Looks like the supercharger map has Quincy coming in Q3, 2022. Particularly critical for me as it would a last barrier for my wife considering only EVs
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I've stopped at that Quincy McDonalds right about where the pin is a few times on the way to and from Leavenworth. Maybe my GPS stats are throwing off their telemetrics.Putting one in Quincy proper doesn't make a ton of sense. It isn't even on a US Highway. My guess is it's something on I-90 that has a Quincy address. Possibly something at exit 151.
I am regularly surprised at the amount of traffic through Quincy.I've stopped at that Quincy McDonalds right about where the pin is a few times on the way to and from Leavenworth. Maybe my GPS stats are throwing off their telemetrics.
BingoPutting one in Quincy proper doesn't make a ton of sense. It isn't even on a US Highway. My guess is it's something on I-90 that has a Quincy address. Possibly something at exit 151.
Drove by today, and as expected, nothing happening, no markings or construction. I don’t expect anything here until after Tesla gets funding from the feds for a V4 (CCS+Tesla) station. Probably nothing until 2023 because I-90 is well-covered by EBurg and Moses Lake.Tesla leaked addresses for coming soon Superchargers. The address for this one is 16010 Rd 1 NW Quincy, WA 98848. It's a Texaco Midway Minimart.
Another nice thing about George WA it’s power comes from Grant County PUD. They generate power from their dam on the Columbia and, along with the Moses Lake Supercharger, ends up costing 3/4 or less than most Superchargers.This'll be a great location for heading to/from Seattle and shows at The Gorge Amphitheater. Google maps says it's just a 9-minute detour.
I've often found myself uncomfortably low after using the AC a bunch at the campground.
It’s Q4 2022 on the map. Doesn’t make sense to wait for funding as they’d have to put the whole SC plan on hold.Drove by today, and as expected, nothing happening, no markings or construction. I don’t expect anything here until after Tesla gets funding from the feds for a V4 (CCS+Tesla) station. Probably nothing until 2023 because I-90 is well-covered by EBurg and Moses Lake.
So looks like it’ll be right next to I90 and not actually in the town on Quincy (10 miles north). Another splitter
I believe GPUD is around $0.024 for commercial customers <500kwh? Just about the cheapest in the country.Another nice thing about George WA it’s power comes from Grant County PUD. They generate power from their dam on the Columbia and, along with the Moses Lake Supercharger, ends up costing 3/4 or less than most Superchargers.
Blackstone has already filed a dig ticket for their next site, IKEA NE Portland, so this should be well underway.Today is supposed to be start-of-construction day. Does anyone feel like driving by and seeing if the shovel has met the dirt?
Ellensburg is now also a v3.I-90
From: Ellensburg, WA (v2) - 43 miles