La Pocatière makes sense. Half way between Lévis & RDL.There’s probably construction at Sainte Anne des monts and other gaspe ones.
I’ve heard something is happening between Rivere du loup and Levis. Maybe la pocatiere
I’ve heard something is happening between Rivere du loup and Levis. Maybe la pocatiere
Best place would be at La Halte des Seigneurie in St-Roch-des-Aulnaies. On the side of highway 20 with Depanneur Restaurant and there are already 2 DCFC from Circuit Electrique.Apparently, they never reached an agreement in La Pocatière. The last word is that they're looking at Montmagny.
I'm going in that area tomorrow any tips where it could be?La Pocatière makes sense. Half way between Lévis & RDL.
Levis and Rivière-du-Loup none yet between the 2 cities.I'm going in that area tomorrow any tips where it could be?
Marco posted in Tesla model 3 Quebec, and I reposted it in the eastern Ontario thread.I'm going in that area tomorrow any tips where it could be?
It would be more logical if it was at the St-Hubert/Econo Lodge right off the exit.Marco posted in Tesla model 3 Quebec, and I reposted it in the eastern Ontario thread.
——
Un nouveau Supercharger s'en vient bientot à Montmagny!! Je ne sais pas si la station est en construction ou non, mais on m'a dit qu'elle sera ouverte d'ici la fin de l'année. Sebastien Raiche
Lieux à surveiller:
IGA Extra Montmagny (70 Bd Taché O)
Tim Hortons (90 Rte Jean-Baptiste-Casault)
Saw a drone footage video, but it's just a big pile of dirt, and a lot of equipment. Nothing Tesla pointing yet.any update on this location?
Not open yet. You would have more chance with the one in Matane. It is ready but the power is still off.Any updates on this. We are planning a cross country trip going through route in the summer. Eagerly waiting for this to go live.
Hopefully they will open before July!Not open yet. You would have more chance with the one in Matane. It is ready but the power is still off.