Nogassssssss
Member
Sounds like we're still waiting for BC Hydro green Transformer box and Hydro meter.
If someone has some time on their hands they could venture out to site and take picture of green BC Hyrdo transformer box or empty concrete pad where it is to be installed. And hydro meter. That would make us supercharger-geeks happy.
Here is an example of what they look like at another site (transformer and meter installation spot w/ no meter):
Supercharger - Merritt, BC
If someone has some time on their hands they could venture out to site and take picture of green BC Hyrdo transformer box or empty concrete pad where it is to be installed. And hydro meter. That would make us supercharger-geeks happy.
Here is an example of what they look like at another site (transformer and meter installation spot w/ no meter):
Supercharger - Merritt, BC