You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Also, wire doesn’t appear to be pulled, some conduit still in wraps on parking lot. Crew had no idea when the transformer would get there. I’ll be back for more photos on Thursday.
Thanks for the update! A good question to ask these crews are if they are working on any other Tesla projects. They often have a lot of good intel on the status of other projects (even ones we may not know about).
Supercharger equipment all in, workers had tidied the site up and left. It appears wiring will be pulled into pre assembled Supercharger units later, looks like transformer will be placed in or next to precast vault in back area.
An 8-stall Supercharger is coming soon to the Big B Truck Stop in Tokio, about 10 miles NE from the current Ritzville Supercharger. An 811 ticket was filed yesterday by Blackstone Construction for the build.
An 8-stall Supercharger is coming soon to the Big B Truck Stop in Tokio, about 10 miles NE from the current Ritzville Supercharger. An 811 ticket was filed yesterday by Blackstone Construction for the build.
The address for the Big B Truck Stop is listed as 2008 Durry Rd, Sprague, WA 99032 on Google. So these are one and the same and since it says Sprague on the Tesla Map now, it will likely continue that way. So the other thread should be merged with this one and the title changed to Sprague.