Sounds like we're still waiting for BC Hydro green Transformer box and Hydro meter.

If someone has some time on their hands they could venture out to site and take picture of green BC Hyrdo transformer box or empty concrete pad where it is to be installed. And hydro meter. That would make us supercharger-geeks happy. :)

Here is an example of what they look like at another site (transformer and meter installation spot w/ no meter):
Supercharger - Merritt, BC
 
Sounds like we're still waiting for BC Hydro green Transformer box and Hydro meter.

If someone has some time on their hands they could venture out to site and take picture of green BC Hyrdo transformer box or empty concrete pad where it is to be installed. And hydro meter. That would make us supercharger-geeks happy. :)

Here is an example of what they look like at another site (transformer and meter installation spot w/ no meter):
Supercharger - Merritt, BC
I'm not sure about the meter, but the transformer is in place!

Edit: taken just moments ago. We had to stop at Save On for a couple of things anyway.

2nd edit: is that a meter on the side of the white unit in the background of the first photo?
 

Attachments

  • PXL_20220116_033316801.jpg
    PXL_20220116_033316801.jpg
    695.7 KB · Views: 119
  • PXL_20220116_033259814.jpg
    PXL_20220116_033259814.jpg
    568.3 KB · Views: 64
Last edited:
That is the meter box but sometimes the box is empty. Would need to see a close-up head-on photo of the meter box to know for sure. And yes, I have seen the meter be the hold up for a supercharger opening before.
Oh shoot wish I'd noticed it before I had left. I'll try to pop back over in the couple of days unless someone beats me to it.
 
  • Like
Reactions: PLUS EV
Took these pics a couple days ago but I've got a big update here. Next Monday the 24th BC Hydro is shutting power off to Save On and Staples from 8am-6pm. Generators are being brought in to cover while they perform the work. I'll be here that day so I'll definitely be getting lots of pictures and I'll make sure to update when they're here. (there is a chance it gets rescheduled of course)

Meter installed:
PXL_20220114_000400334.jpg


Remnants of graffiti and cabinet left unlocked:
PXL_20220114_000404317.jpg


Supercharged stations with covers knocked off:
PXL_20220116_212041836.jpg

PXL_20220116_212048007.MP.jpg
 
Thanks @joshuajag! What are they pumping? Just curious. Also, if you're able to share, what's your involvement? Do you work in the complex, or are you on the project or something?
I think it would be for any water that seeps into the hole they are digging. I'll send you a DM.

Some more pics. Fun fact the generator is capable of 1MW, but Save On is only using about 400 KW.
PXL_20220124_214054700.jpg

PXL_20220124_201134348.jpg

PXL_20220124_214624655.jpg
 
Seems

No, doesn't look like any Tesla presence here. BC Hydro has just left and I think they are switching Save On back to the grid after closing.

I have some more pictures I will post a bit later.

Sorry for the late update. Here are some more pictures from Monday's work:

PXL_20220124_233828314.jpgPXL_20220124_233852277.jpgPXL_20220125_010135106.MP.jpgPXL_20220125_023512911.jpg

I didn't get many pics of it, but the 2nd picture is of the truck on the opposite side of the mall access road. That is where the power is fed from (and for the whole complex). New sump pumps were installed there as well. I also heard that while shutting power down the morning of they accidentally turned off power to the Starbucks building! Some markings were also done wrong as well by the initial construction crew that BC Hydro had to correct for.

Does anyone know what kind of connectors are in the 3rd pic?
 