Dropped by the Markham Woodside SC to take some pictures of the progress earlier this afternoon. As Avronp mentioned no cables pulled. However, the conduits all have strings coming out of them so just a matter of time before they pull cables through. The chargers are on their pad. The individual charging pads are in plus the signage posts beside them. Found the 10th charge pad behind the wooden pallets in my picture. It's one of the pull in type vs. the back in. The only work being done was the Porta Potty vac truck cleaning it out to get it ready for the work week. It's a holiday here in Ontario today so no construction work being performed. I took pictures from the other side of the driveway where the other 10 chargers will be installed as well.