M
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Yes,it faces the trail.Ooh, this might be visible from the Washington & Old Dominion Trail. Even if not, there's a short connection between the trail and the northwest corner of the site. I frequently ride my bicycle along that stretch of the trail, especially in warmer weather, so I might be able to keep an eye on this one.
Still a whole lotta nothin' to report here, as of yesterday. And Fairfax changed their online plan/permit lookup system, which has made it more difficult to search. (Pretty sure I searched correctly but still didn't find anything.) Someone did, however, clear a much wider section of brush along the path from the parking lot to the W&OD trail, which made the bike connection a bit easier.
I'll continue to detour over here every so often when I'm passing by on the trail, but I doubt I'll post further unless there's a substantive change. (Although if anyone wants me to keep posting here regardless, just let me know!)
View attachment 871895View attachment 871896
Fair point. Will do. Posts might be a bit shorter though, if the current pace of construction is any indication. And my posts will be less frequent regardless, as the weather turns colder / less bike-friendly and it gets dark earlier.Please post when you stop by - that could save someone else a trip to check it out.
"No change" is sufficient.Fair point. Will do. Posts might be a bit shorter though, if the current pace of construction is any indication. And my posts will be less frequent regardless, as the weather turns colder / less bike-friendly and it gets dark earlier.
Also notably, I can't find anything for this project at - FIDO - Fairfax County, Virginia - which leads me to believe it's still a long way off.
TESLA PROPOSED ELECTRIC VEHICLE CHARGING STATION: INSTALL (3) TESLA PRE-ASSEMBLED SUPERCHARGER UNITS EACH WITH (1) SUPERCHARGER CABINET, (1) 600A SERVICE DISCONNECT & (4) CHARGE POSTS · INSTALL (1) UTILITY TRANSFORMER, CT CABINET, & METER. CONTRACTOR TO BEDETERMINED. ****DO NOT ISSUE PERMIT UNTIL GENERAL CONTRACTOR INFORMATION IS PROVIDED.***** |