No progress in the past week. Looks like they are waiting on items to arrive. Still missing a cabinet and some superchargers. Also a pic of the pad I assume would be for the transformers mentioned above.
Is this timeframe common for these types of installations, or has Covid caused delays in this project? Super excited for this SC site as I am a new Tesla owner, without a 240V outlet. Drive by everyday hoping to see progress.
Is this timeframe common for these types of installations, or has Covid caused delays in this project? Super excited for this SC site as I am a new Tesla owner, without a 240V outlet. Drive by everyday hoping to see progress.
Is this timeframe common for these types of installations, or has Covid caused delays in this project? Super excited for this SC site as I am a new Tesla owner, without a 240V outlet. Drive by everyday hoping to see progress.
Just drove by and there are multiple trucks from the power company out on the streets and inside the SC construction site. I think this might be the day
Just drove by and there are multiple trucks from the power company out on the streets and inside the SC construction site. I think this might be the day
I have seen three L2 Chargepoint chargers there. I was hoping they would install a fast charging Chargepoint with a Chademo interface.
The latter may be free or 2-3 times less expensive than supercharging.
wildguess,
Thanks for keeping us updated on the progress (or such). The site plan shows two single port and one dual port Chargepoints. Your photos show the three chargers which should hook up four J1772 vehicles. We will just have to keep our fingers crossed for the transformer...
wildguess,
Thanks for keeping us updated on the progress (or such). The site plan shows two single port and one dual port Chargepoints. Your photos show the three chargers which should hook up four J1772 vehicles. We will just have to keep our fingers crossed for the transformer...
Spoke to a couple of electrical type folks (not SCE) this afternoon and they claimed "very soon" with regards to the transformer install. They agreed with my thought that the fires were slowing down an already slow process. SCE for the win!
Large vehicles and the white pickups from a few days ago onsite this morning. Could not stop but will update on the way home this evening. Friday 09/18
Large vehicles and the white pickups from a few days ago onsite this morning. Could not stop but will update on the way home this evening. Friday 09/18