Thank you for all the pictures. Was wondering on the progress of this Urban Supercharger location. This one is a little ahead of the Lincoln site. 2 unknowns for when the Tesla equipment is on site and cabled up and Roseville Electric Utility equipment & transformer arrives and hooked up. Then the inspection by the city & testing by Tesla.
A week later, not much progress... Perhaps it's still a toss-up between this site and Lincoln as to which one gets done first.
Thanks for letting us know. I can’t tell from your photos if the charging cables are in place or not to see if they are the new thinner V3 type. Could you?
The pictures in Post #4, #7, #20, #22 show the conduit stubs for the Supercharger cabinets. The layout of those conduits indicates V2 cabinets will be used.
Drove by today and took a few photos and talked to the workers that were there. They told me it should be open soon but not sure just when.
Suspect these will replace the ones across the street as the official Tesla supercharging map does not show these new ones as "coming soon".
Superchargers popping up that weren’t on the official coming soon map is not unusual. Stopped by today and no progress has been made since the last update
The Tesla Find Us page map is not always accurate. It really is more of a suggestion, than a prediction.
I’m a local so would not benefit me either way as really just need them for long-distance travel. But if the old Galleria stations remain up that would be nice as access to the mall is easier.
At least the charger cabinets are on-site now. They need to be installed and wires pulled to the pedestals and the distribution cabinets.