Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Santa Ana, CA (12 V2 stalls)

This site may earn commission on affiliate links.
Let's see if the "missing" pictures can be uploaded. Seems to have worked. Not sure why it wouldn't in the first place. I guess I exceeded some limit.
 

Attachments

  • 20160930_112503.jpg
    20160930_112503.jpg
    605.1 KB · Views: 195
  • 20160930_115026.jpg
    20160930_115026.jpg
    412.5 KB · Views: 183
  • Informative
  • Like
Reactions: DDotJ and ggnykk
Frankly, I think it's all still at a stage where the cosmetics (striping, painting, etc.) will come last. I don't think they can do the final bits until the third sign is completed. Too many large vehicles such as a crane will be operating nearby. We'll see eventually, of course, but I'm pretty sure we've not seen the painting completed.
 
I went by the site about 11:15 today and found that the construction fences have been taken away, bumpers installed, and about ready for prime time . . . or so I thought. I saw a fellow doing some final touches on the stalls who was quite friendly and accommodating. It turns out he is the person in charge of the installation (perhaps the owner) who was very informative. He even gave me tour of the "innards" of the super charger. (Some of that is in the photos attached.) Further, he informed me that the city was coming by Monday for an inspection. I believe he said that his job was done. Alas, there is no transformer installed. That's up to Edison, he said. They have to run a long wire(s) to the transformer and it would be a big deal, he indicated. There is still a construction fence around the sign area, and that intrudes on access to some of the stalls. (See photo of the sign area.) I can't imagine they will open the super charger until all of that clutter is out of the way. Again, as a reminder, a sign company fellow said their deadline is the end of the month. The contractor also indicated he thought the SC wouldn't be available until about the end of the month, perhaps a tad sooner. Progress is afoot!!
20161007_111251.jpg
20161007_112811.jpg
20161007_111822.jpg
20161007_111659.jpg
20161007_112927.jpg
 
Stopped by Saturday, October 8, and hey is mine the first Model S to park in a Supercharger stall here?

SASC161008.jpg


I reached in the dispenser and tried the trigger but it didn't trigger my charging port, so no juice. I shot the picture standing on the pad for the missing transformer, so that would explain it.
 
20161026_101355.jpg
Just stopped by and took the three photos attached. I talked to an electrician Monday who told me the city inspection was completed and their work is done. You'll see that the large video screen mount is under construction. I am still figuring it has to be completed before the SC opens. And there's that minor detail of the missing transformer! The electrician had no idea about that. He did say he figured the SC would open in no more than a month. Groan.
20161026_101349.jpg
20161026_101606.jpg
 
Last edited: