fence needed as of 8/3; fence line chalked on 8/18; fence construction started 8/24, operational 9/49/4/2015Holiday Inn Express, 2500 Menaul Blvd NEThread
NMDemingI-10

in planning / permitting as of 7/19/2017; permit application submitted 9/21; permit issued 9/25; under construction 10/6; operational 11/1811/18/2017
5R Travel Center, 1695 US-180Thread
NMLas VegasI-25
Site selected, in planning stage working with local utility 3/20/2015; contract award expected by 5/8; equipment staged on site 6/27; construction well underway 8/4; construction complete, awaiting meter and power on 8/30; meter and transformer installed 9/4, awaiting power on and testing; operational 9/119/11/2015Comfort Inn, 2500 North Grand AvenueThread
NMSanta FeI-25
10
In permitting as of 10/28/2016; construction began 1/18/2017; construction appears complete, awaiting transformer / hookup 3/10; transformer installed 4/1; operational 4/134/13/2017
Fashion Outlets of Santa Fe, Cerritos Road at I-25
Thread
NMSanta RosaI-406Under construction 3/4/2015, construction expected to be complete ~3/20; operational 3/133/13/2015Holiday Inn Express, 2516 Route 66Thread
NMTruth or ConsequencesI-25

Permit application ELEC_2017017432 dated 6/23/2017, awaiting power on / testing 7/4; operational 7/87/8/2017
Holiday Inn Express, 2201 F.G. Amin Street
Thread
NMTucumcariI-40
Media report of upcoming supercharger 2/3/2015; in early stages of construction 3/27; operational 4/194/19/2015Holiday Inn Express, 2624 South Adams StreetThread
NVBeattyUS-958Tesla working with site owners as of 9/14/2015 - hope to be operational by end of 2015; no construction as of 10/17; under construction 10/31; transformer installed 1/25/2016; operational 2/82/8/2016Eddie World, US-95 NorthThread
NVGardnervilleUS-3956Permit issued 8/24/2015; under construction 9/24; operational 10/22/201510/22/2015Topaz Lodge, 1979 S Highway 395Thread
NVHawthorneUS-958
Under construction 4/23/2016; awaiting hookup & testing 5/2; operational 5/35/3/2016
Port o Subs, Freedom Road near Bonanza RoadThread
NVHendersonI-11/I-515
12
Construction mostly complete 4/23/2018; operational 6/236/23/2018
Railroad Pass Casino, 2820 South Boulder Highway
Thread
NVIncline VillageNV-28
12
Permit WBLD17-103153 submitted 10/17/2017; permit issued 4/11/2018; Under construction 6/8; operational 8/29/20198/29/2019
930 Tahoe Blvd.
Thread
NVLas Vegas 2I-15
10
Under construction 11/24/2016; transformer installed but no meter 12/30; operational 3/9/20173/9/2017
Town Square, 6509 S Las Vegas Blvd
Thread
NVLas Vegas - LINQ HotelI-15
24
Permit B19-11759 approved and awaiting final inspection 7/16/2019; operational 7/197/19/2019
3545 South Las Vegas Blvd
Thread
NVLas Vegas - South Rampart BlvdNV-613
6
Operational 5/23/20195/23/2019
400 South Rampart Blvd.
Thread
NVRenoUS-3958
Under construction 5/4/2016; operational 5/55/5/2016
Atlantis Hotel / Casino, 3800 S Virginia StThread
NVReno - Sierra StreetI-80
10
Permit B19-02996 submitted 9/28/2018, issued 9/24/2019; under construction 11/4; awaiting transformer / hookup 12/12; operational 12/2312/23/2019
El Dorado Casino, 375 North Sierra Street
Thread
NVStatelineUS-5014Tesla in negotiations to nail down a site for over a year as of 10/13/2015; construction mostly complete 7/23/2017; operational 8/258/25/2017
Hard Rock Hotel, 50 US-50Thread
NVTonopahUS-95
Tesla in negotiations with City of Tonopah as of 10/14/2015; town board approved contract, sent to Tesla for signature 12/23; design finalized as of 2/29/2016, under construction 5/21; operational 6/26/2/2016
Pocket Park, 201 North Main StThread
NYBinghamtonI-81/I-88
Site selected and in design phase as of 7/8/2015; near construction phase as of 8/31; one permit remaining as of 10/2, in early stage of construction 10/15; transformer installed 10/30; testing 10/30; operational 10/3110/31/2015The Spot Restaurant, 1062 Front StreetThread
NYBronx - Bay PlazaI-95
12
Construction complete, awaiting transformer 3/10/2019; operational 4/104/10/2019
270 Baychester Avenue
Thread
NYBrooklynI-278
4
Operational 10/9/201710/9/2017
1133 North 12th Street
Thread
NYBrooklyn - Atlantic AvenueUrban
12
Operational 6/16/20196/16/2019
625 Atlantic Avenue
Thread
NYBrooklyn - Brooklyn MuseumUrban
10
Construction mostly done 7/31/2018; awaiting power on / testing 8/6; operational 9/299/29/2018
878 Washington Avenue
Thread
NYClarenceI-908Tesla of Canada says lease negotiations almost complete as of 7/1/2014; special exemption use permit on agenda of 11/5 Town board meeting; passed by Town Board; pavement markings 4/9/2015; construction began 4/13; awaiting transformer 5/5; transformer installed 6/4; operational 6/116/11/20154455 Transit RoadThread
NYClinton CornersTSP
8
Under construction 11/6/2017; operational 1/16/20181/16/2018
2300 Salt Point Turnpike
Thread
NYErwinI-86
10
Planning Board considered presented plan to be incomplete on 2/6/2017; under construction 6/3; transformer installed 7/23; unofficially operational 7/257/25/2017
125 Victory Highway
Thread
NYGlendale - Cooper AvenueUrban
10
Operational 6/16/20196/16/2019
8000 Cooper Avenue
Thread
NYGuilderlandI-90/I-87
20
Under construction 7/8/2017; operational 8/168/16/2017
Crossgates Mall
Thread
NYIslandiaI-495
10
Under construction 4/1/2018; meter installed 7/25; operational 8/108/10/2018
1750 Veterans Highway
Thread
NYIthacaNY-13/34/96
8
Under construction 7/19/2019; transformer and meter installed, awaiting testing 7/21; operational 7/257/25/2019
744 South Meadow Street
Thread
NYKingstonI-878Found under construction 9/27/2016; operational 10/1710/17/2016
660 Washington AvenueThread
NYNewburghI-84/I-876Construction began 4/9/2015, fixing construction issues and awaiting transformer and power hookup 5/9; ripped up and needing extensive work because of contractor error 5/28; work expected to be complete 6/5; operational 6/96/9/2015Cosimo's Restaurant, 1217 Route 300Thread
NYNew RochelleI-95
8
City Council authorized City Manager to execute contract with Tesla 2/14/2017; under construction 12/14; awaiting transformer / hookup 4/29; operational 6/46/4/2018
New Roc Garage, on Hueguenot Street between Harrison Street and Lecount Place
Thread
NYNew York - Allen StreetUrban
4
Operational 7/24/20187/24/2018
59 Allen Street
Thread
NYNew York - East 47th StreetUrban
4
Operational 4/23/2018
212 East 47th Street
Thread
NYNew York - Mott StreetUrban
2
Operational 2/21/20182/21/2018
106 Mott Street
Thread
NYNew York - West 75th StreetUrban
4
Operational 4/23/2018
201 West 75th Street
Thread
NYOssiningI-87
10
Construction mostly complete 10/29/2018; transformer installed 5/11/2019; operational 6/146/14/2019
214 South Highland Avenue
Thread
NYPlainviewI-495
16
Under construction 4/18/2018; operational 6/286/28/2018
1528 Old Country Road
Thread
NYPlattsburghI-87
Design complete as of 4/9/2016; under construction 4/22; construction complete 5/20, awaiting transformer & hookup by 5/27, operational 6/96/9/2016
Champlain Centre
Thread
NYQueens - Queens CentralUrban
10
Operational 10/2/201810/2/2018
90-15 Queens Boulevard
Thread
NYQueensburyI-87
Sources say coming soon as of 2/27/2016; under construction 7/10; operational 7/157/15/2016
near Friendly's, Aviation Mall
Thread
NYRoscoeNY-17
8
Construction began 10/22/2018; operational 2/11/20192/11/2019
1908 Old Route 17
Thread
NYSalamancaI-86
8
Under construction 12/29/2018; operational 1/31/20191/31/2019
777 Seneca Allegany Blvd
Thread
NYSouthamptonNY-276
Under construction 3/31//2016; awaiting transformer & hookup 5/26; operational 6/26/2/2016
850 Southampton Bypass
Thread
NYSyracuseI-906Permitting process will start by end of November 2014; Charlotte crew says they will be doing this site and Utica; Under construction 2/5/2015; to be tested 4/16; operational 4/164/16/2015Holiday Inn, 441 Electronics Parkway, Liverpool NYThread
NYTarrytownI-8712Permit process started 5/18/2016; under construction 10/6; transformer installed while construction continues 10/29; meter installed 11/29; operational 12/212/2/2016
Sheraton, 600 White Plains RoadThread
NYValley StreamNY-27
16
Under construction 4/18/2018; transformer installed 5/10; meter installed 5/16; operational 5/225/22/2018
Green Acres Mall, 23 Green Acres Road W
Thread
NYVictorI-90
8
On Planning Board agenda 1/24/2017; approved 1/24; construction complete and awaiting transformer 5/13; operational 6/16/1/2017
Eastview Mall, 7979 Pittsford
Thread
NYWaterlooI-90
8
Construction appears complete 2/1/2017; operational 3/103/10/2017
Del Lago Casino, 1133 NY-414
Thread
NYWatertownI-81
Sources say coming soon as of 2/25/2016; operational 6/246/24/2016
21182 Salmon Run Mall
Thread
NYWest NyackI-287
20
Construction mostly complete 12/10/2018; awaiting transformer / hookup 1/9/2019; transformer installed 4/30; connected to grid 5/30; operational 7/157/15/2019
1920 Palisades Center Drive
Thread
NYYonkersI-87
16
Under construction 12/26/2017; operational but inaccessible 3/30/2018; open 7/2/20187/2/2018
Archer Street Garage, Ridge Hill
Thread
NYYorktown HeightsTSP
10
Construction mostly complete 12/30/2018; transformer installed 4/11/2019; operational 6/136/13/2019
3303 Crompond Road
Thread
OHCambridgeI-40
8
Tesla says scouting for a site as of 4/13/2017; construction well underway 6/24; operational 7/267/26/2017
Sheetz, 2101 Southgate Parkway
Thread
OHCincinnati
6Tesla representative said supercharger would be coming here in presentation to Grove City city council 10/6/2014; under construction on 4/21/2015; awaiting transformer & hookup 5/10; operational 6/56/5/2015Service Center, 9111 Blue Ash RoadThread
OHCincinnati - Marburg AvenueI-71
10
Under construction 10/19/2018; operational 12/2212/22/2018
Meijer, 4825 Marburg Avenue
Thread
OHColumbusI-670
10
Franklin County Convention Facilities Authority considering Tesla proposal as of 2/27/2018; under construction 1/1/2019; transformer and meter installed 2/5; operational 2/142/14/2019
70 East Goodale Street
Thread
OHColumbus - Polaris ParkwayI-71
10
Construction starting 4/5/2019; transformer installed 5/1; meter installed 6/14; operational 6/216/21/2019
1177 Polaris Parkway
Thread
OHDublinI-270
8
Under construction 4/2/2018; awaiting transformer / hookup 7/5; transformer installed 8/8, awaiting power on / testing; tested 9/13, awaiting voltage adjustment from AEP; operational 9/159/15/2018
6175 Sawmill Road
Thread
OHMount GileadI-718operational 12/16/201612/16/2016
6200 State Route 95Thread
OHSanduskyOH-2
10
Under construction 6/20/2018; transformer installed while construction continues 6/25; operational 7/37/3/2018
4702 Milan Road
Thread
OHSheffieldI-90
8
Site agreement reportedly in place as of 12/5/2017; construction well underway 12/14; transformer installed 12/22; operational 2/92/9/2018
Sheetz, 5295 Detroit Road
Thread
OHStrongsvilleI-80
8
Planning application under review October 2017; under construction 12/4; transformer installed 1/25/2018; operational 2/92/9/2018
Sheetz, 9037 Pearl Road
Thread
OHToledoI-75
10
Building permit and certificate of zoning approved 6/28/2017; construction imminent 9/22; under construction 9/23; awaiting transformer & hookup 11/2; transformer installed 11/4, awaiting meter installation; meter installed 11/9, awaiting power on / testing; operational 11/2411/24/2017
Meijer, 1500 East Alexis Road
Thread
OHWest CincinnatiI-74
12
Permit application submitted 10/27/2017; under construction 1/17/2018; transformer installed while construction continues 2/18; meter installed, awaiting testing 4/11; operational 4/134/13/2018
Meijer, 6550 Harrison Road, Cincinnati
Thread
OKArdmoreI-35
Sources says this is coming "in the first two months of 2015"; Ardmore city official confirms it is in permitting 12/23/2014; permit issued 2/2/2015; pavement markings found 2/7; under construction 2/24; testing 3/11; operational 3/133/13/2015Interurban Classic Grill, 322 Holiday DriveThread
OKCatoosaI-448Lease approved 10/28/2015; under construction 5/16/2016; awaiting transformer & hookup 6/22; transformer installed 7/12; operational 7/207/20/2016
Cherokee Hard Rock Hotel & Casino, 777 West Cherokee StreetThread
OKOklahoma CityI-408Perry OK contractor reported that they will build Oklahoma City supercharger next, permit pending as of 3/13/2015; permit BLDC-2015-01023 issued 3/24/2015; construction began 6/2; awaiting transformer and hookup 7/14; transformer installed 7/26, waiting for meter and hookup; operational 7/317/31/2015Outlet Shoppes, 322 Outlet Shoppes DriveThread
OKPerryI-356Supercharger permit approved by city council 12/15/2014; construction began 3/6/2015; transformer installed 4/8; operational 4/154/15/2015west of Mobil station, 2812 Fir StreetThread
OKWeatherfordI-40
Under construction 2/24/2015; construction mostly complete 3/6; testing 3/11; operational 3/113/11/2015Lucille's Roadhouse, 1301 North Airport RoadThread
ORBaker CityI-848In permitting as of 5/15/2015; under construction 5/31; transformer in place 6/7 but construction still continuing; construction nearly complete 6/21; operational 6/256/25/2015Best Western, 1 Sunridge LaneThread
ORBandonUS-1018
Tesla planning site as of 6/27/2016; permits 194-16-001441-STR and 194-16-001442-ELEC submitted for review 7/26; permits issued 9/13, 9/15; construction underway 9/20; awaiting transformer & hookup 10/29; operational 11/411/4/2016
44 Michigan Avenue NE
Thread
ORBendUS-978construction well underway 5/19/2016, awaiting transformer 6/7; transformer delivered 6/13; operational 6/176/17/2016
Fred Meyer, 61535 S Hwy 97Thread
ORKlamath FallsUS-978
Permits 483-16-003505-ELEC-01 and 483-16-003505-STR submitted for review 11/15/2016; permits ready to issue 12/16; permits issued 1/10/2017; construction confirmed by inspection 2/9; operational 3/183/18/2017
1401 Washburn Way
Thread
ORLincoln CityUS-1018
Permit 519-16-001698-ELEC ready to issue 6/27/2016; construction began 7/13, passed final inspections 8/3; operational 8/188/18/2016
1500 SE East Devils Lake Road
Thread
ORPendletonI-84
Sources say this is coming as of 3/25/2015; under construction 4/24; construction nearly complete 5/10; waiting for transformer 5/18; operational 5/285/28/2015Wildhorse Resort & Casino, 46510 Wildhorse Blvd.Thread
ORSandyUS-268Construction well underway 10/1; waiting for transformer / hookup 10/21; operational 11/411/4/2015Fred Meyer, 16625 SE 362nd AvenueThread
ORSeasideUS-1018
Permit issued 5/31/2016; construction mostly complete 6/27; operational 7/17/1/2016
Seaside Factory Outlet Mall, 1111 North Roosevelt Drive
Thread
ORTigardI-5
10
Under construction 4/18/2018; operational 5/75/7/2018
9585 SW Washington Square Road
Thread
PAAltoonaI-998Under construction 10/25/2018; awaiting transformer & hookup 12/11; operational 12/3112/31/2018
Super Sheetz, 1915 Pleasant Valley Blvd
Thread
PABellefonteI-99
8
Construction beginning 9/28/2017; awaiting transformer & hookup 10/24; transformer installed 12/8; meter installed 12/9; operational 12/1412/14/2017
Weis Market, 170 Buckaroo Lane
Thread
PABloomsburgI-80
8
Construction appears complete 9/22/2016; not operational 9/26; operational 10/1410/14/2016
Ruby Tuesday, 11 Ricky Street
Thread
PABreezewoodI-76/I-70
8
Under construction 5/29/2017; awaiting transformer & hookup 6/28; transformer installed 7/13; connected and tested 8/2 but utility needs to fix power quality problems; operational 8/258/25/2017
Sheetz, 16417 Lincoln Highway
Thread
PACarlisleI-81
8
Under construction with transformer installed 9/1/2017; operational 9/309/30/2017
Sheetz, 1720 Harrisburg Pike
Thread
PAErieI-908Tesla says that a location has been chosen 12/6/2014; on Coming Soon map released 12/18/2014; Tesla says actively working on a site as of 10/26/2015; building permits in process as of 1/21/2016; construction started 4/18; transformer installed 5/18; operational 6/36/3/2016
Hilton Garden Inn, 2225 Downs DriveThread
PAFalls CreekI-80
8
Under construction 6/28/2017; transformer installed 7/15, connected to grid 7/18, awaiting testing; operational 8/28/2/2017
Sheetz, 1867 Rich Highway
Thread
PAHarrisburgI-838
Tesla says actively working on a site as of 10/26/2015; found under construction 4/10/2016; transformer installed 4/21; construction mostly complete 4/29; testing 5/4; operational 5/95/9/2016
near Weis Market, 3915 Union Deposit RoadThread
PAHermitageI-80
8
Construction mostly complete 8/4/2017; operational 9/59/5/2017
Sheetz, 2381 South Hermitage Road
Thread
PAIrwinI-76
8
Construction beginning 7/15/2017; operational 9/219/21/2017
Sheetz, 7821 US-30
Thread
PAMoosicI-818
Under construction 12/1/2016; operational 1/5/20171/5/2017
Shoppes at Montage, 1035 Shoppes Blvd
Thread
PAPhiladelphiaI-67610Construction mostly complete 12/9/2018, awaiting transformer & hookup; operational 12/2012/20/2018
420 North 20th Street
Thread
PAPhiladelphia - East MarketUrban
6
Under construction 5/19/2019; operational 5/265/26/2019
1118 Market Street
Thread
PASouth Whitehall (Allen Town)
8in contractor bidding process 3/1/2014; permit changes 4/4/2014; Planning Board recommended for approval 7/16; preliminarily approved 8/4; Board of Commissioners approval 8/11; site apparently scrapped by Tesla because of utility connection issues 12/4; in zoning appeals process at new site 8/14/2015; zoning hearing delayed because finalized lease agreement needed 8/26; Tesla cleared to proceed because no zoning relief required 9/23; construction started 12/4; transformers installed as of 1/3/2016 but construction work remains; connecting to grid 1/19; operational 1/211/21/20164650 Broadway, AllentownThread
PATannersville
8Tesla spokesperson claims ground breaking soon as of 9/25/2015; Simon Premium Outlets confirmed superchargers are coming 10/10, said they hope to have them open in November; construction appears complete 12/5; operational 12/1412/14/2015The Crossings Premium OutletsThread
PAWexfordI-79
8
Early stage of construction 8/16/2017; operational 9/209/20/2017
Sheetz, Nicholson Road at Wexford Bayne Road
Thread
PAYorkI-83
8
Equipment staged at potental site 6/4/2018; operational 7/317/31/2018
Sheetz, 160 Leader Heights Road
Thread
SCColumbiaI-77
8
On "Coming Soon" map updated 12/18/2014; Tesla says to break ground mid-August 2016; operational 11/1511/15/2016
Hilton Garden Inn, 8910 Farrow Road
Thread
SCFlorenceI-95
18
Operational 10/21/201710/21/2017
2701 David H. McLeod Blvd
Thread
SCGreenvilleI-85/I-3858in permitting as of 4/10/2014; contractor bids due 5/2/2014; permit approved 5/6/2014; construction began 5/12/2014; lawsuit halted construction - hearing in October; alternate site selected as of 11/21 and is in permitting process; lawsuit trial scheduled for August 24 2015; construction to begin soon at alternate site as of 7/13/2015; remaining equipment at old site removed 7/20; in permitting process as of 9/2; permit 15-2189 issued 9/4; construction equipment staged on site 9/23; under construction 9/26; construction complete with transformer installed 10/20, awaiting hookup & testing; connected to the grid 11/3; operational 11/911/9/2015106 Carolina Point ParkwayThread
SCMyrtle BeachUS-17
5
Permit application on 9/15/2016 agenda of Community Appearance Board; permit approved by Board with minor modifications 9/15; contractor waiting for approval from Tesla to begin construction 1/19/2017; construction started 2/21; construction appears complete with transformer installed 3/10; passed inspection, awaiting power on / testing 3/15; operational 3/243/24/2017
Coastal Grand Mall, 2000 Coastal Grand Circle
Thread
SDCusterUS-16
8
Permit reportedly issued as of 1/8/2018; under construction 3/22; operational 5/115/11/2018
Lynn's Dakota Mart, 800 Mount Rushmore Road
Thread
SDOacomaI-90
8
Under construction 9/25; operational 10/1610/16/2017
Al's Oasis, 1000 East South Dakota Highway 16
Thread
SDSioux FallsI-29
8
Permit application submitted 7/26/2017; under construction 9/2; awaiting transformer & hookup 10/13; operational 10/3010/30/2017
Hy-Vee, 1900 South Marion Road
Thread
SDSpearfishI-90
6
Construction complete 10/24/2017; operational 10/2910/29/2017
3275 Old Belle Road
Thread
SDWallI-90
8
To be built after tourist season as of 7/30/2018; under construction 5/14/2019; operational 6/56/5/2019
407 Main StreetThread
TNBristolI-70/I-77
8
In early stages of construction 5/27/2017; transformer and meter installed and connected to the grid 6/3; operational 6/176/17/2017
Sheetz, 2101 Southgate Parkway
Thread
TNCookevilleI-40
8
Under construction 7/15/2017' operational 10/2310/23/2017
Jackson Plaza Mall
Thread
TNDicksonI-40
8
Under construction 8/10/2017; transformer installed while construction continues 9/1; awaiting power on / testing 9/17; operational 9/209/20/2017
Holiday Inn Express, 100 Barzani Blvd
Thread
TNJacksonI-40
8
Reported to be coming after Memphis as of 8/4/2016; contruction reportedly mostly done 11/6; transformer & meter installed 11/13, awaiting testing; operational 11/3011/30/2016
Casey Jones Village, 50-56 Casey Jones Lane
Thread
TNKnoxvilleI-75/I-40
Under construction as of 5/1/2015; transformer in place 5/16; awaiting testing 5/22; operational 5/275/27/201511038 Parkside DriveThread
TNManchesterI-24
10
Construction mostly complete 3/24/2018; operational 7/27/2/2018
2224 Hillsboro BlvdThread
TNMemphisI-40
8
Encroachment variance applied for 7/25/2016; utility markings at site 9/12; equipment staged at site 10/4; under construction 10/6; awaiting transformer & hookup 10/28; transformer installed 11/8; operational 11/3011/30/2016
1203 Ridgeway Road
Thread
TNNashvilleI-65
looking for site as of 9/3/2014; on Coming Soon map released 12/18/2014; construction apparently complete 6/26/2015; operational 7/8/20157/8/20151641 Westgate CircleThread
TNNashville - Thompson LaneI-24
12
Under construction 9/24/2019; pedestals and transformer installed 11/21; operational 11/2211/22/2019
61 Thompson LaneThread
TXAmarilloI-408site may have been misunderstanding between HPWC and superchargers - no permit activity as of 8/23/2015; permit found 9/23; construction began 9/29; waiting for transformer and hookup 10/20; transformer installed 10/30; meter installed 11/3, waiting for inspection / power on; operational 11/511/5/2015Holiday Inn, 8271 West Amarillo BoulevardThread
TXArlingtonI-30
10
Agreement with Tesla approved by city council 6/7/2016; pavement markings at site 9/17; construction began 2/15; transformer installed (but no meter) while construction continues 3/13; meter installed 4/18; operational 4/224/22/2017
Convention Center, 1200 Ballpark Way
Thread
TXAustinI-35

Exemption review completed 11/7/2016; site plan approved 2/8/2017; pavement markings & flags on site 3/31; construction began 4/13; construction resumed 8/2 after hiatus; awaiting transformer & hookup 9/6; transformer installed 9/25; meter installed 11/7; awaiting power on / testing 11/14; operational 11/3011/30/2017
HEB, 6406 N Interstate Highway 35 Service Road Southbound
Thread
TXAustin - Stonelake BlvdI-35
18
Permit applications submitted 11/19/2018; permits issued 4/15; under construction 4/22; transformer installed, awaiting power on / testing 8/20; operational 8/288/28/2019
9800 1/2 Stonelake Blvd
Thread
TXBurlesonI-35W

Tesla called for pavement markings 3/13/2018; call for pavement markings because of imminent digging 5/20/2019; under construction 5/18; transformer installed while awaiting pedestals 9/7; pedestals installed 10/27; testing 12/12; operational 12/1512/15/2019
3313 Interstate 35W
Thread
TXChildressUS-287
8
Under construction 10/17/2016; operational 10/1910/19/2016
1300 Avenue F NW
Thread
TXCiscoI-208
On 1/18/2016 Tesla said coming in the first half of 2016; lease agreement signed as of 3/21; construction starting 5/19; transformer installed 7/17, awaiting testing; operational 8/198/19/2016
Flying J, 16851 Interstate Highway 20
Thread
TXDallasUS-75
10
Superchargers part of The Hill shopping center redevelopment as of 2/2/2017; under construction 1/23/2018; transformer installed 4/3; operational 4/184/18/2018
Treehouse, N Central Expressway at Walnut Hill Lane (NE corner)
Thread
TXDentonI-356All permitting reviews except planning completed by 11/13/2014; planning review completed 11/20; next step is pre-application conference; out for contractor bid as of 5/6/2015; permit processing due to be complete 6/26; will be out for contractor bids 6/29; permit approved 7/31; construction began 10/2; awaiting testing 10/30; operational 11/311/3/20152710 West University DriveThread
TXEl PasoI-10
8
Permit BCSN17-00002 under review as of 1/14/2017; under construction 3/16; transformer installed while construction continues 4/6; operational 4/224/22/2017
6401 Desert Blvd
Thread
TXFlatoniaI-10
8
Site agreement signed as of 1/2/2017; under construction 4/22/2017; awaiting power on / testing 4/30/2017; operational 5/135/13/2017
Amigo's Travel Center, NE corner of FM609 and I-10
Thread
TXFort StocktonI-10
8
Sources say coming soon as of 11/22/2016; permit found 12/1; call for utility markings 10/24/2017; permit cancelled; permit ready to issue at a new location 4/17/2018; call for pavement markings at two locations 5/17/2018; permit issued as of 8/13, construction started 9/4; transformer installed while construction continues 9/13; awaiting power on / testing 9/22; operational 10/1410/14/2018
Flying J, 2571 North Front StreetThread
TXFort Worth - Whitmore StreetI-30
16
Permit application submitted 3/26/2018; under construction 10/14; awaiting transformer & hookup 12/2; operational 12/1012/10/2018
2616 Whitmore StreetThread
TXGiddingsUS-290/US-77

Tesla called for pavement markings 6/25/2018; TDLR filing 4/25/2019; under construction 6/25; pedestals installed with transformer energized 10/1, awaiting testing; operational 10/1910/19/2019
CEFCO, 3025 East Austin Street
Thread
TXHenriettaUS-287
8
Tesla has discussed sites with Planning Department as of 10/25/2016; Under construction 5/20/2019; transformer installed 7/22; pedestals installed 9/25; awaiting testing 10/3; operational 10/510/5/2019
237 US-287 Frontage Road
Thread
TXHoustonI-45
Found under construction 6/22/2015; operational 7/97/9/2015Service Center, 14810 North FreewayThread
TXHouston - Northwest FreewayUS-290
8
Building permit submitted 2/14/2018; under construction 4/18; transformer installed 7/24; connected to grid 8/14; operational 8/188/18/2018
14620 Northwest FreewayThread
TXItalyI-35
8
Under construction 9/2/2017; operational 9/249/24/2017
1021 Dale Evans Drive
Thread
TXJunctionI-10
8
Construction complete 11/3/2016; transformer installed 11/22; power connected 12/16, awaiting testing; operational 1/5/20171/5/2017
Chevron, 2415 North Main Street
Thread
[TR] [TD]TX
KingsvilleUS-77
8
construction complete, awaiting transformer & hookup 10/20/2016; operational 11/1511/15/2016
Holiday Inn Express, 2400 South Highway 77
Thread
TXLaredoI-35
8
Operational 12/11/201712/11/2017
Embassy Suites, 110 Calle del Norte DriveThread
TXLindaleI-20
Site selected as of 11/20/2015; construction to begin March or April 2016; under construction 4/2; transformer installed, awaiting power on and testing 4/21; operational 6/86/8/2016
Collin Street Bakery, 17044 I-20Thread
TXMcAllenUS-83
8
Plans submitted for review 3/30/2017; plans approved 4/11; permit CMM2017-01891 issued 5/5, passed foundation inspection 5/18; transformer installed 7/22; operational 7/277/27/2017
Fairfield Inn & Suites, 2571 I-10 Service Read
Thread
TXMidlandI-20

Owner of truckstop says supercharger agreement in place as of 3/21/2016; operational 12/2412/24/2016
3001 Antelope Trail
Thread
TXNacogdochesUS-59
8
Under construction 9/11/2017; transformer installed while construction continues 9/17; awaiting power on / testing 9/21; operational 9/229/22/2017
2615 North Stallings Drive
Thread
TXOzonaI-10
8
Rumors say this will be a site as of 11/17/2016; confirmed under construction 11/22; construction mostly complete with transformer & meter installed 1/2/2017; operational 1/191/19/2017
Best Western, 1307 Avenue A
Thread
TXPecosI-20
8
Call for utility markings 10/24/2017; construction well underway 10/1/2018; transformer installed 10/5, awaiting meter; operational 10/1410/14/2018
Flying J, 100 East Pinehurst Street
Thread
TXPlanoI-35
12
Permit BLD17-18194 applied for 11/2/2017; under construction 1/26/2018; operational 3/303/30/2018
Shops at Town Center, 5725 Legacy Drive
Thread
TXRichmondI-69
8
Under construction 9/30/2018; transformer installed, awaiting power on / testing 12/13; operational 12/1712/17/2018
20500 Southwest Freeway
Thread
TXSan AntonioI-10
10
Permit 2454033 applied for 2/7/2019; all but tree review approved 3/7; under construction 7/9; transformer installed 8/13; meter installed 8/20; operational 8/228/22/2019
Huebner Oaks, 11745 Interstate Highway 10 West
Thread
TXShamrockI-406On Coming Soon map released 12/18/2014; lease signed November 2014; reported under construction 2/9/2015; construction complete 2/18; operational 2/202/20/2015U-Drop InnThread
TXSouthlakeTX-114
10
Special use permit is on Planning & Zoning Commission agenda for 8/17/2017 (detailed plans here); approved by Planning & Zoning Commission 9/21; approved by City Council 10/3; permit issued 11/21; utilities marked 12/4; construction began 1/9/2018; transformer installed 2/26; meter installed 4/16; operational 4/184/18/2018
Southlake Town Square, 1240 Main Street
Thread
TXSulfur SpringsI-308City council passed lease agreement 1/5/2016; construction under way 5/6; awaiting transformer & hookup 6/17; operational 6/296/29/2016
300 block of TomlinsonThread
TXSweetwaterI-208
On 2015 map released 12/18/2014; on 1/18/2016 Tesla said coming in the first half of 2016; site selected and approaching construction phase as of 2/27; permitting in progress as of 4/3; permitting process apparently complete 4/12; construction started 6/11; construction complete 8/1, awaiting transformer & hookup; operational 8/198/19/2016
Holiday Inn Express, 300 SE Georgia Avenue
Thread
TXTexarkanaI-30
8
Permit application reportedly under review 9/21/2016; under construction 12/5; operational 12/2112/21/2016
Olive Garden, 3101 Mall Drive
Thread
TXThree RiversI-37

Mentioned in article dated 8/10/2016; awaiting transformer & hookup 8/21; transformer & meter installed 9/15, awaiting testing & power on; operational 9/309/30/2016
Love's Travel Center, 2645 S. Hwy 37, I-37 Exit 72
Thread
TXVan HornI-10
8
Sources say coming soon as of 11/20/2016; City confirms that permit has been applied for 12/2; under construction 12/27; complete and awaiting testing 1/29/2017; operational 2/172/17/2017
Hampton Inn, 1921 Frontage Road
Thread
TXVictoriaUS-59/US-87
Site on September building report dated 9/21/2015; construction well underway 12/12; operational 12/3012/30/20153107 South Laurent StThread
TXWebsterI-45

Under construction 4/18/2019; awaiting testing 9/12; operational 9/199/19/2019
1141 South Kobayashi Drive
Thread
UTPriceUS-1918Reportedly out for contractor bid 3/6/2015; contractor award delayed as of 4/20; conditional use permit approved ~6/26; construction to begin soon as of 9/16; operational 10/1610/16/2015Holiday Inn Express, 925 Westwood BoulevardThread
UTSalt Lake CityI-80/I-1510Construction started 2/18/2015; operational 3/63/6/2015Tesla Service Center, 2312 South State StreetThread
UTTremontonI-15/I-84
Bid awarded to contractor 2/10/2015; operational 4/1/20154/1/2015Hampton Inn, 2145 West Main StreetThread
UTTooeleI-806County official said supercharger was coming as of November 2014; approved by county planning & zoning 12/16; under construction 2/4/2015; mostly complete 2/18; operational 2/242/24/20151568 East Saddleback Blvd.Thread
VAArlingtonI-66
16
Permit application ZADM180559 approved 7/27/2018; under construction 12/5; operational 4/18/20194/18/2019
Market Commons, 2800 Clarendon Blvd, 5th floor of garageThread
VACharlottesvilleI-64
8
Tesla says coming within the next year as of 3/16/2015; permit B201700323NC applied for 2/9/2017; under construction 6/6; awaiting meter and power on 6/29; meter installed 9/2; operational 9/79/7/2017
Hyatt Place, 2100 Bond StreetThread
VAChesterI-95/VA-288
8
Construction mostly complete as of 9/7/2017; transformer installed 9/13; operational 9/209/20/2017
Wawa, 11701 Jefferson Davis HighwayThread
VAFredericksburgI-95
8
Permit application ST17-0033 submitted for review 9/25; clearing & grading permit approved as of 12/2; under construction 2/10/2018; transformer installed 4/6; operational 4/114/11/2018
Wawa, 10060 Jefferson Davis HighwayThread
VAHaymarketI-66
8
Permit issued as of 10/18/2018; awaiting transfomer / hookup 12/14; operational 12/1912/19/2018
Sheetz, 15315 Washington StreetThread
VALeesburgVA-7
12
Under construction 2/19/2019; transformer installed 7/3; operational 7/197/19/2019
1602 Village Market BlvdThread
VALexingtonI-81/I-64
Tesla says coming within the next year as of 3/16/2015; plans submitted for permitting ~11/9; permit issued 11/23; under construction 11/29; operational 12/1612/16/2015Holiday Inn Express, 880 North Lee HighwayThread
VAMount JacksonI-81
8
Construction mostly complete 10/16/2017; awaiting transformer & hookup 11/8; operational 12/412/4/2017
Sheetz, 227 Conicville RoadThread
VANewport NewsI-64
12
Under construction 8/1/2019; pedestals installed 10/23; operational 11/1411/14/2019
12300 Jefferson AvenueThread
VANorfolkI-646In permitting as of 4/23/2015; Nashville installation crew to go here ~7/1; construction began 7/8; construction complete 7/29 but awaiting 450 foot connection to the grid; connecting to the grid 8/4; planned power outage needed to complete grid connection as of 8/11; operational 8/13; temporarily closed 8/14; will likely remain closed "for at least a few more weeks" as of 8/27; transformer turned on but chargers still off 9/28; operational 10/1710/17/20155900 East Virginia Beach BoulevardThread
VARichmondI-64
8
Sources say coming soon as of 10/12/2017; under construction 10/30; operational 12/1912/19/2017
Hyatt, 4401 South Laburnum Avenue?Thread
VASalemI-81
8
Under construction 5/13/2019; transformer installed 6/26; pedestals installed 10/26; awaiting testing 11/7; operational 11/1511/15/2019
Sheetz, 1340 West Main StreetThread
VASpringfieldI-95
18
Permit 173030246 submitted for review 10/30/2017, approved 4/3/2018; under construction 4/17; awaiting transformer 5/10; transformer installed 6/7; operational 6/216/21/2018
Springfield Town Center, 6500 Springfield MallThread
VAStauntonI-64/I-81
8
Under construction 12/20/2018; operational 1/30/20191/30/2019
1250 Richmond AvenueThread
VAWythevilleI-81/I-77
Tesla says coming within the next year as of 3/16/2015; Tesla says will be permitted soon and started in 2015 as of 9/25; plans submitted for permitting ~11/9; permit issued 11/24; reportedly under construction 12/14; energized and ready for testing 12/23; operational 12/3012/30/2015Holiday Inn Express, 165 Malin DriveThread
VTBerlinI-89
8
Approved by Development Review Board 6/21/2016; Under construction 8/30/201610/3/2016
159 Paine Turnpike NorthThread
VTBrattleboroI-918Tesla reportedly looking for site 7/7/2014; construction well underway 11/29; awaiting transformer and hookup 12/23; transformer to be installed ~1/12/2015; operational 1/161/16/2015Price Chopper Plaza, 499 Canal StreetThread
VTSouth BurlingtonI-898Reportedly coming as of 12/12/2014; in permitting 6/2/2015; approved by Development Review Board 7/14; waiting for one more permit approval, construction began 9/29; transformer in place 10/22; operational 11/411/4/2015222 Dorset StreetThread
WAAberdeenUS-101

Superchargers to be part of upcoming Gateway Center development as of 9/6/2016; construction well underway 10/18; transformer installed while construction continues 11/5; operational 12/2112/21/2016
107 South F StreetThread
WAArlingtonI-5
16
Construction complete 6/17/2017, awaiting transformer; transformer installed 6/22, awaiting testing, operational 6/276/27/2017
Angel of the Winds Casino, 3438 Stoluckquamish LaneThread
WAAuburnWA-18/WA-167
8
Permit application TEN19-0006 submitted 1/17/2019; permit approved 3/12, issued 5/13; under construction 5/28; pedestals installed 10/10; operational 10/2210/22/2019
1101 Outlet Collection Way SWThread
WABlaineI-5
12
Under construction 5/15/2019; pedestals installed 10/2, awaiting transformer; operational 10/1110/11/2019
81 Birch Bay Square StreetThread
WACle ElumI-90
12
Construction mostly complete 11/20/2018; operational 12/812/8/2018
811 WA-970Thread
WAIssaquahI-90
8
Construction starting 11/5/2017; site abandoned 3/27/2018; construction restarted 8/20; awaiting transformer 9/22; operational 10/1910/19/2018
Fred Meyer, 6100 East Lake Sammamish ParkwayThread
WAKennewickI-828Found under construction 8/4/2015; mostly complete and awaiting testing and power on 8/25; operational 9/49/4/2015Fred Meyer, 2811 West 10th AvenueThread
WALeavenworthUS-2
8
Tesla says a site is planned here as of 3/31/2017; permit 3033128E application submitted 6/1/2018; under construction 6/7; transformer installed while construction continues 6/25; awaiting power on / testing 6/29; operational 7/287/28/2018
Dan's Market, 1329 US-2Thread
WALynnwoodI-5/I-405
10
Construction starting 11/4/2017; transformer installed 1/9/2018; operational 1/191/19/2018
Fred Meyer, 2902 164th Street SWThread
WAMonroeUS-2
12
Under construction 3/21/2017; awaiting transformer 3/28; transformer installed 4/13; operational 4/254/25/2017
Fred Meyer, 18805 US-2Thread
WASeattleI-5
20
Permit 6685741-EL applied for as of 1/3/2019; permit issued 4/5; under construction 5/12; operational 7/87/8/2019
601 Union StreetThread
WASequimUS-101
8
Beginning construction 6/8/2017; awaiting power on / testing 6/30; operational 7/47/4/2017
Holiday Inn Express, 1441 East Washington StreetThread
WAVancouverI-5
12
Under construction 10/27/2017; transformer & meter installed 12/5, awaiting testing; operational 2/12/20182/12/2018
Fred Meyer, 800 NE Tenney RoadThread
WIHowardI-41
8
Site selected as of 2/20/2017; under construction 6/26; awaiting testing 8/29; operational 9/89/8/2017
Meijer, SE corner of Shawano Ave & I-41Thread
WILake GenevaUS-12
6
Under construction 7/2/2019; awaiting transformer 8/20; transformer installed, awaiting pedestals 9/13; operational 9/269/26/2019
7035 Grand Geneva WayThread
WIMadison III-90/I-94

Plans submitted for review as of 9/25/2017; under construction 10/21; transformer installed 11/22, awaiting power on / testing; operational 12/1912/19/2017
Hy-Vee, 3801 East Washington AvenueThread
WIOak Creek

Plans submitted to Plan Commission for approval 8/8/2017; equipment staged at site 9/27; under construction 9/30; awaiting transformer 11/15; operational 1/25/20181/25/2018
Meijer, 171 West Town Square WayThread
WIOshkoshI-41
6
Plans presented to council with recommendation to approve 10/10/2017; operational 12/2012/20/2017
Festival Foods, 2415 Westowne AvenueThread
WISheboyganI-438Conditional use permit application submitted, under review 4/28/2015; construction began 8/17; construction appears complete with transformer installed 10/4; operational 10/710/7/2015Festival Foods Market, 595 South Taylor DriveThread
WIWausau
4
Tesla says site will be selected soon as of 8/2/2016; Stettin Town Board set to approve 2-year temporary site 8/22; temporary site operational 11/2411/24/2016
S 22nd Avenue and Corporate DriveThread
WIWausau

Construction mostly complete with transformer installed as of 9/4/2017; operational 10/610/6/2017
Hilton Garden Inn, 2101 North Mountain RoadThread
WVCharlestonI-64/I-77

Tesla in discussions with site owner(s) as of 2/26/2017; site agreement completed 4/4; under construction 4/13; awaiting transformer & hookup 5/14; transformer installed 5/23; operational 6/86/8/2017
Courtyard by Marriott, 100 Kanawha Blvd. EastThread
WVHuntingtonI-64
8
Construction started 11/5/2017; transformer installed 12/26; operational 1/11/20181/11/2018
Sheetz, 432 18th Street WThread
WVMartinsburgI-81
8
Under construction 8/17/2017; transformer installed 9/21; operational 9/299/29/2017
Sheetz, 1465 Edwin Miller BlvdThread
WVMorgantownI-68
8
Reportedly coming as of 10/26/2016; lease agreement signed 12/6; in permitting review 4/3/2017; construction began 5/22; transformer installed 9/2; meter installed 9/6; operational 9/89/8/2017
Sheetz, 21 Asturias LaneThread
WVMount HopeI-64
8
Construction plans have been developed as of 6/29/2017; construction started 8/28; transformer and meter installed 11/15; operational 2/20/20182/20/2018
Sheetz, 5481 Robert C. Byrd Drive, Mt Hope WVThread
WVParkersburgUS-50
6
Construction well underway with transformer installed 1/26/2019; operational 3/53/5/2019
Sheetz, 1102 7th StreetThread
WVWestonI-79
8
In initial stage of construction 6/15/2017; operational 10/210/2/2017
Sheetz, 39 Berlin RoadThread
WYEvanstonI-80
6
City has seen preliminary plans; site agreement not necessarily finalized as of 4/1/2017; permit has been issued as of 5/23; construction complete 6/23, awaiting transformer; transformer installed 7/14, awaiting power on / testing; operational 7/187/18/2017
Hampton InnThread
WYGilletteI-904agreement with Hampton Inn completed 5/28/2015; construction reported begun 8/29; operational 9/24/20159/24/2015Hampton Inn, 211 Decker CourtThread
WYJackson

Permit application submitted 4/8/2016; construction started 9/13; awaiting power on and testing 10/7; operational 10/1810/18/2016
Jackson Whole Grocer & Cafe, 1155 South US Highway 89Thread
WYLaramieI-80
8
Tesla says in early stages of deployment as of 4/13/2017; plans submitted to Planning Division in April; plans approved in June; construction well underway 7/11; construction complete 7/19, awaiting transformer & hookup; operational 8/318/31/2017
Fairfield Inn & Suites, 1673 Centennial DriveThread
WYRawlinsI-80
6
Tesla says in early stages of deployment as of 4/13/2017; construction started 7/12; awaiting transformer and hookup 8/12; operational 9/19/1/2017
Fairfield Inn & Suites, 2370 East Cedar StreetThread
WYRock SpringsI-80

Mall manager says construction should start in spring 2017 as of 1/30/2017; construction almost done as of 6/23; awaiting power on / testing 6/28; connected and tested 7/14 but utility needs to fix power quality problems; operational 8/88/8/2017
White Mountain Mall, between Applebee's and Sapporo RestaurantThread
WYSheridanI-904site selected as of 4/20/2015; construction began 6/15; transformer installation 6/26; ready for inspection 7/1; testing expected week of 7/6-7/10; operational 7/157/15/2015Best Western, 612 North Main StreetThread
WYWheatlandI-258Shown in presentation of future supercharger sites to City of Lincoln, NE 8/1/2016; construction reportedly imminent as of 10/11/2017; under construction 4/15/2018; transformer installed 5/14; operational 5/275/27/2018
Heartland Inn & Suites, 1556 Sherard DriveThread
ABCanmore
4summer 2014? Instead of Lake Louise Site selected as of 7/11/2014; permit submitted to city 9/16; construction began 11/6; expected complete 12/15; operational 3/11/20153/11/2015Canmore Rocky Mountain Inn, 1719 Bow Valley Trail
ABEdmonton2/14
8
Construction mostly complete 7/27/2017; operational 8/128/12/2017
Southgate Centre
Thread
ABFort McLeod

Found under construction 8/30/2016; transformer installed, construction continues 9/24; construction complete 10/1, awaiting power on/testing; testing ~11/23; operational 11/2411/24/2016
569 23 Street

ABRed Deer

summer 2014? Site selected as of 7/11; city planning department told Tesla no permit is required (reported 10/3). Operational 1/22/20151/22/2015Sheraton Red Deer Hotel, 3310 50 Avenue
ABRocky View2
8
Construction mostly complete 2/15/2017; transformer installed 2/28; operational 3/143/14/2017
CrossIron Mills Outlet Mall
Thread
BCGolden
4Instead of Lake Louise Site selected as of 7/11; permitting in progress 9/22; permit has been issued 11/12; construction underway 12/5; operational 2/4/20152/4/2014Golden Travelodge, 1200 12th Street North
BCKelowna

On Tesla's 2015 list? Location confirmed by hotel 10/15, under construction 10/28; construction complete and waiting for transformer 11/13; transformer installed 12/16; transformer energized, awaiting testing 12/24; operational 12/2012/30/2015Best Western, 2402 Highway 97Thread
BCMerritt5
8
On Tesla's 2015 list? Under construction 9/30/20161/27/2017
Best Western Plus near Husky Travel Centre
Thread
BCNanaimoBC-19
6
On Tesla's 2015 list? Found with construction mostly complete 6/2/2017; operational 7/207/20/2017
Woodgrove Centre
Thread
BCRevelstoke
4summer 2014? Site selected as of 7/11; approved by city council 9/16; construction started ~11/21; operational 12/3012/30/2014Best Western Plus, 1925 Laforme Blvd
BCSurrey112construction well underway 9/24/2018; awaiting transformer / hookup 10/2; operational 10/610/6/2018
10520 150 StreetThread
BCTsawwasen17
16
Under construction 11/19/2017; operational 12/112/1/2017
5000 Canoe Pass Way, Delta
Thread
BCVancouver - Howe Street122construction well underway 11/2/2018; operational 4/27/20194/27/2019
799 Robson StreetThread
BCVictoria116construction well underway 11/2/2018; operational 12/912/9/2018
3625 Douglas StreetThread
BCWhistler99
10
Operational 1/28/20181/28/2018
Fairmont Château, 4599 Chateau Blvd
Thread
NBAulac26Construction began 5/30/2018; awaiting transformer 7/27; testing 8/8; operational 8/108/10/2018
Irving, 170 Aulac RoadThread
NBLincoln28Under construction 11/6/2018; operational 12/2112/21/2018
415 Nevers RoadThread
NBQuispamsis16Site agreement reportedly in place as of 7/25/2018; under construction 5/22/2019; pedestals installed 10/1; operational 10/710/7/2019
Irving, 8 Millennium DriveThread
NBSaint Leonard18Operational 2/20/20192/20/2019
415 Nevers RoadThread
NBSalisbury26Site agreement reportedly in place as of 7/25/2018; under construction 5/4/2019; pedestals installed 9/24; connected to grid 10/3, awaiting testing; operational 10/710/7/2019
Irving, 2986 Fredericton Road?Thread
NBWoodstock16Site agreement reportedly in place as of 7/25/2018; under construction 5/24/2019; transformer installed 6/26; pedestals installed 9/19; operational 10/910/9/2019
Irving Big StopThread
NSEnfield16Contractor said they have the contract to build the superchargers as of 5/30/2018; construction starting 5/8/2019; awaiting transformer / hookup 6/22; transformer installed 7/2; operational 7/47/4/2019
Irving, 6757 Highway 2Thread
ONBarrie
8summer 2014? Awaiting approval of amendment to site plan 11/14; Tesla says construction started 12/15; construction mostly complete 1/3, awaiting utility transformer; now operational
20 South Village Way - Target parking lot ?Post
ONBarrie II400
20
Construction well underway 10/22/2017; awaiting transformer & hookup 11/24; operational 12/712/7/2017
456 Bayfield Street
Thread
ONBelleville40120Under construction 4/6/2018; transformer installed 5/20; testing 6/6; operational 6/86/8/2018
Quinte Mall, 390 North Front StreetThread
ONBurlington407
16
Under construction 5/9/2018; operational 6/176/17/2018
Mapleview Mall, 900 Maple Avenue
Thread
ONCambridge401
14
Construction mostly complete 1/4/2018; awaiting transformer & hookup 1/28; operational 2/1/20182/1/2018
SmartCentre, 22 Pinebush Road
Thread
ONCasselman417
10
Under construction 11/29/2017; operational 1/19/20181/19/2018
Metro, 21 Richer Close
Thread
ONComber

Tesla says lease negotiations nearly finished 7/1/2014; in permitting process 11/14 and awaiting approval by Ministry of Transportation; Tesla says to break ground soon as of 12/15; under construction 1/17/2015; operational 3/243/24/20157016-7036 Industrial Drive
ONConcord400
20
Under construction 11/10/2017; awaiting transformer & hookup 12/20; operational 12/2112/21/2017
Vaughan Mills, 1 Bass Pro Mills Drive
Thread
ONEtobicoke407
10
Under construction 11/11/2017; awaiting transformer / hookup 2/3/2018; operational 3/63/6/2018
CF Sherway Gardens, 25 The West Mall
Thread
ONGrimsby

Tesla says approaching contruction phase as of 2/21/2016; construction starting 4/18; operational 5/135/13/2016
Casablanca Winery Inn, 4 Windward Drive

ONHamilton403
20
Under construction 11/21/2017; awaiting power on / testing 2/21/2018; operational 4/24/2/2018
CF Lime Ridge, 999 Upper Wentworth Street
Thread
ONHuntsville

construction began 7/15/2016; transformer installed 7/29, awaiting power on & testing; operational 9/309/30/2016
70 King William Street
Thread
ONMarkham407
8
Construction started 10/18/2017; transformer installed while construction continues 12/12; operational 1/31/20181/31/2018
CF Markville Mall
Thread
ONMarkham (Woodside)I-8520Under construction 5/5/2018; operational 6/276/27/2018
Smartcentre, 3075 Highway 7Thread
ONMississauga401/40712SmartCentre spokesperson says coming isoon as of 3/14/2018; city employee says Meadowvale Town Centre and Erin Mills Town Centre as of 5/13; under construction 12/1; operational 1/24/20191/24/2019
Smartcentre, 3155 Argentina RoadThread
ONNorth York401/40420Under construction 1/13/2019; transformer installed 4/11; testing 5/1; operational 5/75/7/2019
1800 Sheppard Avenue EastThread
ONOttawaUrban

Construction mostly done 11/15/2017; operational 11/1811/18/2017
Rideau Center, 50 Rideau Street
Thread
ONOwen Sound

Sources say coming soon as of 10/12/2017; under construction 10/27; awaiting transformer & hookup 2/27/2018; transformer installed 3/17; operational 3/223/22/2018
1555 18th Avenue
Thread
ONParry Sound6

Tesla says will be built summer 2016; Tesla says about to break ground as of 6/27/2016; under construction 7/21; operational 9/29/2/2016
292 Louisa Street
Thread
ONPickering401
16
Under construction 10/23/2017; operational 1/12/20181/12/2018
SmartCentre, 1899 Brock Road
Thread
ONPort Hope

Tesla says near construction stage as of 10/22/2015; found under construction 12/14; operational 12/2012/20/2015Harvey's, Northunberland County Road 28 at 401
ONSudbury80
8
Under construction 10/23/2017; transformer installed 12/5; operational 12/2012/20/2017
SmartCentre Sudbury South near A&W
Thread
ONToronto - Bay StreetUrban
16
Operational 3/23/20183/23/2018
220 Yonge Street
Thread
QCBaie-St-Paul36212Under construction 11/10/2017; awaiting transformer & hookup 12/2; operational 12/2112/21/2017
Hotel Germain Charlevoix, 50 Rue de la FermeThread
QCBrossard10/3012Construction beginning 8/16/2017; operational 10/610/6/2017
Alt Hotel, 6000 Boulevard RomeThread
QCDrummondville20 exit #1778Lease finalized, permitting starting as of 6/19/2014; construction began 11/15 (blog post with lots of details in French here); work seems stalled as of 12/13/2014; work resumed as of 01/12 French details here (pics included)... endless waiting... stay tuned... awaiting transformer installation 3/12/2015; opening is near 03/27/2015 details here (in French); operational as of april 8th4/8/2015755 BOUL. RENÉ-LÉVESQUE TM coming soon page
QCLaval15/44020Plans under review as of 9/29/2017; under construction 10/3' operational 12/3112/31/2017
Carrefour Laval, 3035 Boulevard le CarrefourThread
QCLévis2010In Tesla's book for 2015 (probably by the summer); Tesla says will be ready for construction ~8/8/2016; under construction 6/29/2017; awaiting transformer & hookup 8/15; transformer installed 9/26; operational 10/410/4/2017
IGA, 1060 Boulevard Guillaume-Couture, Saint-RomualdThread
QCMagog108Minor zoning approval needed as of 4/6/2016, construction begun 5/4; construction complete 6/6; connected to grid 6/13; operational 6/226/22/2016
Avril Magog, 2381 rue Principale OuestThread
QCMascouche25/64016Plans under review as of 9/29/2017; under construction 10/3; transformer installed 12/22; operational 12/2912/29/2017
Smartcentre Mascouche, 65 Montée MassonThread
QCMont Tremblant1178Under construction 12/5/2017; awaiting power on / testing 12/22; operational 12/2712/27/2017
Super C, 420 Route 117Thread
QCPointe Claire4020Coming as of 12/2/2017; under construction 4/24/2018; transformer installed 6/27; operational 6/30
CF Fairview, 6815 Route TranscanadienneThread
QCRivière-du-Loup20/1328in Tesla's book for 2015; apparently the lease is finalized... Stay tuned; now stated as Permit status on supercharge.info, the site chosen is at the Hôtel Universel (which has already a Sun Country Highway charger) 4/21, pavement markings 6/9/2016, construction began 8/10; operational 9/209/20/2016
Hôtel Universel, 311 boul de l'Hôtel de Ville, Rivière-du-Loup, QcThread
QCSaint-Laurent1012Found under construction 5/3/2016; awaiting transformer & hookup 5/26; transformer installed 6/2; testing 7/11; operational 7/127/13/2016
3131 Boulevard de la Côte-Vertu
QCSaint-Léonard-d'Aston18Under construction 12/8/2018; awaiting transformer / hookup 12/18; operational 12/1912/19/2018
Madrid 2.0, 180 Rang du Moulin RougeThread
QCYamachiche408In permitting as of 8/17/2018; awaiting transformer 10/19; operational 10/3010/30/2018
La Porte de la Mauricie, 14 Route Sainte-Anne WThread
[/TD] [TD]
[/TD]
[TR]
[TD]VA[/TD] [TD]Strasburg[/TD] [TD]I-81[/TD] [TD]6[/TD] [TD] Approved by planning commission 4/29/2015; construction started ~7/7; transformer installed 8/19; to be tested 9/1; operational 9/2[/TD] [TD]9/2/2015[/TD] [TD]Denny's, 119 Hite Lane[/TD] [TD] Thread [/TD] [/TR]
[/TD][/TR][/TD]
[TD][TR][TD]
There is a list of confirmed and completed Supercharger at supercharge.info[/td][/tr][/td][/td]
 
Last edited by a moderator:
It might be simpler to have one Supercharger Wiki thread. Once an exact address is confirmed, they can be added as 'under construction'. Rumors of sites can go in various regional forums.
 
Last edited:
Port Orange Florida has 6 stations. Should be officially open early next week. And yea, that's a real rainbow!




image.jpg
image.jpg
 

Attachments

  • image.jpg
    image.jpg
    1.1 MB · Views: 194
Cable is the same. It is supposedly for ADA parking but the drivers side would be at the curb. The construction guy said he has to build it per the drawing even if it does not make sense. BTW, this SC is now operational even though it is not officially opened.