Supercharger - Quispamsis, NB

What should we call this...

  • Saint John

    Votes: 14 35.0%
  • Quispamsis

    Votes: 25 62.5%
  • Kennebecasis Valley

    Votes: 1 2.5%

  • Total voters
    40

Tz00

3 LR AWD
Jan 5, 2019
274
523
NB, Canada
Another week... Underground wiring appears to be done.

IMG_20190621_181743.jpg
IMG_20190621_181745.jpg
IMG_20190621_181747.jpg
IMG_20190621_181758.jpg
IMG_20190621_181801.jpg
IMG_20190621_181804.jpg
 

Tz00

3 LR AWD
Jan 5, 2019
274
523
NB, Canada
Transformer is in and wires are up on the new pole. NB Power still needs to hook up the far end of the new overhead wires as they are just attached temporarily to the existing pole.

The landscapers were putting down sod around the transformer this morning.

Bags over the stall conduits are now black plastic garbage bags... More UV resistant for longer exposure, or maybe some other reason.

IMG_20190628_121614.jpg
IMG_20190628_122545.jpg
IMG_20190628_122550.jpg
IMG_20190628_122553.jpg
 

NoBeard

Member
Jun 18, 2018
327
486
McLeod HIll, NB
I was at Salisbury yesterday and the tech who had just opened Enfield was in his car doing some complicator work.
We had a chat.
He told me that he had attempted to get 8 more pedestals so as to open Enfield, Quispam, Salisbury and Woodstock all at the same time with 4 chargers each, but had not been able to get 8 more. He said he felt opening them with 2 each was not a good idea for various reasons, and that it was his call that he made.
He also told me that we should expect that given the current massive shortage in pedestals that none of the 3 remaining will be open until August, but that they should for sure be done by the end of August. He's still trying for July, but that seems unlikely.
I am reposting the same info to all 3 affected sites now so people watching just one of them get the same info.
Cheers,
NB
 

Amandeep

Member
Jun 29, 2018
87
35
Ontario, Canada
I was at Salisbury yesterday and the tech who had just opened Enfield was in his car doing some complicator work.
We had a chat.
He told me that he had attempted to get 8 more pedestals so as to open Enfield, Quispam, Salisbury and Woodstock all at the same time with 4 chargers each, but had not been able to get 8 more. He said he felt opening them with 2 each was not a good idea for various reasons, and that it was his call that he made.
He also told me that we should expect that given the current massive shortage in pedestals that none of the 3 remaining will be open until August, but that they should for sure be done by the end of August. He's still trying for July, but that seems unlikely.
I am reposting the same info to all 3 affected sites now so people watching just one of them get the same info.
Cheers,
NB

Thanks
 

mociaf9

Active Member
Oct 18, 2018
2,400
4,836
CA
I think his point is that the pedestal shortage seems oddly limited to Maine and New Brunswick.
I don't think that's true, but that sense is likely exacerbated by the fact that there are so many sites all in such a small area that are all affected. A look through the changes tab on SC.info for North America shows that almost all of the recently opened locations are either 72 kW, and therefore unaffected because they use different pedestals, or they were already in construction or built for a long time but had slow progress or a long wait for utility hook-up and/or activation. Just off the top of my head and a quick look at SC.info, other sites that are also currently affected but not in ME or NB include: Blaine, WA; Albert Lea, MN; Swartz Creek, MI; Hudsonville, MI; Henrietta, TX; Burleson, TX; and Salem, VA. There's probably others as well and some locations are too new to tell whether they're affected or not.
 

Mark sj

Member
May 26, 2019
12
47
Canada
Was at a meeting uptown this week with Irving oil who was talking about electric vehicles and how they plan to support the needs of the EV customers. Irving is actually building 4 of their own style electric chargers at the uptown office. Great to see Irving supporting the EV community.
 

Attachments

  • IMG_20190807_1105175.jpg
    IMG_20190807_1105175.jpg
    220.2 KB · Views: 39
  • IMG_20190807_1118130.jpg
    IMG_20190807_1118130.jpg
    201.4 KB · Views: 36
  • IMG_20190807_0951131.jpg
    IMG_20190807_0951131.jpg
    266.3 KB · Views: 539
  • IMG_20190807_1159122.jpg
    IMG_20190807_1159122.jpg
    597.6 KB · Views: 37
  • IMG_20190807_1145516.jpg
    IMG_20190807_1145516.jpg
    223.4 KB · Views: 37

About Us

Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.

Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


SUPPORT TMC
Top