To be fair, I’m usually at the end of a days travel up from NS headed elsewhere.I've never been when there wasn't a lineup, with at least one SC out of order. You've been super lucky.
To be fair, I’m usually at the end of a days travel up from NS headed elsewhere.I've never been when there wasn't a lineup, with at least one SC out of order. You've been super lucky.
Passed by today. All chargers are in their locations and crews are working on electrical connections. Talked to the site mgr, parts availability and workforce are the main reasons why this site is not completed. Hydro Quebec is not the main bottleneck according to him. They expect the site to be online by December.
Thanked them for their work and left. Sorry I didn’t take pictures maybe on my way back tomorrow.
There's a tunnel?Just in time for the tunnel to become a PITA. I probably won't pass by there often for the next 3 years![]()
From Montreal to the south shore. There are other bridges, but it will be difficult for the time being... Unless you absolutely need to go to the south shore before Quebec, it will be easier to take the 40 for the next 3 years.There's a tunnel?
Cool thanks for the update. I was passing by today and looks like I won't need to stop 😄A friend of mine, Mary L, took this photo. Still no transformer and the pedestals are winterized. View attachment 874557