Got a break in the weather about the time errands took me somewhat close, so stopped by.
Looking West
Concrete poured for V3 cabinets and switchgear
Transformer pad set in place.
Looking South, some details:
The switchgear has a pre-cast pad that the concrete has been poured around.
Pull Twine has been run to pedestals from V3 cabinets.
Concrete has some kind of curing coat on it, likely for the cold weather, but the forms have been stripped already, so it was poured on a previous day.
Looking West
Concrete poured for V3 cabinets and switchgear
Transformer pad set in place.
Looking South, some details:
The switchgear has a pre-cast pad that the concrete has been poured around.
Pull Twine has been run to pedestals from V3 cabinets.
Concrete has some kind of curing coat on it, likely for the cold weather, but the forms have been stripped already, so it was poured on a previous day.